Laserfiche WebLink
Project Number: 8 <br />Project Priority: High <br />Abbreviated Description of Project/BMP: <br />Construct irrigation or construct infiltration system in <br />Clearwater Creek Park <br />Full Description of Project: <br />This project consists of pumping water from Clearwater <br />Creek and using it to irrigate an 80-acre park property <br />located west of Fenway Blvd. and south of 140th Street. <br />This project could be implemented in conjunction with <br />the irrigation project proposed for Harley Sod Fields <br />(which is located immediately north of this parcel). <br />Design Parameters: <br />• Install 1,150 LF of infiltration trench <br />• Install lift station pumps and controls <br />• Future opportunity exists for system expansion <br />in this area <br />Project Location: <br />Section 30, Township 31N, Range 21W (west of Fenway <br />Blvd, south of 140th Street) <br />Estimated Benefits: <br />• Volume reduction up to 100 acre-feet annually <br />• TP reduction up to 100 pounds reduction <br />Estimated Capital Cost: <br />$100,000 <br />Estimated Annual Cost: <br />$3,500 <br />Estimated Cost per Pound of Phosphorus <br />$100/per pound <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />$100/per acre foot <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />