Laserfiche WebLink
Project Number: 5 <br />Project Priority: Low (until redevelopment projects on <br />northwest side of Egg Lake become active) <br />Abbreviated Description of Project/BMP: <br />Egg Lake Perimeter Stormwater Re -use System <br />Full Description of Project: <br />This project consists of pumping stormwater runoff <br />from a perimeter pond constructed around Egg Lake <br />and utilizing the stormwater for irrigation purposes in <br />selected areas. <br />Design Parameters: <br />Water Reuse/Irrigation <br />Project Location: <br />Section 20, Township 31N, Range 21W (areas on the <br />north and west sides of Egg Lake) <br />Estimated Benefits: <br />To be determined when listed as high priority. <br />Estimated Capital Cost: <br />To be determined when listed as high priority. <br />Estimated Annual Cost: <br />To be determined when listed as high priority. <br />Estimated Cost per Pound of Phosphorus <br />To be determined when listed as high priority. <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />To be determined when listed as high priority. <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />