My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.02.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:34:15 PM
Creation date
2/4/2019 6:30:16 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/4/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Effective April 28, 2015 Chapter Four Subsurface Sewage Treatment System Regulations <br />Sieve Size <br />Percent <br />Passing <br />No.4 <br />95-100 <br />No.8 <br />80-100 <br />No.10 <br />0-100 <br />No.40 <br />0-100 <br />No.60 <br />0-40 <br />No.200 <br />0-5 <br />Clean sand must also contain less than three percent deleterious substances and be free of <br />organic impurities. <br />(D) The original soil mound absorption area is determined by multiplying the original soil <br />mound absorption length by the original soil mound absorption width. The original soil <br />absorption width is calculated by multiplying the mound distribution media bed width by the <br />mound absorption ratio. The mound absorption ratio of the upper 18 inches of soil for new <br />construction, or 12 inches of soil for previously developed sites, in the proposed original soil <br />mound absorption area shall be determined according to Table VI or Table VIa. <br />(E) The required original soil absorption width for mounds constructed on slopes from zero to <br />one percent must be centered under the mound distribution media bed width. The required <br />original mound soil absorption width constructed on slopes greater than one percent must be <br />measured downslope from the upslope edge of the mound distribution media bed width and <br />measured in the direction of the original land slope and perpendicular to the original <br />contours. <br />(F) The side slopes on the mound must not be steeper than three horizontal units to one vertical <br />unit and shall extend beyond the required absorption area, if necessary. <br />(G) Distribution of effluent over the mound distribution media bed must be by level perforated <br />pipe under pressure according to Section 14 and Section 15. <br />(H) The supply pipe from the pump to the original soil absorption area must be installed before <br />surface preparation of the original mound soil absorption area. The trench excavated for the <br />supply pipe must be carefully backfilled and compacted to prevent seepage of effluent. <br />(1) Vegetation in excess of two inches in length and dead organic debris including leaf mats <br />must be removed from the original soil mound absorption area. Trees must be cut nearly <br />flush with the ground and stumps must not be removed. <br />(J) The original soil mound absorption area must be roughened by backhoe teeth, moldboard, or <br />chisel plow. The soil must be roughened to a depth of eight inches. Discing is allowed if <br />the upper eight inches of soil has a texture of sandy loam or coarser. If plowed, fixrrows <br />must be thrown uphill and there must not be a dead furrow in the original soil mound <br />absorption area. A rubber tired tractor is allowed for plowing or discing. Rototilling or <br />pulverizing the soil is not allowed. The original soil must not be excavated or moved more <br />than one foot from its original location during soil surface preparation. <br />(K) All surface preparation must take place when the upper 12 inches of soil has a moisture <br />content of less than the plastic limit and soil conditions allow field testing of soil properties <br />and these properties are maintained throughout the installation. <br />(L) Prior to placement of six inches of clean sand, vehicles must not be driven on the original <br />soil mound absorption area before or after the surface preparation is completed. The clean <br />sand must immediately be placed on the prepared surface. <br />(M) If rainfall occurs on the prepared surface, the site must be allowed to dry below the plastic <br />limit and roughened as described in Section 17.3 (3)(J). <br />(N) The clean sand must be placed by using a construction technique that minimizes <br />compaction. If the clean sand is driven on for construction, a crawler or track -type tractor <br />69 Washington County Development Code <br />
The URL can be used to link to this page
Your browser does not support the video tag.