My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 12.21.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 12.21.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 12:01:20 PM
Creation date
12/10/2018 10:50:18 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/21/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Roadway Capacity and <br />Safety <br />Roadway capacity and roadway safety are two key indicators of how <br />well the roadway system is meeting the City's transportation needs. <br />The sections below provide information to better understand capacity <br />and safety issues within the City of Hugo. <br />Existing Roadway Capacity <br />A roadway's capacity indicates how many vehicles may use a roadway <br />before it experiences congestion. Capacity is largely dependent upon <br />the number of lanes. Table 8-4 below lists planning -level thresholds <br />that indicate a roadway's capacity. Additional variation (more or less <br />capacity) on an individual segment is influenced by a number of <br />factors including: amount of access, type of access, peak hour percent <br />of traffic, directional split of traffic, truck percent, opportunities to pass, <br />and amount of turning traffic, the availability of dedicated turn lanes, <br />parking availability, intersection spacing, signal timing and a variety of <br />other factors. <br />DRAFT Dec14-17 <br />for review only <br />Table 8-4 Plannin <br />Two-lane undivided 10,000 12,000 <br />Arterials Two-lane divided or three -lane undivided 15,000 <br />Four -lane undivided 18,000 <br />Four -lane divided or five -lane undivided 28,000 <br />Four -lane freeway 60,000 <br />Freeways Six -lane freeway <br />Eight -lane freeway or higher <br />17,000 <br />22,000 <br />32,000 <br />80,000 <br />90,000 120,000 <br />Calculated on a segment by segment basis <br />Source: FHWA Highway Capacity Manual and WSB Experience from Previous Projects <br />-!! ;GO 2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 TRANSPORTATION 173 <br />for review only <br />
The URL can be used to link to this page
Your browser does not support the video tag.