Laserfiche WebLink
Effective April 28, 2015 Chapter Four Subsurface Sewage Treatment System Regulations <br />SECTION 5 ACCEPTABLE AND PROHIBITED DISCHARGES.........................................................................26 <br />5.1 <br />Sewage...........................................................................................................................................26 <br />5.2 <br />System influent..............................................................................................................................26 <br />5.3 <br />Domestic waste..............................................................................................................................26 <br />SECTION6 PERMITS.............................................................................................................................................. <br />27 <br />6.1 <br />Building Permit requirements........................................................................................................27 <br />6.2 <br />Compliant system or permit issued................................................................................................27 <br />6.3 <br />Permit required..............................................................................................................................27 <br />6.4 <br />Permit application..........................................................................................................................27 <br />6.5 <br />Site plan required...........................................................................................................................27 <br />6.6 <br />Permit time limit............................................................................................................................27 <br />6.7 <br />Permit revocation...........................................................................................................................28 <br />SECTION 7 OPERATING PERMITS...................................................................................................................... <br />29 <br />7.1 <br />Operating permit required..............................................................................................................29 <br />7.2 <br />Operating permits issued...............................................................................................................29 <br />7.3 <br />Operating permit criteria................................................................................................................29 <br />7.4 <br />Operating Permits..........................................................................................................................29 <br />7.5 <br />MSTS Maintenance.......................................................................................................................29 <br />7.6 <br />Grease Interceptors........................................................................................................................29 <br />7.7 <br />Operation and Maintenance Manual..............................................................................................29 <br />7.8 <br />Groundwater Monitoring...............................................................................................................29 <br />7.9 <br />Noncompliance..............................................................................................................................29 <br />SECTION8 INSPECTIONS..................................................................................................................................... <br />30 <br />8.1 <br />Required inspections......................................................................................................................30 <br />8.2 <br />Time of inspections........................................................................................................................30 <br />8.3 <br />Inspection scheduling....................................................................................................................30 <br />8.4 <br />Work backfilled before inspection.................................................................................................30 <br />8.5 <br />Correction orders...........................................................................................................................30 <br />8.6 <br />System placed into service.............................................................................................................30 <br />8.7 <br />Department access.........................................................................................................................30 <br />8.8 <br />As-builts.........................................................................................................................................30 <br />8.9 <br />Disclosure......................................................................................................................................30 <br />8.10 <br />Compliance inspection; new construction or replacement........................................................30 <br />8.11 <br />Certificate of compliance; notice of noncompliance.................................................................31 <br />8.12 <br />Compliance inspections; existing systems.................................................................................32 <br />8.13 <br />Periodically saturated soil disagreements..................................................................................33 <br />SECTION 9 SITE EVALUATION AND SOIL TESTING...................................................................................... <br />34 <br />3 Washington County Development Code <br />