Laserfiche WebLink
Construction site stormwater runoff control <br />A. Do you have a regulatory mechanism(s) that establishes requirements for erosion and sediment controls and waste <br />controls? ® Yes ❑ No <br />1. If yes: <br />a. Check which type of regulatory mechanism(s) your organization has (check all that apply): <br />® Ordinance ® Contract language <br />❑ Policy/Standards ❑ Permits <br />❑ Rules <br />® Other, explain: developer agreements <br />b. Provide either a direct link to the mechanism selected above or attach it as an electronic document to this <br />form; or if your regulatory mechanism is either an Ordinance or a Rule, you may provide a citation: <br />Citation: <br />Direct link: http: / /www.ci. huoo. mn. us/vertical/sites/%7BBED5C6A0-2687- <br />460E-9C61-6B7CCADA2CBA%7D/uploads/Hugo_CSWMP.pdf <br />® Check here if attaching an electronic copy of your regulatory mechanism, with the following file naming <br />convention MS4 City of Hugo CSWreg. <br />B. Is your regulatory mechanism at least as stringent as the MPCA general permit to Discharge Stormwater Associated <br />with Construction Activity (as of the effective date of the MS4 Permit)? ®Yes ❑ No <br />If you answered yes to the above question, proceed to C. <br />If you answered no to either of the above permit requirements listed in A. or B., describe the tasks and corresponding <br />schedules that will be taken to assure that, within 12 months of the date permit coverage is extended, these permit <br />requirements are met: <br />C. Answer yes or no to indicate whether your regulatory mechanism(s) requires owners and operators of construction <br />activity to develop site plans that incorporate the following erosion and sediment controls and waste <br />controls as <br />described in the Permit (Part III.D.4.a.(1)-(8)), and as listed below: <br />1. Best Management Practices (BMPs) to minimize erosion. <br />® Yes <br />❑ No <br />2. BMPs to minimize the discharge of sediment and other pollutants. <br />® Yes <br />❑ No <br />3. BMPs for dewatering activities. <br />® Yes <br />❑ No <br />4. Site inspections and records of rainfall events <br />® Yes <br />❑ No <br />5. BMP maintenance <br />® Yes <br />❑ No <br />6. Management of solid and hazardous wastes on each project site. <br />® Yes <br />❑ No <br />7. Final stabilization upon the completion of construction activity, including the use of perennial <br />® Yes <br />❑ No <br />vegetative cover on all exposed soils or other equivalent means. <br />8. Criteria for the use of temporary sediment basins. <br />® Yes <br />❑ No <br />If you answered no to any of the above permit requirements, describe the tasks and corresponding <br />schedules that will <br />be taken to assure that, within 12 months of the date permit coverage is extended, these permit requirements are met: <br />Post -construction stormwater management <br />A. Do you have a regulatory mechanism(s) to address post -construction stormwater management activities? <br />® Yes ❑ No <br />1. If yes: <br />a. Check which type of regulatory mechanism(s) your organization has (check all that apply): <br />® Ordinance ❑ Contract language <br />❑ Policy/Standards ❑ Permits <br />❑ Rules <br />www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5131113 Page 4 of 14 <br />