My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 12.21.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 12.21.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 12:01:20 PM
Creation date
12/10/2018 10:50:18 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/21/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Freight <br />Freight transportation in the City of Hugo is served predominantly by <br />the adjacent Principal Arterial highways, 1-35E west of the City and <br />TH 61 through the City. There is one active Class III railroad line in <br />the City of Hugo operated by Minnesota Commercial that runs parallel <br />to TH 61, ending at 140th Street North. In addition, there is an active <br />Canadian Pacific/Soo railroad line running south and east of the City in <br />the City of Grant and May Township. <br />There are no large freight traffic generators within the city as identified <br />by the Metropolitan Council. Freight generators within the city include <br />a concentration of industrial and commercial land uses adjacent to <br />Frenchman Road (CSAH 8) and TH 61.. The Metropolitan Council's <br />Regional Truck Highway Corridor Study (completed in 2017) identified <br />1-35E as a Tier 1 regional key truck corridor and TH 61 as a Tier 3 <br />regional key truck corridor. As defined in the Regional Truck Highway <br />Corridor Study, the interstate system serves as the freight backbone, <br />and other tiered roadways provide redundancy to the interstate <br />system, as well as provide door-to-door access to manufacturing <br />facilities, distribution centers, intermodal freight hubs, and ultimately, <br />retailers and customers. <br />O 2040 COMPREHENSIVE PLAN UPDATE <br />Figure 8-8 shows Heavy Commercial Average Annual Daily Traffic <br />(HCAADT) within Hugo on the Principal Arterial and "A" Minor Arterial <br />system. Within the City, the largest amount of heavy commercial <br />vehicles travels on Frenchman Road (CSAH 8) between 1-35E and <br />TH 61 (750 trucks per day) and on TH 61, between Frenchman Road <br />(CSAH 8) to 170th Street (CSAH 4) (550 trucks per day). <br />The 2040 TPP acknowledges several freight challenges that impact <br />the City and the region. Freight traffic and congestion are expected <br />to increase and place pressure on the region's highway and rail <br />systems. Additionally, there are concerns about compatibility between <br />freight traffic and adjacent land use. While the City's industrial <br />and commercial areas are located adjacent to the primary freight <br />corridors, it will be important to ensure that future development is also <br />compatible with freight operations. <br />DRAFT Dec14-17 <br />for review only <br />DRAFT Dec14-17 <br />for review only <br />TRANSPORTATION 195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.