My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 04.27.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 04.27.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:37:25 AM
Creation date
12/10/2018 8:30:36 AM
Metadata
Fields
Template:
Commissions
Meeting Date
4/27/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\/ 7 <br />/ V <br />I <br />/ 66 <br />� � V <br />L_Lj <br />/ <br />V <br />/ <br />0 <br />V - 0 <br />/ D <br />E <br />W / s <br />H (SU <br />r1M9�31.3 <br />1 <br />=1= L SUMP:92 .22� I� <br />I - - INV: 27. 2 <br />CC -153' o HDPE •& <br />/ <br />0 1 <br />17' 15' HDPE 63% <br />EX. HYD T' <br />ti o .7 <br />V_ FES 3 <br />15" HDPE FES W/ 11 <br />0 TRASHGUARD & <br />/ 4.9 CY CL III RIPRAP ' <br />V CO INV.927.11 Q� <br />b <br />FES 4 <br />J 15 / <br />RCP FES W/ 24S HDPE FES- <br />I, J? & <br />V o 4.8 CY CL III RIPRAP 9.5 CY�CLDIII RIP AP <br />li INV:928.80 INV:927 001 <br />/ 27' of 27" HSE © 0.29 <br />V I _ 8 DIP WATER SERVICE <br />6" PVC SAN SEWER SERVICE <br />L <br />CBMH 5 <br />RIM:933.62 <br />E INV:928.18 <br />W INV:927.98 <br />STRUCTURE SCHEDULE <br />STRUCTURE STRUCTURE <br />NO. SIZE <br />CB 1 27" <br />CB 2 27" <br />CB 3 27" <br />CASTI NG <br />NEENAH R-2502* <br />NEENAH R-2502* <br />NEENAH R-2502* <br />CBMH 1 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 2 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 3 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 4 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 5 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 6 <br />48" <br />NEENAH R <br />-3250-A <br />CBMH 7 <br />48" <br />NEENAH R <br />-3250-A <br />STMH 1 48" NEENAH R-1642** <br />STMH 2 48" NEENAH R-1642** <br />*WITH TYPE C GRATE <br />**LABELED "STORM SEWER" <br />CBMH 6 <br />RIM:933.62 <br />13 E INV:928.85 <br />of 12„ HD E _ W INV:928.85 <br />0. 09 _ <br />7 1K7 <br />_L X26' Of <br />_ <br />-- G <br />8 ��) Tl <br />11 - <br />1_ <br /><aa°< <br />PROPO <br />SEp BVD <br />Lp/N <br />/ <br />CONNECT TO 0' MIN RI 1 \\ EXISTING RM* V:92* 0 <br />R 1 CBMH 2 S IN:928.50 <br />V 666 L _I = �RVICE RIM:933.70 20' of 12" HDPE © 1.03% <br />< E INV:927.44 <br />_ 1 W INV:927.44 STMH 1 CB 2 <br />RIM:931.70 RIM:931.50 <br />1 1 <br />< - _ CLEANOUT E INV:927.86 S INV:928.76 <br />116' Of2 ; _ _ / II N INV.928.29 15' of 12" HDPE 0.95% <br />HDPE 0. 30,% =C �� W INV.927.66 STMH 2 <br />_ - <br />- - RIM:931.80 <br />cc�60 - g8��_-_ �� E INV:928.22 <br />of 24» _ _ N INV:928.62 <br />CONNECT TO EX SAN SEWER - _- _ NDP <br />W INV:928.22 <br />I STUB, INSTALL CLEANOUT AT - = _ E Q 0.25 0 s \ \ <br />3 <br />RIM: <br />W INV 29.50 <br />NOTES: <br />1. EXISTING CONDITION INFORMATION PER CERTIFICATE OF SURVEY PREPARED BY E. G. RUD AND SONS, INC. AND CITY <br />RECORD PLANS. <br />2. THE LOCATION AND ELEVATION OF ALL EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO <br />CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY CONFLICTS. <br />3. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES TO ALLOW PROPER FUNCTIONING DURING <br />AND AFTER CONSTRUCTION. SUPPORTING STRUCTURES, IF REQUIRED, SHALL BE SUPPLIED BY THE CONTRACTOR AS <br />WORK INCIDENTAL TO THE CONTRACT. <br />4. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONFLICTS BETWEEN EXISTING UTILITIES AND THE <br />PROPOSED CONSTRUCTION. THE ENGINEER WILL COORDINATE WITH UTILITY COMPANY IN QUESTION TO DETERMINE THE <br />NEED FOR RELOCATION OF THE EXISTING UTILITY. <br />5. EXISTING CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES SHALL BE IDENTIFIED BY THE CONTRACTOR AND <br />THESE SHALL BE REPORTED TO THE ENGINEER PRIOR TO EXCAVATION BY THE CONTRACTOR. ONCE CONSTRUCTION <br />HAS BEGUN, ALL DAMAGE TO UNDERGROUND UTILITIES WILL BE ASSUMED TO HAVE BEEN CAUSED BY THE <br />CONTRACTOR, AND REPAIRS NECESSARY SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. <br />6. FINAL PLAT SHALL GOVERN FOR EASEMENTS AND LOT LINES. <br />7. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL JURISDICTION TO OBTAIN PERMITS AND METER FOR WATER <br />SOURCE. ALL ASSOCIATED COSTS SHALL BE INCIDENTAL TO THE CONTRACTOR, INCLUDING DISPOSAL OF TEST WATER <br />INTO CITY'S SANITARY SEWER SYSTEM. THE CONTRACTOR SHALL NOT OPERATE GATE VALVES OR HYDRANTS ON THE <br />CITY WATER SYSTEM WITHOUT FIRST RECEIVING CITY APPROVAL. <br />8. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER AND THE PROJECT ENGINEER 48 HOURS PRIOR TO STARTING <br />WORK OR AS REQUIRE BY THE CITY. <br />9. THE CONTRACTOR SHALL KEEP ACCESS ROADS CLEAR OF SOIL OR OTHER DEBRIS, AND PERFORM DAILY STREET <br />CLEANING AS REQUIRED. POSITIVE DRAINAGE, CONTROLLED WITH EROSION CONTROL AND EROSION PREVENTION <br />MEASURES AS REQUIRED SHALL BE PERFORMED. INLET PROTECTION SHALL BE INSTALLED WITHIN 48 HOURS AFTER <br />INLET CONSTRUCTION. UNLESS SPECIFIED ON THE PLANS OR AS A BID ITEM ON THE BID FORM, ANY TEMPORARY <br />CULVERTS, DITCHES, FILTER FABRIC, ETC. NECESSARY TO ACCOMPLISH THIS SHALL BE PERFORMED AS INCIDENTAL TO <br />THE CONTRACT. <br />10. THE CONTRACTOR SHALL PRESERVE AND PROTECT THE MARKERS AND MONUMENTS SET FOR THE SUBDIVISION OF <br />LAND. <br />11. THE CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER TO FACILITATE CERTIFICATION OF ALL CONTROLLED FILLS IN <br />A TIMELY FASHION. DENSITY TESTS SHALL MEET THE FOLLOWING: <br />A. DENSITY TESTS SHALL BE TAKEN ON ALL TRENCHES AT LOCATIONS AS DETERMINED BY THE ENGINEER OF HIS <br />REPRESENTATIVE. <br />B. WITHIN 3 FEET OF PAVEMENT SUBGRADE, CONTRACTOR SHALL UTILIZE IMPROVED SOILS THAT ARE WITHIN 1 <br />OPTIMUM MOISTURE CONTENT. COMPACTION SHALL MEET 100% STANDARD PROCTOR. BELOW THE UPPER 3FEET, <br />COMPACTION SHALL BE 95%. GRADING TOLERANCE SHALL BE 0.1'. <br />12. THE OWNER SHALL PAY FOR ALL COMPACTION TESTING. ANY AREAS WHICH FAIL TO MEET THE ABOVE STANDARDS <br />SHALL RE CORRECTED AND RE -TESTED BY THE OWNER'S TESTING AGENT AT THE CONTRACTOR'S EXPENSE. <br />13. SANITARY SEWER AND WATERMAIN SHALL BE INSTALLED AT ELEVATIONS SHOWN ON THE PLAN. <br />14. WHERE WATERMAIN MUST BE LOWERED TO AVOID CONFLICT WITH ANOTHER UTILITY, THE COST OF BENDS, FITTINGS, <br />ETC. SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT. <br />15. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL IN COMPLIANCE WITH THE CURRENT MNDOT "TEMPORARY <br />TRAFFIC CONTROL ZONE LAYOUTS FIELD MANUAL" FOR CONSTRUCTION ADJACENT TO TRAVEL WAYS. <br />16. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE DEPTH OF EXISTING UTILITIES LISTED ON THIS PLAN <br />PRIOR TO ORDERING OF ANY FITTINGS, STRUCTURES, CASTINGS, ETC. ENGINEER AND THE OWNER SHALL NOT BE <br />RESPONSIBLE FOR ANY DISCREPANCIES FOUND AS DEPTHS ARE ESTIMATED. <br />17. CONTACT CITY FOR INSPECTION PRIOR TO CONNECTING TO EXISTING CITY UTILITIES. <br />18. CONTRACTOR TO COMPLY WITH ALL REGULATORY AGENCY PERMIT CONDITIONS FOR PERMITS OBTAINED BY OWNER <br />AND FOR PERMITS OBTAINED BY GENERAL CONTRACTOR. <br />19. ALL WORK PERFORMED AND MATERIALS USED FOR CONSTRUCTION OF UTILITIES MUST CONFORM TO THE CITY OF <br />HUGO STANDARD SPECIFICATIONS AND DETAILS. <br />20. ALL SANITARY SEWER SHALL BE EITHER 8" OR 6" PVC SDR 35. <br />21. WATERMAIN SHALL BE 6" AND 8" DIP CLASS 52. <br />22. ALL WATERMAIN SHALL BE INSTALLED WITH 7.5' COVER MINIMUM. <br />23. VERIFY LOCATION OF FIRE DEPARTMENT CONNECTION (FDC) WITH MECHANICAL ENGINEER. <br />24.INSTALL SERVICES TO WITHIN 5' OF THE BUILDING. VERIFY LOCATION WITH MECHANICAL ENGINEER. <br />25. RECORD INFORMATION ON SANITARY SEWER AND WATER STUBS WERE NOT AVAILABLE. CONTRACTOR TO VERIFY <br />LOCATION AND ELEVATION OF EACH. <br />26.INSTALL RIP RAP AND FABRIC AT FLARED END SECTIONS PER HUGO STANDARD PLATE WY -SD -6. <br />i <br />� 1 <br />_ 1 <br />1 <br />CA S ' <br />1 <br />0 TRUCKS 1 <br />TRU KS HSS p01NT BEYOND ' I <br />1 <br />1 1 <br />1 <br />I 1 <br />FUTURE ExPANS1 <br />128x' 64 � ON ' 1 <br />1 <br />1 / <br />1 <br />V 6o CONNECTION, VERIFY SIZE, - _ _ - << <br />LOCATION & ELEV. 90' of 18 HD 0.407 << <br />> CBMH 1 (SUMP) �� - _ � <br />51 of 15 RCP @ 2.88% RIM:931.70 - <br />SUMP:924.09 _ C <br />INV:927.09 <br />EXISTING CBMH _ ICS <br />INV:927.09 <br />REMOVE EXISTING CASTING & REPLACE W/ NEENAH R -3501 -TB - _ of \ <br />C <br />RIM=929.66 <br />_ pF <br />1 _ <br />SINV=926.93 (VERIFY) <br />NE INV=927.33 - <br />GOVERNING SPECIFICATIONS: <br />1. THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD <br />SPECIFICATIONS FOR CONSTRUCTION" LATEST EDITION & SUPPLEMENTS. <br />2. CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD UTILITIES <br />SPECIFICATIONS. (LATEST EDITION) <br />3. ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND ORDINANCE WILL <br />BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. <br />4. CITY OF HUGO STANDARD SPECIFICATIONS & DETAILS. <br />1 CBMH <br />::::�� <br />RIM:932.05 <br />1 S INV:928.93 <br />W INV:928.67 <br />i 1 f 15" HDPE © 0.46% <br />0 � 1 <br />L D <br />BLOCK 1FES INV:929 00� <br />1 <br />1 <br />� 1 <br />1 <br />/ <br />1 <br />�- D <br />D <br />- 0 <br />1 6 <br />- o <br />LOT 1 <br />/NDUS T/� / 4 L <br />60 <br />i <br />932.10 <br />2 <br />0 <br />932.34 <br />932.94 <br />PROPOSED IMPROVEMENT FOR: <br />Western Spring <br />Manufacturing <br />HUGO, MINNESOTA <br />Linner-Morschen <br />Arch itects <br />10100 Morgan Avenue S. <br />Bloomington, MN 55431 <br />PHONE: (952) 884-6455 <br />FAX: (952) 884-0860 <br />CAMPION <br />N ENGINEERING <br />SERVICES, INC. <br />• Civil Engineering • Land Planning <br />1800 Pioneer Creek Center, <br />P.O. Box 249 <br />Maple Plain, MN 55359 <br />Phone: 763-479-5172 <br />Fax: 763-479-4242 <br />E -Mail: mcompion@campioneng.com <br />I hereby certify that this plan, specification <br />or report has been prepared by me or <br />under my direct supervision and that <br />I am a duly licensed Professional Engineer <br />under the law,of the ate of Minnesota. <br />71] 932.93 04/05 2017 <br />Martin P. Campion -Lic. # 19901 Date: <br />3.60 H IN CAMPION JOB NO. 16-039 <br />932.44 <br />PROPOSED BY: <br />r <br />97 -- <br />N <br />0 30 60 <br />GRAPHIC SCALE IN FEET <br />CONSTRUCTION <br />7685 CORPORATE WAY <br />EDEN PRAIRIE MN <br />952 937 8214 <br />WWW.SHAWCONSTRUCT.COM <br />SHEET TITLE: <br />UTILITY PLAN <br />DATE: 03/15/2017 REVISION <br />04/06/2017 PER 04/03/2017 <br />ENGINEERS MEMO <br />DRAWN BY: KDK <br />SHEET NO. <br />C 3.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.