My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 05.09.19
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2019 PC Packets
>
PC Packet 05.09.19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 5:33:51 PM
Creation date
5/6/2019 4:46:48 PM
Metadata
Fields
Template:
Commissions
Meeting Date
5/9/2019
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br />May 3, 2019 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Revised Preliminary Plat Review <br />Waters Edge 6t" Addition <br />WSB Project No. 3288-090 <br />Dear Ms. Juba: <br />We have reviewed the revised preliminary plat submittal for the above -referenced project. In <br />particular, we have reviewed the following plans related to this particular request: <br />• Revised Preliminary Plans dated 4/22/19 by Landform <br />Based on the review of the revised preliminary plan documents, we offer the following comments <br />related to this application: <br />Preliminary Plat <br />1. The Plat accurately indicates drainage and utility easements over the entirety of lot 38, <br />which includes all areas outside of each of the 37 individual lots. <br />Development Agreement <br />2. There are a number of development fees outlined within the City's Fee Schedule that will <br />become due as part of the final plat. <br />Grading, Street, and Utility Plans <br />3. Plans and Development Agreement will need to clearly identify maintenance responsibilities <br />for street, sanitary sewer, watermain, storm sewer, and retaining walls etc. The main line <br />sanitary sewer and watermain with be public infrastructure while the remaining will be private. <br />Wetland/Drainage <br />4. No wetland impacts are proposed as part of the proposed improvements. <br />5. Analysis was performed to ensure previous stormwater management facilities are <br />appropriately sized. Overall there is less impervious coverage that the previously approved <br />project. <br />Revised Water Reuse Plan <br />6. Water reuse will be utilized as part of this development. Water will be delivered to the site <br />from the Water's Edge Phase II Stormwater Reuse Improvement Project. <br />S:\Users\R_Juba\Rachel\DEVELOPMENT PROJECTS\Waters Edge\Waters Edge 6th - Fred Stelter\Prelminary Plat and PUD Amend\Engineer Comments\LTR - Waters Edge <br />6th Prelim Plat - 05 03 19.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.