Laserfiche WebLink
Project Number: 17 <br />Project Priority: Medium —this large scale project will <br />need to be further evaluated to better define the <br />project feasability <br />Abbreviated Description of Project/BMP: <br />Hugo Gravel Pit Infiltration System <br />Full Description of Project: <br />This project consists of pumping stormwater runoff <br />from areas adjacent to the gravel pit. <br />Design Parameters: <br />Water Reuse/Irrigation <br />Project Location: <br />Section 28, Township 31N, Range 21W <br />Estimated Benefits: <br />To be determined when listed as high priority. <br />Estimated Capital Cost: <br />To be determined when listed as high priority. <br />Estimated Annual Cost: <br />To be determined when listed as high priority. <br />Estimated Cost per Pound of Phosphorus <br />Removed: <br />To be determined when listed as high priority. <br />Estimated Cost per Acre-ft. of Volume <br />Removed: <br />To be determined when listed as high priority. <br />k:\01687-85\admin\doc5\Potential projects 050911.docx <br />