My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 04.27.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 04.27.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:37:25 AM
Creation date
12/10/2018 8:30:36 AM
Metadata
Fields
Template:
Commissions
Meeting Date
4/27/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />PREFINISHED SINGLE PLY EDPM PREFINISHED SINGLE PLY SDPM <br />METAL GOPING METAL GOPING <br />2 LAYERS INSULATION 2 LAYERS INSULATION <br />TREATED 2X TREATED 2X <br />BLOGKING 1 1/2" METAL DEGIG BLOGKING 1 1/2" METAL DEGIG <br />T.O.P. TO**P* <br />125'-0" :X XXXXFXXX.6x 125'-0" (126-6" GRIDS 5-4) <br />�EDEGI< BEARING JOIST BEARING SINGLE PLY EDPM <br />L. VARIES - ' 124'-O" - <br />2 LAYERS INSULATION <br />1 1/2" METAL DEGIG <br />PREFIN. DRIP <br />FLASHING & <br />GOVT. SEALANT STEEL BEAM <br />SEE STRUGTURAL WINDOW HEAD SEE STRUGTURAL <br />FOR JOIST SPAGING 120'-8" FOR JOIST SPAGING <br />WINDOW HEAD <br />I <br />45" X 45" <br />4a <br />WINDOW UNIT <br />STEEL BEAM <br />118'-8" <br />M EZZA N I N E SEE STRUGTURAL <br />FOR JOIST SPAGING <br />PREFIN. SILL <br />FLASHING & <br />GOVT. SEALANT <br />PREGAST INSULATED WALL PANELS <br />WITH STANDARD SMOOTH EXPOSED <br />BENT PLATE AND <br />AGGREGATE KRAEMER LIMESTONE BUFF <br />GONNEGTION <br />(SMOOTH EXPOSED AGGREGATE <br />BRYAN RED ROGK PANEL BETWEEN <br />5" GONGRETE SLAB <br />PREGAST INSULATED <br />FACoTORY GRIDS 5 $ 4, SEE EXTERIOR ELEVS <br />ON GONFORM DEGIG <br />WALL PANELS WITH <br />FOR EXTENT) <br />STANDARD RAKE INt <br />EXPOSED AGGREGATE. <br />TOP OF JOIST <br />�� <br />KRAEMER LIMESTONE BUFF <br />112'-6 " <br />- <br />O <br />iv <br />12" INSULATED <br />GONGRETE PANEL 12" INSULATED In <br />GONGRETE PANEL AGT <br />1 1/2" FURRING GHANNEL <br />WINDOW HEAD W/ 5/5" GYP. BOARD <br />107'-2" TO +10'-0" A.F.F. <br />OFFIGF FACoTORY <br />10< BOND BREAK <br />REINFORGED <br />GONGRETE SLAB <br />SEE STRUGTURAL <br />GRADE VARIES GRANULAR FILL GRADE VARIE <br />FINISH FLOOR IL FINISH FLOOR <br />100'-O" - a ° a a ao 100'-0" <br />SEE STRUGTURAL <br />FOR FOOTINGS <br />O^FmST ^ALL SECTION <br />5GALE: 1/2 — 1'-0" <br />SOLID SURFAGE SILL <br />BOND BREAK <br />REINFORGED <br />GONGRETE SLAB <br />SEE STRUG. <br />GOM PAGTED <br />GRANULAR FILL <br />VAPOR BARRIER <br />SEE STRUGTURAL <br />FOR FOOTINGS <br />NORTH YSALL SECTION(#) <br />5GALE: 1/2 — 1'-0" <br />12" INSULATED <br />GONGRETE PANEL <br />BOND BREAK <br />— <br />REINFORGED <br />GONGRETE SLAB <br />SEE STRUGTURAL <br />GOM PAGTED <br />GRANULAR FILL <br />SEE STRUGTURAL <br />FOR FOOTINGS <br />�Q u. <br />a °aa a <br />PREFINISHED <br />METAL GOPING <br />TREATED 2X <br />BLOGKING <br />T.O.P. <br />125'-0" <br />JOIST BEARING <br />121'-4" <br />PREFIN. DRIP <br />FLASHING $ <br />GOVT. SEALANT <br />WINDOW HEAD <br />118'-8" <br />45" X 45" <br />WINDOW UNIT <br />PREFIN. SILL <br />FLASHING $ <br />GOVT. SEALANT <br />PREGAST INSULATED WALL PANELS <br />WITH STANDARD RAKE EXPOSED <br />AGGREGATE KRAEMER LIMESTONE BUFF <br />—GRADE VARIES <br />FINISH FLOOR <br />100'-0" <br />O3 SOUTH YSALL SECTION <br />5GALE: 1/2 — 1'-0" <br />PROPOSED IMPROVEMENT FOR: <br />Western Spring <br />Manufacturing <br />Lot 2, Block 1 Bald Eagle <br />Industrial Park Sixth Addition <br />Washington County, Minnesota <br />PROPOSED BY: <br />SHAW <br />CONSTRUCTION <br />7685 CORPnRATE WAY <br />EDEN PRAIRIE MN <br />952 937 8214 <br />W W W.5HAWCONSTR U CT.COM <br />SHEET TITLE: <br />WALL SECTIONS <br />DATE: REVISION NO. <br />04-06-17 <br />DRAWN BY: <br />SHEET NO. <br />OF 4 SHEETS <br />Wer'! <br />SEE STRUGTURAL <br />FOR FOOTINGS <br />NORTH YSALL SECTION(#) <br />5GALE: 1/2 — 1'-0" <br />12" INSULATED <br />GONGRETE PANEL <br />BOND BREAK <br />— <br />REINFORGED <br />GONGRETE SLAB <br />SEE STRUGTURAL <br />GOM PAGTED <br />GRANULAR FILL <br />SEE STRUGTURAL <br />FOR FOOTINGS <br />�Q u. <br />a °aa a <br />PREFINISHED <br />METAL GOPING <br />TREATED 2X <br />BLOGKING <br />T.O.P. <br />125'-0" <br />JOIST BEARING <br />121'-4" <br />PREFIN. DRIP <br />FLASHING $ <br />GOVT. SEALANT <br />WINDOW HEAD <br />118'-8" <br />45" X 45" <br />WINDOW UNIT <br />PREFIN. SILL <br />FLASHING $ <br />GOVT. SEALANT <br />PREGAST INSULATED WALL PANELS <br />WITH STANDARD RAKE EXPOSED <br />AGGREGATE KRAEMER LIMESTONE BUFF <br />—GRADE VARIES <br />FINISH FLOOR <br />100'-0" <br />O3 SOUTH YSALL SECTION <br />5GALE: 1/2 — 1'-0" <br />PROPOSED IMPROVEMENT FOR: <br />Western Spring <br />Manufacturing <br />Lot 2, Block 1 Bald Eagle <br />Industrial Park Sixth Addition <br />Washington County, Minnesota <br />PROPOSED BY: <br />SHAW <br />CONSTRUCTION <br />7685 CORPnRATE WAY <br />EDEN PRAIRIE MN <br />952 937 8214 <br />W W W.5HAWCONSTR U CT.COM <br />SHEET TITLE: <br />WALL SECTIONS <br />DATE: REVISION NO. <br />04-06-17 <br />DRAWN BY: <br />SHEET NO. <br />OF 4 SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.