ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT <br />PROJECT NAME: NORMAN WOODS <br />PROJECT LOCATION (BRIEFLY DESCRIBE WHERE CONSTRUCTION ACTIVITY OCCURS. INCLUDE ADDRESS IF AVAILABLE.) <br />ADDRESS: 4571 ROSEMARY WAY <br />CITY OR TOWNSHIP: HUGO <br />STATE: MN <br />ZIP CODE: 55038 <br />LATITUDE/LOGITUDE OF APPROXIMATE CENTROID OF PROJECT: 45°09'44" N, 93°00'49" E <br />METHOD OF LAT/LONG COLLECTION (CIRCLE ONE): GPS ONLINE TOOL SGS TOPOGRAPHIC <br />ALL CITIES WHERE CONSTRUCTION WILL OCCUR: HUGO <br />ALL COUNTIES WHERE CONSTRUCTION WILL OCCUR: WASHINGTON <br />ALL TOWNSHIPS WHERE CONSTRUCTION WILL OCCUR: N/A <br />PROJECT SIZE (NUMBER OF ACRES TO BE DISTURBED): 3.07 <br />PROJECT TYPE (CIRCLE ONE): RESIDENTIAL COMMERCIAL/INDUSTRIAL ROAD CONSTRUCTION <br />RESIDENTIAL & RD CONSTRUCTION OTHER (DESCRIBE): XXXXX <br />CUMULATIVE IMPERVIOUS SURFACE (TO THE NEAREST TENTH ACRE) <br />EXISTING AREA OF IMPERVIOUS SURFACE: 0.00 <br />POST CONSTRUCTION AREA OF IMPERVIOUS SURFACE: 1.10 <br />TOTAL NEW AREA OF IMPERVIOUS SURFACE: 1.10 <br />RECEIVING WATERS <br />WATER BODY ID <br />NAME OF WATER BODY <br />WATER BODY TYPE <br />SPECIAL WATER? (Y/N) <br />IMPARIED WATER (Y/N) <br />07010206-519 <br />CLEARWATER CREEK <br />CREEK <br />N <br />Y <br />DATES OF CONSTRUCTION <br />CONSTRUCTION START DATE: 06/19 <br />ESTIMATED COMPLETION DATE: 06/21 <br />GENERAL CONSTRUCTION PROJECT INFORMATION <br />DESCRIBE THE CONSTRUCTION ACTIVITY (WHAT WILL BE BUILT, GENERAL TIMELINE, ETC): CONSTRUCT NEW APARTMENT, WITH PARKING, UTILITIES, AND <br />LANDSCAPING IMPROVEMENTS <br />DESCRIBE SOIL TYPES FOUND AT THE PROJECT: THE DOMINANT SOILS AT DEPTHS WERE MORE UNIFORM GLACIAL TILL DEPOSITS CONSISTING PRIMARILY OF <br />CLAYEY SANDS TO SANDY LEAN CLAYS. THESE MATERIALS WERE COMMONLY BROWN TO DEPTHS OF ABOUT 12 FEET AND GRAY AT DEPTH, THOUGH THE <br />SOILS IN SOME BORINGS WERE BROWN THROUGHOUT THE DEPTHS EXPLORED AND OTHERS WERE GRAY FOR THE FULL DEPTH. ALL THE BORING <br />TERMINATED IN THE GLACIAL TILL SOILS. <br />SITE LOCATION MAP - ATTACH MAPS (U.S. GEOLOGIC SURVEY 7.5 MINUTE QUADRANGLE, NATIONAL WETLAND INVENTORY MAPS OR EQUIVALENT) SHOWING <br />THE LOCATION AND TYPE OF ALL RECEIVING WATERS, INCLUDING WETLANDS, DRAINAGE DITCHES, STORMWATER PONDS, OR BASINS, ETC. THAT WILL <br />RECEIVE RUNOFF FROM THE PROJECT. USE ARROWS SHOWING THE DIRECTION OF FLOW AND DISTANCE TO THE WATER BODY. <br />..i ij� <br />6 Loko ,�t�rn y <br />--rLYr� i0D:ylnr �. <br />'Perin etEr. G."4-ni <br />- r E <br />C.rd 11. li <br />�ryugo <br />4 <br />f <br />J 1:1?rn1 =1 N <br />GENERAL SITE INFORMATION (III.A) <br />1. DESCRIBE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROTION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT <br />PRACTICIES (BMP'S). INCLUDE THE TIMING FOR INSTALLATION AND PROCEDURES USED TO ESTABLISH ADDITIONAL TEMPORARY BMP'S AS NECESSARY. <br />(III.A.4.A) <br />THE PROJECT IS PROTECTED BY TWO (W) MAIN BMP'S, SILT FENCE AND INLET PROTECTION DEVICES. THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL <br />LOCATIONS OF THE SITE AND MONITORED AS NECESSARY. INLET PROTECTION DEVIDES WILL BE INSTALLED IN ALL CATCH BASINS ON THE SITE AND ANY OFF <br />SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES ADDITIONAL BMP'S SUCH AS EROSION CONTROL BLANKET <br />MAY BE UTILITZED. <br />2. ATTACH TO THIS SWPPP A TABLE WITH THE ANTICIPATED QUANITITIES FOR THE LIFE OF THE PROJECT FOR ALL EROSION PREVENTION AND SEDIMENT <br />CONTROL BMP'S (III.A.4.13) SEE PAGE SW1.3 <br />3. ATTACH TO THIS SWPPP A SITE MAP THAT INCLUDES THE FOLLOWING FEATURES (III.A.3.B-F): <br />EXIST AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST -CONSTRUCTION STORMRWATER RUNOFF DRAINAGE <br />AREAS LOCATED WITHIN THE PROJECT LIMITS. <br />LOCATIONS OF IMPERVIOUS SURFACES AND SOIL TYPES. <br />• EXISTING AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST -CONSTRUCTION STORMWATER RUNOFF <br />DRAINAGE AREAS LOCATED WITHIN PROJECT LIMITS. <br />• LOCATIONS OF AREAS NOT TO BE DISTRUBED. <br />• LOCATION OF AREAS OF PHASED CONSTRUCTION. <br />• ALL SURFACE WATERS AND EXISTING WETLANDS WITHIN ONE MILE FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER RUNOFF FROM <br />THE SITE (IDENTIFIABLE ON MAPS SUCH AS USGS 7.5 MINUTE QUADRANGLE MAPS OR EQUIVALENT. WHERE SURFACE WATERS RECEIVING RUNOFF <br />ASSOCIATED WITH CONSTRUCTION ACTIVITY WILL NOT FIT ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW, INDICATING BOTH <br />DIRECTION AND DISTANCE TO THE SURFACE WATER. <br />• METHODS TO BE USED FOR FINAL STABILIZATION OF ALL EXPOSED SOIL AREA <br />4. WERE STORMWATER MITIGATION MEASURES REQUIRED AS THE RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR OTHER REQUIRED LOCAL, STATE <br />OR FEDERAL REVIEW OF THE PROJECT? NO <br />IF YES, DESCRIBE HOW THESE MEASURES WERE ADDRESSED IN THE SWPPP. (III.A.6) <br />N/A <br />5. IS THE PROJECT LOCATED IN A KARST AREA SUCH THAT ADDITIONAL MEASURES WOULD BE NECESSARY OT PROJECT DRINKING WATER SUPPLY <br />MANAGEMENT AREAS AS DESCRIBED IN MINN. R. CHAPTERS 7050 AND 7060? NO <br />IF YES, DESCRIBE THE ADDITIONAL MEASURES TO BE USED. (III.A.7) <br />N/A <br />6. DOES THE SITE DISCHARGE TO A CALCEREOUS FEN LISTED IN MINN. R. 7050.0180, SUBP. 6 B? NO <br />IF YES, A LETTER OF APPROVAL FROM THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES MUST BE OBTAINED PRIOR TO APPLICATION FOR THIS <br />PERMIT. (PART I B.6 AND PART III.A.8) <br />7. DOES THE SITE DISCHARGE TO A WATER THAT IS LISTED AS IMPAIRED FOR THE FOLLOWING POLLUTANT(S) OR STRESSOR(S): PHOSPHORUS, TURBIDITY, <br />DISSOLVED OXYGEN OR BIOTIC IMPAIRMENT? USE THE SPECIAL AND IMPAIRED WATERS SEARCH TOOL AT: <br />WWW.PCA.STATE.MN.US/WATER/STORMWATER/STORMWATER-C.HTML <br />N/A <br />IF NO, SKIP TO TRAINING <br />DOES THE IMPAIRED WATER HAVE AN APPROVED TOTAL MAXIMUM DAILY LOADS (TMDL) WITH AN APPROVED WASTE LOAD ALLOCATION FOR CONSTRUCTION <br />ACTIVITY? NO <br />IF YES: <br />A. LIST THE RECEIVING WATER, THE AREAS OF THE SITE DISCHARGING TO IT, AND THE POLLUTANT(S) IDENTIFIED IN THE TMDL. <br />B. LIST THE BMP'S AND ANY OTHER SPECIFIC CONSTRUCTION STORMWATER RELATED IMPLEMENTATION ACTIVITIES IDENTIFIED IN THE TMDL. <br />IF THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF THE IMPAIRED WATER AND THE WATER FLOWS TO THE IMPAIRED WATER BUT NO SPECIFIC BMPS <br />FOR CONSTRUCTION ARE IDENTIFIED IN THE TMDL, THE ADDITIONAL BMPS IN APPENDIX A (C.1, C.2, C.3 & (C.4 -TROUT STREAM)) MUST BE ADDED TO THE <br />SWPPP AND IMPLEMENTED. (III.A.7). THE ADDITIONAL BMPS ONLY APPLY TO THOSE PORTIONS OF THE PROJECT THAT DRAIN TO ONE OF THE IDENTIFIED <br />DISCHARGE POINTS. <br />N/A <br />8. IDENTIFY ADJACENT PUBLIC WATERS WHERE THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES (DNR) HAS DECLARED "WORK IN WATER <br />RESTRICTIONS" DURING FISH SPAWNING TIMEFRAMES <br />N/A <br />SELECTION OF A PERMANENT STORMWATER MANAGEMENT SYSTEM (III.D.) <br />1. WILL THE PROJECT CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE? YES <br />IF YES, A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF FROM THE CUMULATIVE NEW IMPERVIOUS SURFACES MUST BE RETAINED ON SITE (SEE PART <br />IIID OF THE PERMIT) THROUGH INFILTRATION UNLESS PROHIBITED DUE TO ONE OF THE REASONS IN PART III.D.1.J. IF INFILTRATION IS PROHIBITED IDENTIFY <br />OTHER METHOD OF OTHER VOLUME REDUCTION (E.G., FILTRATION SYSTEM, WET SEDIMENTATION BASIN, REGIONAL PONDING OR EQUIVALENT METHOD <br />2. DESCRIBE WHICH METHOD WILL BE USED TO TREAT RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE PROJECT (III.D): <br />• WET SEDIMENTATION BASIN <br />• INFILTRATION/FILTRATION <br />• REGIONAL PONDS <br />• COMBINATION OF PRACTICES <br />INCLUDE ALL CALCULATIONS AND DESIGN INFORMATION FOR THE METHOD SELECTED. SEE PART IIID OF THE PERMIT FOR SPECIFIC REQUIREMENTS <br />ASSOCIATED WITH EACH METHOD. <br />INFILTRATION / FILTRATION / REGIONAL PONDING <br />CALCULATIONS ARE WITHIN THE SITE STORM WATER MANAGEMENT REPORT AND PART OF THIS SWPPP AS ATTACHMENT D. <br />3. IF IT IS NOT FEASIBLE TO MEET THE TREATMENT REQUIREMENT FOR THE WATER QUALITY VOLUME, DESCRIBE WHY. THIS CAN INCLUDE PROXIMITY TO <br />BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY PERMANENT STORMWATER MANAGEMENT <br />PRACTICES. DESCRIBE WHAT OTHER TREATMENT, SUCH AS GRASSES SWALES, SMALLER PONDS, OR GRIT CHAMBERS, WILL BE IMPLEMENTED TO TREAT <br />RUNOFF PRIOR TO DISCHARGE TO SURFACE WATERS. (III.C) <br />IT IS FEASIBLE TO MEET REQUIREMENT FOR WATER QUALITY VOLUME. <br />4. FOR PROJECTS THAT DISCHARGE TO TROUT STREAMS, INCLUDING TRIBUTARIES TO TROUT STREAMS, IDENTIFY METHOD OF INCORPORATING <br />TEMPERATURE CONTROLS INTO THE PERMANENT STORMWATER MANAGEMENT SYSTEM. <br />N/A <br />EROSION PREVENTION PRACTICES (IV.B) <br />DESCRIBE THE TYPES OF TEMPORARY EROSION PREVENTION BMP'S EXPECTED TO BE IMPLEMENTED ON THIS SITE DURING CONSTRUCITON: <br />1. DESCRIBE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES TO MINIMIZE EROSION. <br />DELINEATE AREAS NOT TO BE DISTURBED (E.G., WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) BEFORE WORK BEGINS. <br />SILT FENCE WILL BE INSTALLED AT ATHE DOWNHILL LOCATIONS OF THE SITE. <br />2. DESCRIBE METHODS OF TEMPORARILY STABILIZING SOILS AND SOIL STOCKPILES (E.G., MULCHES, HYDRAULIC TACKIFIERS, EROSION BLANKETS, ETC.): <br />TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, WITH PERMANENT COVER BEING EITHER SOD OR LANDSCAPE <br />FEATURES. <br />3. DESCRIBE METHODS OF DISSIPATING VELOCITY ALONG STORMWATER CONVEYANCE CHANNELS AND AT CHANNEL OUTLETS (E.G., CHECK DAMS, SEDIMENT TRAPS, RIP <br />RAP, ETC.): <br />SOD WILL BE UTILIZED ALONG CHANNELS AND RIP RAP AT CHANNEL. <br />4. DESCRIBE METHODS TO BE USED FOR STABILIZATION OF DITCH AND SWALE WETTED PERIMETERS (NOTE THAT MULCH, HYDRAULIC SOIL TACKIFIERS, HYDROMULCHES, <br />ETC. ARE NOT ACCEPTABLE SOIL STABILIZATION METHODS FOR ANY PART OF A DRAINAGE DITCH OR SWALE) <br />FINAL STABILIZATION OF SWALES WILL BE SOD <br />5. DESCRIBE METHODS TO BE USED FOR ENERGY DISSIPATION AT PIPE OUTLETS (E.G., RIP RAP, SPLASH PADS, GABIONS, ETC.) <br />RIP RAP WILL BE UTILIZED AT PIPE OUTLETS <br />6. DESCRIBE METHODS TO BE USED TO PROMOTE INFILTRATION AND SEDIMENT REMOVAL ON THE SITE PRIOR TO OFFSITE DISCHARGE, UNLESS INFEASIBLE (E.G., DIRECT <br />STORMWATER FLOW TO VEGETATED AREAS): <br />DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILIZED <br />7. FOR DRAINAGE OR DIVERSION DITCHES, DESCRIBE PRACTICES TO STABILIZE THE NORMAL WETTED PERIMETER WITHIN 200 LINEAL FEET OF THE PROPERTY EDGE OR <br />POINT OF DISCHARGE TO SURFACE WATER. THE LAST 200 LINEAL FEET MUST BE STABILIZED WITHIN 24 HOURS AFTER CONNECTING TO SURFACE WATERS AND <br />CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED FOR ALL DISCHARGES TO SPECIAL, IMPAIRED OR "WORK IN WATER <br />RESTRICTIONS". ALL OTHER REMAINING PORTIONS OF THE TEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A <br />SURFACE WATER, PROPERTY EDGE AND CONSTRUCTION IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED. <br />N/A, NO DITCHES ON SITE <br />8. DESCRIBE ADDITIONAL EROSION PREVENTION MEASURES THAT WILL BE IMPLEMENTED AT THE SITE DURING CONSTRUCTION (E.G., CONSTRUCTION PHASING, MINIMIZING <br />SOIL DISTURBANCE, VEGETATIVE BUFFERS, HORIZONTAL SLOPE GRADING, SLOPE DRAINING/TERRACING, ETC.): <br />OTHER EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO; MINIMIZING SITE EXPOSURE WHEN POSSIBLE. <br />9. IF APPLICABLE, INCLUDE ADDITIONAL REQUIREMENTS IN APPENDIX A PART C.3 REGARDING MAINTAINING A 100 -FOOT BUFFER ZONE OR INSTALLING REDUNDANT BMPS <br />FOR PORTIONS OF THE SITE THAT DRAIN TO SPECIAL WATERS). <br />N/A <br />10. IF APPLICABLE, DESCRIBE ADDITIONAL EROSION PREVENTION BMPS TO BE IMPLEMENTED AT THE SITE TO PROTECT PLANNED INFILTRATION AREAS <br />MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO INFILTRATION AREAS. <br />SEDIMENT CONTROL PRACTICIES (IV.C) <br />DESCRIBE THE METHODS OF SEDIMENT CONTROL BMPS TO BE IMPLEMENTED AT THIS SITE DURING CONSTRUCTION TO MINIMIZE SEDIMENT IMPACTS TO SURFACE WATERS, <br />INCLUDING CURB AND GUTTER SYSTEMS <br />1. DESCRIBE METHODS TO BE USED FOR DOWN GRADIENT PERIMETER CONTROL: <br />SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE <br />2. DESCRIBE METHODS TO BE USED TO CONTAIN SOIL STOCKPILES: <br />SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY <br />3. DESCRIBE METHODS TO BE USED FOR STORM DRAIN INLET PROTECTION: <br />SEE INLET PROTECTION DETAILS <br />4. DESCRIBE METHODS TO MINIMIZE VEHICLE TRACKING AT CONSTRUCTION EXITS AND STREET SWEEPING ACTIVITIES: <br />THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE. <br />5. DESCRIBE METHODS, IF APPLICABLE, ADDITIONAL SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO BE INSTALLED TO KEEP RUNOFF AWAY FROM PLANNED <br />INFILTRATION AREAS WHEN EXCAVATED PRIOR TO FINAL STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA: <br />SILT FENCE TO BE INSTALLED IMMEDIATELY AFTER GRADING TO PROTECT INFILTRATION AREAS. <br />6. DESCRIBE METHODS TO BE USED TO MINIMIZE SOIL COMPACTION AND PRESERVE TOP SOIL (UNLESS INFEASIBLE) AT THIS SITE: <br />LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED <br />7. DESCRIBE PLANS TO PRESERVE A 50 -FOOT NATURAL BUFFER BETWEEN THE PROJECT'S SOIL DISTURBANCE AND A SURFACE WATER OR PLANS FOR REDUNDANT <br />SEDIMENT CONTROLS IF A BUFFER IS INFEASIBLE: <br />DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. PROJECT WILL NOT DISTURB WITHIN 200 FEET OF WETLAND. <br />8. DESCRIBE PLANS FOR USE OF SEDIMENTATION TREATMENT CHEMICALS (E.G., POLYMERS, FLOCCULANTS, ETC.) SEE PART IV.C.10 OF THE PERMIT: <br />N/A <br />9. IS THE PROJECT REQUIRED TO INSTALL A TEMPORARY SEDIMENT BASIN DUE TO 10 OR MORE ACRES DRAINING TO A COMMON LOCATION OR 5 ACRES OR MORE IF THE <br />SITE IS WITHIN 1 MILE OF A SPECIAL OR IMPAIRED WATER? <br />NO <br />IF YES, DESCRIBE (OR ATTACH PLANS) SHOWING HOW THE BASIN WILL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH PART III.0 OF THE PERMIT. <br />N/A <br />DEWATERING AND BASIN DRAINING (IV.D) <br />1. WILL THE PROJECT INCLUDE DEWATERING OR BASIN DRAINING? NO <br />IF YES, DESCRIBE MEASURES TO BE USED TO TREAT/DISPOSE OF TURBID OR SEDIMENT -LADEN WATER AND METHOD TO PREVENT EROSION OR SCOUR OF DISCHARGE <br />POINTS (SEE PART IV. D OF THE PERMIT): <br />N/A <br />2. WILL THE PROJECT INCLUDE USE OF FILTERS FOR BACKWASH WATER? NO <br />IF YES, DESCRIBE HOW FILTER BACKWASH WATER WILL BE MANAGED ON THE SITE OR PROPERLY DISPOSED (SEE PART III.D.3. OF THE PERMIT): <br />N/A <br />ADDITIONAL BMP'S FOR SPECIAL WATERS AND DISCHARGES TO WETLANDS (APPENDIX A, PARTS C AND D) <br />1. SPECIAL WATERS. DOES YOUR PROJECT DISCHARGE TO SPECIAL WATERS? NO <br />2. IF PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATER <br />MANAGEMENT PRACTICES, THEN OTHER TREATMENT SUCH AS GRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS IS REQUIRED PRIOR TO DISCHARGE TO SURFACE <br />WATERS. DESCRIBE WHAT OTHER TREATMENT WILL BE PROVIDED. <br />N/A <br />3. DESCRIBE EROSION AND SEDIMENT CONTROLS FOR EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE TO A SPECIAL WATERS, AND TEMPORARY SEDIMENT <br />BASINS FOR AREAS THAT DRAIN FIVE OR MORE ACRES DISTURBED AT ONE TIME. <br />N/A <br />4. DESCRIBE THE UNDISTURBED BUFFER ZONE TO BE USED (NOT LESS THAN 100 LINEAR FEET FROM THE SPECIAL WATER). <br />N/A <br />5. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL ENSURE THAT THE PRE AND POST PROJECT RUNOFF RATE AND VOLUME FROM THE 1, <br />AND 2 -YEAR 24-HOUR PRECIPITATION EVENTS REMAINS THE SAME. <br />N/A <br />6. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL MINIMIZE ANY INCREASE IN THE TEMPERATURE OF TROUT STREAM RECEIVING WATERS <br />RESULTING IN THE 1, AND 2 -YEAR 24-HOUR PRECIPITATION EVENTS. <br />N/A <br />7. WETLANDS. DOES YOUR PROJECT DISCHARGE STORMWATER WITH THE POTENTIAL FOR SIGNIFICANT ADVERSE IMPACTS TO A WETLAND (E.G., CONVERSION OF A <br />NATURAL WETLAND TO A STORMWATER POND)? YES OR NO <br />IF YES, DESCRIBE THE WETLAND MITIGATION SEQUENCE THAT WILL BE FOLLOWED IN ACCORDANCE WITH PART D OF APPENDIX A. <br />N/A <br />INSPECTIONS AND MAINTENANCE (IV.E) <br />DESCRIBE PROCEDURES TO ROUTINELY INSPECT THE CONSTRUCTION SITE: <br />• ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND <br />• WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN (7) DAYS AFTER THAT <br />INSPECTIONS MUST INCLUDE STABILIZED AREAS, EROSION PREVENTION,AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS. <br />INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION STORMWATER INSPECTION CHECKLIST" <br />1. Describe practices for storage of building products with a potential to leach pollutants to minimize exposure to stormwater: <br />ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE <br />2. Describe practices for storage of pesticides, herbicides, insecticides, fertilizers, treatment chemical, and landscape materials: <br />ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZED EXPOSURE <br />3. Describe practices for storage and disposal of hazardous materials or toxic waste (e.g., oil, fuel, hydraulic fluids, paint solvents, petroleum-based products, wood preservative, additives, <br />curing compounds, and acids) according to Minn. R. ch. 7045, including restricted access and secondary containment: <br />ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS. <br />4. Describe collection, storage and disposal of solid waste in compliance with Minn. R. ch. 7035: <br />ALL CONSTRUCTION DEBRIS AND SOLID WASTER WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS <br />5. Describe management of portable toilets to prevent tipping and disposal of sanitary wastes in accordance with Minn. R. ch. 7040: <br />SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS NEEDED BY THE PROVIDER. <br />6. Describe spill prevention and response for fueling and equipment or vehicle maintenance: <br />EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT SHALL BE CHECKED FOR LEAKS. <br />7. Describe containment and disposal of vehicle and equipment wash water and prohibiting engine degreasing on the site: <br />ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE <br />8. Describe storage and disposal of concrete and other washout wastes so that wastes do not contact the ground: <br />ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE. <br />FINAL STABILIZATION (IV.G) <br />1. DESCRIBE METHOD OF FINAL STABILIZATION (PERMANENT COVER) OF ALL DISTURBED AREAS: <br />FINAL STABILIZATION WILL BE ACCOMPLISHED WITH PAVEMENT, SOD AND LANDSCAPE MATERIALS. <br />2. DESCRIBE PROCEDURES FOR COMPLETING FINAL STABILIZATION AND TERMINATING PERMIT COVERAGE (SEE PART IV.G.1-5): <br />UPON STABILIZATION DESCRIBED ABOVE, THE CONTRCTOR AND OWNER SHALL MUTUALLY TRANSFER THE NPDES PERMIT TO THE NEXT OWNER WITH DOCUMENTS <br />DESCRIBING THE NATURE OF TERMINATION PROCEDURE. <br />0 0 so�e <br />C� G3 O M p <br />Civil Engineering • Surveying • Landscape Architecture <br />4931 W. 35th Street, Suite 200 <br />St. Louis Park, MN 55416 <br />civilsitegroup.com 612-615-0060 <br />M I L L E P <br />HANSON <br />a r c h i t e c t s <br />Nt <br />M <br />IV J <br />L0 . ■ . <br />C W_ <br />G <br />O � <br />W <br />2 a <br />> O <br />>Q <br />a <br />1121� LL <br />2 <br />LUW <br />Of <br />N <br />IV J <br />L0 <br />CZ <br />G <br />J <br />0- <br />LUZ <br />Z <br />2 <br />C <br />LU <br />LU <br />__J <br />__J <br />L0 <br />CO <br />ti <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />Matthew R. Pavek <br />DATE 2/15/19 LICENSE No. 44263 <br />ISSUE/SUBMITTAL SUMMARY <br />DRAWN BY:BN REVIEWED BY: DK <br />PROJECT NUMBER: 18125 <br />REVISION SUMMARY <br />SWPPP - <br />ATTACHMENTS <br />■ <br />2/14/2019 4:59 PM ©COPYRIGHT2018 CIVIL SITE GROUP INC. <br />