Laserfiche WebLink
SECTION VI <br />c <br />o <br />c <br />06 <br />Proposed Cost By Year'°2 <br />E E <br />CD m <br />E <br />�' <br />E <br />0y <br />� .� <br />vi <br />E <br />� � � <br />10 Year <br />Possible <br />s <br />asi <br />a <br />o o <br />Cost <br />Funding <br />No. <br />Project Description <br />2 M <br />a W <br />a a in <br />Estimate' <br />Sources s <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />Comments <br />City Stormwater Management Permits - The City will <br />See SWPPP Application for <br />continue to review land disturbance activities and issue <br />General Fund, <br />Reauthorization (Appendix B) <br />14 <br />permits. The City will collaborate with the appropriate <br />✓ <br />$100,000 <br />Stormwater <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />Completed through typical LGU activities <br />watershed districts on land disturbance projects through <br />Trunk Fee, City <br />the end of the MS4 permit cycle. <br />Levies <br />Post Construction Stormwater Mitigation Provisions - <br />General Fund, <br />See SWPPP Application for <br />The City will adopt post construction stormwater <br />Stormwater <br />Reauthorization (Appendix B) <br />15 <br />mitigation requirements to comply with the MS4 permit <br />gg <br />✓ <br />✓ <br />✓ <br />$1,000 <br />Trunk Fee, City <br />$500 <br />$500 <br />Completed b City Staff and CityEngineer <br />p y y g <br />requirements as updated every years when MS4 <br />Levies <br />permit coverage is extended to the City. <br />Street Sweeping - The City will continue to conduct <br />See SWPPP Application for <br />street sweeping operations of all public streets twice <br />Reauthorization (Appendix B) <br />annually (record the sweeping route, volume of material <br />General Fund, <br />Completed by Public Works Staff <br />16 <br />removed, and date per occurrence). Review and revise <br />✓ <br />$450,000 <br />Stormwater <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />$45,000 <br />(as needed) street sweeping operations (including <br />Trunk Fee, City <br />schedule, equipment, and disposal), stormwater quality <br />Levies <br />priority areas, and routes annually through the end of the <br />MS4 permit cycle. <br />Structural Stormwater BMP Inspections - Continue to <br />General Fund, <br />See SWPPP Application for <br />inspect 100% of all structural stormwater BMPs each <br />✓ <br />✓ <br />Stormwater <br />Reauthorization (Appendix B) <br />17 <br />year of the MS4 permit cycle. <br />`� <br />$25,000 <br />Trunk Fee, City <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />$2,500 <br />Completed by City Sr. Engineer <br />Levies <br />Technician <br />Inspect MS4 Outfalls and Ponds - Continue to annually <br />General Fund, <br />See SWPPP Application for <br />18 <br />inspect all MS4 Outfalls and inspect all Ponds on a 5 <br />✓ <br />$40,000 <br />Stormwater <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />$4,000 <br />Reauthorization (Appendix B) <br />year cycle through the MS4 permit cycle (20% each <br />Trunk Fee, City <br />Completed by Senior Engineering <br />year). <br />Levies <br />Technician, and Public Works Staff. <br />Review Inspection Reports - Annually, review all pond, <br />See SWPPP Application for <br />outfall, and SPCD inspection records to determine if <br />Reauthorization (Appendix B) <br />maintenance, repair, or replacement is needed. Include <br />Completed by Senior Engineering <br />a description of the findings and any maintenance, <br />General Fund, <br />Technician, and City Engineer <br />19 <br />repair, or replacement as a result of the inspection <br />`� <br />`� <br />`� <br />$10,000 <br />Stormwater <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />findings. Evaluate each SPCD's inspection frequency <br />Trunk Fee, City <br />and adjust as needed per MS4 Permit Part III.D.6.e(1.). <br />Levies <br />Evaluate and update inspection records annually <br />through the end of the MS4 permit cycle (July 31, 2018) <br />Employee Training - Host a minimum of one training <br />See SWPPP Application for <br />session per year to address the importance of water <br />Reauthorization (Appendix B) <br />quality, cover the requirements of the permit relevant to <br />Completed by Public Works Staff <br />the duties of each employee. The City will develop a <br />schedule that establishes initial training for new and/or <br />General Fund, <br />20 <br />seasonal employees and recurring training intervals for <br />�/ <br />�/ <br />V/ <br />$10,000 <br />Stormwater <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />existing employees to address changes in procedures, <br />Trunk Fee, City <br />practices, techniques, or requirements. The City will <br />Levies <br />implement this within 12 months from the date each time <br />the permit coverage is extended. <br />City of Hugo TABLE 6.1 <br />WSB Project No. 1904-520 <br />