Laserfiche WebLink
Effective April 28, 2015 Chapter Four Subsurface Sewage Treatment System Regulations <br />12.2 <br />Design Flow...............................................................................................................................43 <br />12.3 <br />Design Flow by Bedrooms.........................................................................................................43 <br />12.4 <br />Sum of design flow for existing dwellings................................................................................43 <br />12.5 <br />New housing developments.......................................................................................................43 <br />12.6 <br />Additional Capacity...................................................................................................................43 <br />12.7 <br />Design Flow Determination for Other Establishments..............................................................43 <br />12.8 <br />Employees in Design Flow Calculation.....................................................................................46 <br />12.9 <br />Measured Flow...........................................................................................................................46 <br />12.10 <br />Infiltration.................................................................................................................................. <br />47 <br />12.11 <br />Waste Concentration..................................................................................................................47 <br />SECTION13 <br />SEWAGE TANKS..............................................................................................................................48 <br />13.1 <br />Sewage Tanks, General..............................................................................................................48 <br />13.2 <br />Tank Strength Requirements......................................................................................................48 <br />13.3 <br />Poured -in -place concrete Tanks.................................................................................................48 <br />13.4 <br />Septic Tank Design....................................................................................................................48 <br />13.5 <br />Minimum Tank Capacity...........................................................................................................48 <br />13.6 <br />Common tanks...........................................................................................................................49 <br />13.7 <br />Septic tank capacity for multiple dwellings...............................................................................49 <br />13.8 <br />Septic tank capacity for other establishments............................................................................49 <br />13.9 <br />Holding Tank Capacity for Other Establishments.....................................................................49 <br />13.10 <br />Effluent Filters Required............................................................................................................49 <br />13.11 <br />Tanks connected in series..........................................................................................................49 <br />13.12 <br />Prior to other treatment devices.................................................................................................49 <br />13.13 <br />Compartmentalization of Single Tanks......................................................................................50 <br />13.14 <br />Septic Tank Baffles....................................................................................................................50 <br />13.15 <br />Sewage Tank Access..................................................................................................................50 <br />13.16 <br />Pump Tank Access..................................................................................................................... <br />51 <br />13.17 <br />Maintenance Hole Risers to Grade............................................................................................51 <br />13.18 <br />Maintenance Hole Covers..........................................................................................................51 <br />13.19 <br />Concrete Tank Construction......................................................................................................51 <br />13.20 <br />Non -Concrete Tank Construction..............................................................................................51 <br />13.21 <br />Precast Reinforced Concrete Tanks...........................................................................................51 <br />13.22 <br />Other Tanks................................................................................................................................51 <br />13.23 <br />Location and installation of tanks:.............................................................................................51 <br />13.24 <br />Tank Assessment........................................................................................................................52 <br />13.25 <br />Tank Identification.....................................................................................................................53 <br />5 Washington County Development Code <br />