Laserfiche WebLink
b. South of powerline—2018 <br /> North of powerline to Street 2—2019 <br /> Given the site's history of ownership, it is requested that the park be named in memory of Arthur <br /> Arcand. <br /> SNOWMOBILE TRAIL <br /> It is understood that there is an existing snow mobile trail within the powerline easement that turns <br /> south over the proposed 85-foot lots. In the future, the trail can continue to be used within the <br /> powerline easement, only. Due to future home locations, a north/south trail will not be <br /> permissible/possible. <br /> HOMEOWNERS ASSOCIATION <br /> The overall site will be governed by a master homeowners' association with 3 individual sub- <br /> associations professionally managed by <br /> Master HOA. The Master Association will be responsible for a number of amenities that benefit the <br /> neighborhood as a whole, mainly the water reuse mainline system and pumps. Additionally, the <br /> Master will be responsible for maintaining the Neighborhood entrance monument and landscaping <br /> features, specifically the buffer plantings along 130`'St. <br /> Villas HOA. The Villas will be responsible for summer&winter grounds maintenance for each <br /> unit, including irrigation, mowing and snow removal. Additionally, they will own and maintain <br /> Outlots E and F as well as maintain the island plantings in Street 6 as shown on Preliminary Plat. <br /> Single Family HOA (65', 70', 85'). This Single Family HOA will mainly be responsible for <br /> architectural control of the homes located on their respective lots. The HOA will likely contract for a <br /> single trash hauler, as well. <br /> Single Family HOA (50'). This sub-neighborhood consists of the small single family lots located in <br /> the northwest corner of the site. Not only will they be responsible for architectural control of the <br /> homes, but also trash hauling and maintenance of the island located in Street 13 of the Preliminary <br /> Plat. <br /> CONSTRUCTION SCHEDULE <br /> Upon EAW,Wetland Replacement, Preliminary Plat&PUD approvals, the south portion of the site <br /> is anticipated to be graded in May 2017 followed by street and utility construction for the Pt phase <br /> area. Lot delivery is planned for September 2017. Subsequent phasing will be dependent on market <br /> demand and conditions, but anticipated to occur over the next 5 years. <br /> Adelaide Landing Preliminary Plat/PUD—Narrative EXCELSIOR <br /> 6 •77MEXM&WcM.P <br />