My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 12.21.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 12.21.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 12:01:20 PM
Creation date
12/10/2018 10:50:18 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/21/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connects to Sub -district J4. The remainder of properties within Sub- <br />district J5 are undeveloped and not connected to sanitary sewer lines. <br />For district J, the capacity of the existing trunk sanitary sewer system <br />is sufficient. <br />District K <br />Sanitary Sewer District K consists of approximately 1,195 acres of <br />developable land divided into seven Sub -districts: K1, K2, K3, K4, K5, <br />K6, and K7. <br />Sanitary Sewer Sub -district K1 is located west of TH 61 along <br />Frenchman Road. The majority of the Sub -district is located north <br />of Frenchman Road and is developed both mixed use and medium <br />density residential. Sub -district K1 is primarily developed to the east, <br />and is serviced by 8 -inch to 18 -inch sanitary sewer directly connected <br />to the MCES interceptor at connection point K1. <br />Sub -districts K2, K3, K4, K5, K6, and K7 are located east of TH 61 <br />primarily along 147th Street and Oneka Lake Boulevard. Sub -districts <br />K2, K3, and K4 are fully developed mixed use, low density residential <br />and medium density residential. All three sub -districts are serviced <br />by 8 -inch to 15 -inch sanitary sewer that is directed to the 18 -inch <br />trunk sanitary sewer located in Sub -district K1. Sub -district K2 also <br />includes the City's Lift Station No. 1. All three of these Sub -districts <br />are not expected to develop further with the exception of minor re - <br />,r <br />HL 2040 COMPREHENSIVE PLAN UPDATE <br />development in the future. The capacity of the existing trunk sanitary <br />sewer system in K2 and K3 is sufficient to accommodate existing flows <br />and also minor redevelopment within zoning requirements; however, <br />the trunk sanitary sewer within K4 will need to be upgraded to 12 -inch <br />sewer main with the development of K6 which will be directed to the <br />K4 trunk sanitary sewer. <br />Sub -district K5 is located west of TH 61 and south of Oneka Lake <br />Boulevard. This Sub -district is primarily developed with existing low <br />density residential. Sub -district K5 is serviced by 8 -inch to 12 -inch <br />sanitary sewer and also includes the City's Lift Station No. 7. The <br />district is directly connected to the 15 -inch trunk sanitary sewer located <br />in Sub -district K2. <br />Sub -district K6 is located east of Sub -district K4 along Oneka Lake <br />Boulevard. K6 is currently undeveloped and may develop to low <br />density residential in the future. When this development occurs, an <br />extension of trunk sanitary sewer service from Sub -district K4 will be <br />required. <br />District L <br />Sanitary Sewer District L consists of approximately 90 acres of <br />developable land divided into three sub -districts: L1, L2, and L3 <br />All three sub -districts are located west of TH 61, north of Frenchman <br />If <br />:1112r.0Mc5YA <br />for review only <br />Road, and border the City's west boundary line. Sub -district L1 is fully <br />developed medium density residential and commercial and is serviced <br />by 8 -inch and 12 -inch sanitary sewer directly connected to the MCES <br />interceptor at connection point L1. Sub -district L1 is not expected to <br />develop further and the capacity of the existing 12 -inch trunk sanitary <br />sewer system is sufficient. <br />Sub -districts L2 and L3 are partially developed and zoned for <br />commercial and medium density residential. The developed regions <br />are serviced by 8 -inch sanitary sewer, with Sub -district L2 connecting <br />to Sub -district L1 and Sub -district L3 connecting to the MCES <br />interceptor sewer along Frenchman Rd. <br />District M <br />Sanitary Sewer District M consists of approximately 200 acres of <br />developable land divided into three Sub -districts: M1, M2, and M3. <br />Sanitary sewer Sub -district M1 is located west of TH 61 and north <br />of Frenchman Road along Oneka Parkway. The sub -district is fully <br />developed medium density residential and is serviced by 8 -inch, <br />10 -inch, and 15 -inch sanitary sewer directly connected to the MCES <br />interceptor at connection point M2. This sub -district is not expected to <br />develop further and the capacity of the existing trunk sanitary sewer <br />system is sufficient to accommodate existing flows. <br />COMPREHENSIVE SANITARY <br />SEWER PLAN <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.