Laserfiche WebLink
Project Number: 9 <br />Project Priority: Medium —to be further evaluated <br />when Future Fable Hills Park improvements developed <br />Abbreviated Description of Project/BMP: <br />Future Fable Hills Park <br />Full Description of Project: <br />This project consists of pumping water a stormwater <br />pond within the Fable Hills Development and using the <br />stormwater to irrigate a planned Fable Hills Park <br />located within the subdivision. <br />Design Parameters: <br />Water Reuse/Irrigation <br />Project Location: <br />Section 30, Township 31N, Range 21W <br />Estimated Benefits: <br />To be determined when listed as high priority. <br />Estimated Capital Cost: <br />To be determined when listed as high priority. <br />Estimated Annual Cost: <br />To be determined when listed as high priority. <br />Estimated Cost per Pound of Phosphorus <br />Removed: <br />To be determined when listed as high priority. <br />Estimated Cost per Acre-ft. of Volume <br />Removed: <br />To be determined when listed as high priority. <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />