My WebLink
|
Help
|
About
|
Sign Out
Home
2019.04.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.04.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:06:27 PM
Creation date
4/12/2019 8:54:36 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/15/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacement <br />The applicant is proposing to replace for permanent wetland impacts using excess credits from the <br />Rosemary Mitigation Site. Wetland areas D and F will result in a total impact of 2,185 square feet, <br />requiring replacement at a 2:1 ratio (4,370 square feet). There are currently 18,479 square feet of <br />replacement wetland credits available in the Rosemary Wetland Mitigation Site. <br />Based on the information provided in the attached MN Joint application titled "Wetland Replacement <br />Plan, Norman Woods, Rosemary Way, Hugo, MN 55038" and dated March 2019; along with <br />supporting documents, the application for no -loss, sequencing flexibility, and replacement is <br />approved with the following conditions: <br />Conditions <br />1.) The boundaries of the 2012 wetland delineation are clearly marked. <br />2.) The boundaries of the perpetual conservation easement that protects the Rosemary <br />Mitigation Site are clearly marked. <br />3.) Impacts to areas D and F are complete by September 2019 when all excess credits from the <br />Rosemary Mitigation Site will expire. <br />For Replacement Plans using credits from the State Wetland Bank: <br />Bank Account # <br />Bank Service Area <br />County <br />Credits Approved for Withdrawal <br />(sq. ft. or nearest .01 acre) <br />Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the approval <br />of a Wetland Replacement Plan is conditional upon the following: <br />❑ Financial Assurance: For project -specific replacement that is not in -advance, a financial assurance <br />specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9 <br />(List amount and type in LGU Findings). <br />❑ Deed Recording: For project -specific replacement, evidence must be provided to the LGU that the <br />BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms have <br />been filed with the county recorder's office in which the replacement wetland is located. <br />❑ Credit Withdrawal: For replacement consisting ofwetland bank credits, confirmation that BWSR has <br />withdrawn the credits from the state wetland bank as specified in the approved replacement plan. <br />Wetlands may not be impacted until all applicable conditions have been met! <br />LUU Authorized Signature: <br />Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255, <br />Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as <br />specified above. If additional details on the decision exist, they have been provided to the landowner and <br />are available from the LGU upon request. <br />Name: Title: <br />Tony Havranek Senior Ecologist (WSB & Associates, Inc.), on behalf of the <br />City of Hugo <br />BWSR Forms 11-25-09 Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.