My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.02.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:34:15 PM
Creation date
2/4/2019 6:30:16 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/4/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Number: 4 <br />Project Priority: High <br />Abbreviated Description of Project/BMP: <br />Infiltrate/Irrigate Lions Park <br />Full Description of Project: <br />This project consists of pumping water from Water's <br />Edge Ponds and using Lions Park for both irrigation and <br />irrigation. <br />Design Parameters: <br />• Install 1,200 LF of infiltration trench <br />• Install lift station pumps and controls <br />• Install irrigation system over 2 acre area <br />Project Location: <br />Section 32, Township 31N, Range 21W (West of TH 61 <br />and immediately north and south of 147th Street) <br />Estimated Benefits: <br />• Volume reduction up to 112 acre-feet annually <br />• TP reduction up to 112 pounds reduction <br />Estimated Capital Cost: <br />$105,000 — Infiltration System <br />$37,000 — Irrigation System <br />$142,000—Total Project Cost <br />Estimated Annual Cost: <br />$5,500 for opperation <br />Estimated Cost per Pound of Phosphorus <br />$130/per pound <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />$130/per acre foot <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.