Laserfiche WebLink
Project Number: 10 <br />Project Priority: High — City is actively pursuing <br />installation of irrigation system in park <br />Abbreviated Description of Project/BMP: <br />Arbre Park Irrigation Project <br />Full Description of Project: <br />This project consists of pumping water from a pond <br />adjacent to Arbe Park and using this stormwater for <br />irrigation purposes. It is noted that this park is already <br />being irrigated using city water. <br />Design Parameters: <br />• Irrigate .5 acre park area <br />Project Location: <br />Section 19, Township 31N, Range 21W <br />Estimated Benefits: <br />• Volume reduction up to 3 acre-feet annually <br />• TP reduction up to 3 pounds reduction <br />Estimated Capital Cost: <br />$20,000 (higher per acre cost due to small scale) <br />Estimated Annual Cost: <br />$1,000 <br />Estimated Cost per Pound of Phosphorus <br />$400/per pound <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />$400/per acre foot <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />