My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 08.07.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 08.07.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:45:52 AM
Creation date
12/10/2018 8:32:30 AM
Metadata
Fields
Template:
Commissions
Meeting Date
8/7/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />477 Temperance Street I St. Paul, MN 55101 1 (651) 286-8450 <br />July 31, 2017 <br />Mr. David Hempel <br />Construction Coordinator/Project Manager <br />Westwood Professional Services <br />7699 Anagram Drive <br />Minneapolis, MN 55344 <br />Re: Preliminary Plat and PUD Review <br />Fable Hill 41' Addition <br />WSB Project No. 1904-78 <br />Dear Mr. Hempel: <br />We have reviewed the preliminary PUD site plan submittal and drainage analysis for the above - <br />referenced project. In particular, we have reviewed the following plans related to this particular request: <br />• Plan Set (9 sheets) dated June 26, 2017, prepared by Westwood <br />• Preliminary Stormwater Runoff Narrative dated July 12, 2017, prepared by Westwood <br />Based on the review of the application materials, we offer the following comments related to this <br />application. <br />General <br />1. Final plat will require project specifications which include all current applicable City standard <br />details and reference the most recent edition of the City's general specification, MnDOT Standard <br />Specifications for Construction, and the City Engineer's Association of Minnesota Standard <br />Specifications. <br />2. Provide the utility, grading, and street profile plan updates as requested in the red -lined plans <br />attached to this memo. <br />Utility Plan <br />3. The watermain is shown as approaching the right of way line at several locations along Fable <br />Road North. Consider modifying the location of sanitary manholes to allow for the watermain to <br />be shifted more into the roadway at the following locations: <br />a. In front of Lot 15 Block 3 <br />b. In front of Lot 3 Block 3 <br />4. Provide a plan sheet (not as part of the construction set) that shows a 250' range from each <br />proposed hydrant location to demonstrate coverage. Provide additional hydrants throughout the <br />development where minimum fire protection requirements are not met. <br />5. There are a few conflicts where catch basins are conflicting with the watermain location. Confirm <br />that the structure depths do not conflict with the watermain or modify the watermain layout at the <br />following locations: <br />a. Between Lots 12 & 13 of Block 3 <br />b. Between Lots 2 & 3 of Block 3 <br />Building a legacy — your legacy. <br />Equal Opportunity Employer I wsbeng.com <br />KA01904-7801AdminTons LTR -d hampW-FableHiUth PP 07 91 17.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.