Laserfiche WebLink
SECTION VI <br />c <br />o <br />c <br />06 <br />Proposed Cost By Year'°2 <br />E <br />E <br />CD (Dr <br />04 i <br />� <br />N <br />c � � <br />10 Year <br />Possible <br />a <br />asi <br />a <br />o o <br />Cost <br />Funding <br />No. <br />Project Description <br />2 M <br />Q x <br />a a cnn <br />Estimate' <br />Sources s <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />Comments <br />Rice Lake Soccer Fields Water Re -Use System- This <br />See CIP for Stormwater Projects <br />project consists of irrigating and infiltrating the <br />General Fund, <br />(Appendix D) <br />soccer fields and/or City of Hugo Public Works Garage <br />Stormwater <br />39 <br />property with stormwater runoff taken from <br />✓ <br />$170,500 <br />$160,000 <br />$3,500 <br />$3,500 <br />$3,500 <br />stormwater ponds installed as part of the construction of <br />Trunk Fee, City <br />the City of Hugo's Public Works garage. <br />Levies, RCWD <br />Infiltrate/Irrigate Lions Park - This project consists of <br />General Fund, <br />See CIP for Stormwater Projects <br />water from Water's Edge Ponds and using <br />pumping g g <br />Stormwater <br />D Applies to Peltier Lake <br />(Appendix )� pp <br />40 <br />Lions Park for both irrigation and irrigation. <br />✓ <br />$164,000 <br />$40,000 <br />$102,000 <br />$5,500 <br />$5,500 <br />$5,500 <br />$5,500 <br />TMDL. <br />Trunk Fee, City <br />Levies, RCWD <br />Water's Edge Phase 2 - This project consists of pumping <br />General Fund, <br />See CIP for Stormwater Projects <br />water from selected stormwater ponds within the Water's <br />Stormwater <br />(Appendix D). Applies to Peltier Lake <br />41 <br />Edge development and using this stormwater for <br />V/ <br />$100,000 <br />Trunk Fee, City <br />$100,000 <br />TMDL. <br />irrigation purposes in place of city water that is currently <br />Levies, RCWD <br />used for this purpose. <br />County Road 8 - The project will reconnect the existing <br />irrigation system along County Road 8 (Frenchman <br />General Fund, <br />42 <br />Road) to stormwater, resulting in improved surface water <br />v/ <br />$377,000 <br />Stormwater <br />$377,000 <br />quality due to the removal of nutrients from the <br />Trunk Fee, City <br />stormwater system and decreased groundwater demand. <br />Levies, RCWD <br />Creekside Villas - Connect the water reuse system <br />General Fund, <br />between Clearwater Cove and Creekside Villas. Study to <br />Stormwater <br />43 <br />be completed in 2019 with construction in 2020. <br />✓ <br />$115,000 <br />Trunk Fee, City <br />$15,000 <br />$100,000 <br />Levies, RCWD <br />Water Reuse Retrofit - Complete three studies looking at <br />General Fund, <br />retrofitting opportunities for existing development. The <br />Stormwater <br />44 <br />City would consider partnering with RCWD on <br />✓ <br />$60,000 <br />$20,000 <br />$20,000 <br />$20,000 <br />implementing identified water reuse projects. <br />Trunk Fee, City <br />Levies, RCWD <br />Animal Waste Ordinance - The City will regularly update <br />General Fund, <br />Upper Mississippi River TMDL for E.coli <br />45 <br />and enforce their animal ordinance to properly dispose <br />V/ <br />V/ <br />$8,000 <br />Stormwater <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />$800 <br />pet waste to limit E.coli discharge to the Mississippi <br />Trunk Fee, City <br />River and other waterbodies. <br />Levies <br />Natural Buffers - The City will collaborate with RCWD to <br />General Fund, <br />Upper Mississippi River TMDL for E.coli <br />install buffers or other applicable BMP near waterbodies <br />Stormwater <br />46 <br />to limit E.coli discharge. <br />✓ <br />$6,000 <br />$2,000 <br />$2,000 <br />$2,000 <br />Trunk Fee, City <br />Levies, RCWD <br />Plaisted Lake & North and South School Section Lakes <br />General Fund, <br />See Northern Chain of Lakes WRAPS for <br />BMP - Sediment basin to be located on the NW side of <br />47 <br />$24,553 <br />Stormwater <br />$24,553 <br />additional information <br />the wetland complex located upstream of North School <br />Trunk Fee, <br />Section. <br />BCWD <br />Plaisted Lake & North and South School Section Lakes <br />General Fund, <br />See Northern Chain of Lakes WRAPS for <br />BMP - Sediment basin to be located on the west side of <br />Stormwater <br />additional information <br />48 <br />the wetland complex located upstream of North School <br />✓ <br />$2,818 <br />Trunk Fee, City <br />$2,818 <br />Section. <br />Levies, BCWD <br />City of Hugo TABLE 6.1 <br />WSB Project No. 1904-520 <br />