Laserfiche WebLink
Project Number: 2 <br />Project Priority: High <br />Abbreviated Description of Project/BMP: <br />Beaver Ponds Park Irrigation Project <br />Full Description of Project: <br />This project consists of pumping water from the storm <br />water ponds constructed as part of the Beaver Ponds <br />Development and infiltrating this water under soccer <br />fields in Beaver Ponds Park. <br />Design Parameters: <br />• Install 1500 LF of infiltration trench <br />• Install lift station pumps and controls <br />Project Location: <br />Section 32, Township 31N, Range 21W (south of 130th <br />street and east of Forest Blvd.) <br />Estimated Benefits: <br />• Volume reduction up to 130 acre-feet annually <br />• TP reduction up to 130 pounds reduction <br />Estimated Capital Cost: <br />$130,000 <br />Estimated Annual Cost: <br />$4,250 <br />Estimated Cost per Pound of Phosphorus <br />$100/per pound <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />$100/per acre-feet <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />