Laserfiche WebLink
Project Number: 15 <br />Project Priority: High <br />Abbreviated Description of Project/BMP: <br />Diamond Point Park Water Re -use System <br />Full Description of Project: <br />This project consists of constructing a water re -use <br />system to irrigate and infiltrate water in Diamond Point <br />Park. <br />Design Parameters: <br />• Irrigate .6 acres of park land <br />• Install 500 LF of infiltration trench <br />• Install lift station pumps and controls <br />Project Location: <br />Section 21, Township 31N, Range 21W (South of 145th <br />Street and East of Goodview Avenue) <br />Estimated Benefits: <br />• Volume reduction up to 50 acre-feet annually <br />• TP reduction up to 50 pounds reduction <br />Estimated Capital Cost: <br />$75,000 <br />Estimated Annual Cost: <br />$2,000 <br />Estimated Cost per Pound of Phosphorus <br />$130/per pound <br />Removed: <br />Estimated Cost per Acre-ft. of Volume <br />$130/per acre foot <br />Removed: <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />