My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 12.21.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 12.21.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 12:01:20 PM
Creation date
12/10/2018 10:50:18 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/21/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forest Lake Interceptor <br />The Forest Lake Interceptor (7029) is a combination forcemain and gravity sewer interceptor, which flows southward from Forest Lake, through <br />Hugo, White Bear Lake, North Oaks, and Vadnais Heights before entering MCES Interceptor 7132. <br />There are several lift stations along the length of the interceptor, two of which are in Hugo. MCES Lift Station No. 2 is located on the City of <br />Hugo's north border at 180th Street North. MCES Lift Station No. 3 is located adjacent to CSAH 8 at Oneka Parkway. The capacity of MCES Lift <br />Station No. 2 is 2,600 gpm or 3.74 MGD, and the capacity of MCES Lift Station No. 3 is 3,400 gpm or 4.90 MGD. <br />The interceptor enters the City of Hugo and MCES Lift Station No. 2 as a 36 -inch reinforced concrete pipe (RCP) gravity sewer. The interceptor <br />exits MCES Lift Station No. 2 with approximately 3,500 feet of 18 -inch ductile iron pipe (DIP) forcemain before transitioning back to 36 -inch RCP <br />gravity sewer. The 36 -inch RCP increases in size to a 42 -inch RCP gravity sewer near 170th Street North and remains 42 inches in diameter <br />through the City of Hugo except for approximately 2,350 feet of 24 -inch DIP forcemain between MCES Lift Station No. 3 and the 42 -inch <br />interceptor on 142nd Street North. <br />MCES has identified an extensive Capital Improvement Plan (CIP) related to the Forest Lake Interceptor in response to growth within the region. <br />There are improvements programmed for the facilities between Hugo and the MCES WWTP over the next ten years. There are currently projects <br />that are under construction or in the planning stages consistent with the CIP. <br />Interceptor 76-51 (The Centerville Interceptor) intersects with and flows into the Forest Lake Interceptor near MCES Lift Station No. 3 in Hugo. <br />This interceptor collects flows from the Cities of Hugo, Lino Lakes, and Centerville. <br />1-1UG0 2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec 14-17 COMPREHENSIVE SANITARY A <br />SEWER PLAN <br />for review only <br />
The URL can be used to link to this page
Your browser does not support the video tag.