Laserfiche WebLink
PROPEX-"SILT STOP" FABRIC <br />2'x2"x4' WOOD <br />STAKES @ 4' O.C. 10' MINIMUM <br />BACKFILL <br />EXISTING GROUND BURY BOTTOM <br />ji 6 OF FABRIC <br />PROPOSED - <br />EMBANKMENT <br />EROSION CONTROL SILT FENCE & C.B. PROTECTION (E-02) <br />STATE OF MINNESOTA POLLUTION CONTROL AGENCY STORM <br />PROJECT NARRATIVE <br />• THE PROJECT CONSISTS OF PREPARATION OF LAND FOR SINGLE FAMILY <br />DWELLING UNITS. WORK INCLUDES GRADING, INCLUDING EROSION CONTROL, <br />STORM SEWER, SAN. SEWER, WATER, AND CONSTRUCTION OF NATURAL GAS, <br />ELECTRICAL, CABLE TV AND COMMUNICATION SYSTEMS. THE SITE WAS <br />PREVIOUSLY DEVELOPED FOR MULTI -FAMILY UNITS. <br />• THE SWPPP ADDRESSES THE POTENTIAL FOR A DISCHARGE OF SEDIMENT AND <br />OTHER POTENTIAL POLLUTANTS FROM THE SITE WITH THE IMPLEMENTATION <br />OF THIS PLAN. <br />• REQUIREMENTS OF THE GENERAL PERMIT AUTHORIZATION TO DISCHARGE <br />STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (N.P.D.E.S.) / STATE <br />DISPOSAL SYSTEM (SDS) PERMIT PROGRAM TAKE PRECEDENCE OVER THE <br />PLANS AND THESE NOTES. <br />RESPONSIBILITY REQUIREMENTS <br />• THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS THE PROPOSED 2 <br />BASINS (PONDS). TOGETHER WITH ROADSIDE DITCHES. <br />• THE OWNER/DEVELOPER AND CITY WILL HAVE RESPONSIBILITY FOR LONG <br />TERM OPERATION AND MAINTENANCE OF THE PERMANENT STORM WATER <br />MANAGEMENT SYSTEM. <br />• OWNER/DEVELOPER & CONTRACTOR AND/OR ITS REPRESENTATIVE WILL HAVE <br />RESPONSIBILITY FOR IMPLEMENTATION OF THE SWPPP BEFORE AND DURING <br />CONSTRUCTION. <br />• THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A CHAIN OF <br />RESPONSIBILITY WITH ALL OPERATORS ON SITE TO ENSURE THAT THE SWPPP <br />WILL BE IMPLEMENTED AS FOLLOWS: <br />GRADING CONTRACTOR: PENDING <br />BUSINESS NAME <br />X X <br />CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) <br />STREETS & UTILITIES CONTRACTOR: PENDING <br />BUSINESS NAME <br />X X <br />CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) <br />• THE CONTRACTOR SHALL FOLLOW THE IMPLEMENTATION SEQUENCE AS <br />SHOWN ON THIS SHEET. <br />• CONTRACTOR TO ADHERE TO ALL REQUIREMENTS OF THE MINNESOTA <br />POLLUTION CONTROL AGENCY N.P.D.E.S. PERMIT, INCLUDING THE <br />REQUIREMENT TO MINIMIZE THE AREA DISTURBED BY GRADING AT ANY GIVEN <br />TIME AND TO COMPLETE TURF RESTORATION WITHIN THE TIME REQUIRED BY <br />THE PERMIT AFTER COMPLETION OF GRADING OF AN AREA. <br />• ALL BEST MANAGEMENT PRACTICES (BMP'S) SELECTED SHALL BE <br />APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, AND ESTIMATED <br />DURATION OF USE. <br />• A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER <br />CONSTRUCTION IS IN PROGRESS. <br />EROSION PREVENTION PRACTICES <br />• THE CONTRACTOR SHALL IMPLEMENT CONSTRUCTION PHASING, VEGETATIVE <br />BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION <br />PRACTICES THAT MINIMIZE EROSION. THE LOCATION OF AREAS NOT TO BE <br />DISTURBED MUST BE DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT <br />FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. <br />• ALL EXPOSED SOIL AREAS WITHIN 200 FEET OF A SURFACE WATER OR ANY <br />STORMWATER CONVEYANCE SYSTEM WHICH IS CONNECTED TO A SURFACE <br />WATER MUST BE STABILIZED WITHIN 7 DAYS (STEEPER THAN 3:1 SLOPES), 7 <br />DAYS (ALL OTHER AREAS). THESE AREAS INCLUDE POND SIDE SLOPES, <br />EXPOSED SOIL AREAS WITH A POSITIVE SLOPE TO A CURB AND GUTTER <br />SYSTEM, STORM SEWER INLET, DRAINAGE DITCH, OR OTHER SYSTEM THAT <br />DISCHARGES TO A SURFACE WATER. <br />• THE NORMAL WETTED PERIMETER OF ANY DRAINAGE DITCH MUST BE <br />STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM <br />THE POINT OF DISCHARGE TO ANY SURFACE WATER (WITHIN 24 HOURS OF <br />CONNECTING TO A SURFACE WATER). <br />• PIPE OUTLETS MUST BE PROVIDED WITH TEMP. OR PERMANENT ENERGY <br />DISSIPATION WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. <br />WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES <br />SEDIMENT CONTROL PRACTICES <br />• SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT ENTERING SURFACE <br />WATERS. DITCHES AND SEDIMENT BASINS REQUIRE SEDIMENT CONTROL <br />PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS. IF DOWN GRADE <br />SYSTEM IS OVERLOADED, ADDITIONAL UPGRADE PRACTICES MUST BE <br />INSTALLED, AND THE SWPPP MUST BE AMENDED. THERE SHALL BE NO <br />UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET FOR SLOPES WITH A <br />GRADE OF 3:1 OR STEEPER. SLOPES MAY BE BROKEN WITH SILT FENCE, <br />ROCK CHECK DAMS, COMPOST SNAKES, OR OTHER APPROVED METHODS <br />AND/OR AS SHOWN ON THE EROSION CONTROL PLAN. <br />• SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON DOWNGRADE <br />PERIMETERS BEFORE UPGRADE LAND DISTURBING ACTIVITIES BEGIN. <br />THE TIMING OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO <br />ACCOMMODATE SHORT TERM ACTIVITIES. HOWEVER, THESE PRACTICES MUST <br />BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE <br />ACTIVITY IS NOT COMPLETE. <br />• CONTRACTOR MUST PROTECT ALL STORM DRAIN INLETS BY APPROPRIATE <br />BMP'S DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR <br />DISCHARGING TO THE INLET HAVE BEEN STABILIZED. <br />• TEMPORARY STOCKPILES MUST HAVE SILT FENCE AROUND THE PERIMETER OF <br />THE BASE OF THE STOCKPILE AND CANNOT BE PLACED IN SURFACE WATERS, <br />INCLUDING STORM WATER CONVEYANCES SUCH AS CURB AND GUTTER <br />SYSTEMS, OR CONDUITS OR DITCHES. <br />• VEHICLE TRACKING MUST BE MINIMIZED BY BMP'S. STREET SWEEPING MUST <br />BE USED IF SUCH BMP'S ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM <br />BEING TRACKED ONTO THE STREET. CLEANUP OF TRACKED DEBRIS MUST BE <br />COMPLETED WITHIN 12 HOURS OF OCCURRENCE. <br />• CONTRACTOR MUST INSTALL TEMPORARY (OR PERMANENT) SEDIMENTATION <br />BASINS WHERE TEN OR MORE ACRES OF DISTURBED SOIL DRAIN TO A <br />COMMON LOCATION AND/OR AS SHOWN ON THE EROSION CONTROL PLAN. <br />DEWATERING AND SURFACE DRAINAGE <br />• DEWATERING OR ANY TYPE OF SURFACE DRAINAGE THAT MAY HAVE TURBID <br />OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A <br />SEDIMENT BASIN ON THE PROJECT SITE WHENEVER POSSIBLE. IF THE WATER <br />CANNOT BE DISCHARGED TO A BASIN PRIOR TO ENTERING THE SURFACE <br />WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMP'S SUCH THAT <br />THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR <br />DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT <br />DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. <br />THE DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND <br />BAGS, PLASTIC SHEETING, OR OTHER ACCEPTED ENERGY DISSIPATION <br />MEASURES. <br />• ALL WATER FROM DEWATERING MUST BE DISCHARGED IN A MANNER THAT <br />DOES NOT CAUSE NUISANCE CONDITIONS, EROSION, OR INUNDATION OF <br />WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WETLAND. <br />INSPECTIONS AND MAINTENANCE <br />• THE CONTRACTOR MUST APPOINT SOMEONE TO INSPECT THE CONSTRUCTION <br />SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN <br />24 HOURS AFTER A RAINFALL EVENT OF GREATER THAN 0.5 INCHES IN 24 <br />HOURS. ALL INSPECTIONS MUST BE RECORDED IN WRITING AND RETAINED <br />PER M.P.C.A. N.P.D.E.S. REQUIREMENTS. (NOTE: LOCAL JURISDICTION MAY <br />REQUIRE MORE FREQUENT INTERVAL OF INSPECTION.) <br />POLLUTION PREVENTION MANAGEMENT MEASURES <br />• SOLID WASTE MUST BE DISPOSED OF PER M.P.C.A. REQUIREMENTS. <br />• HAZARDOUS MATERIALS MUST BE STORED AND DISPOSED OF PER M.P.C.A. <br />REGULATIONS. <br />• EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A <br />DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTE <br />PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE. <br />KNOWLEDGEABLE PERSON: <br />Paragraph IIIA2 of the general permit is <br />hereby incorporated in it's entirety into <br />this SWPPP. <br />RECORDS RETENTION: <br />Shall be as stated in paragraph III.E. <br />Record retention items 1-5 of the <br />general permit shall be kept on site. <br />FINAL STABILIZATION <br />• THE PERMITEE (THE OWNER/DEVELOPER AND THE CONTRACTOR WHO SIGNS <br />THE MPCA NPDES/SDS APPLICATION FOR GENERAL STORM -WATER PERMIT <br />FOR CONSTRUCTION ACTIVITY) MUST ENSURE FINAL STABILIZATION OF THE <br />SITE. A NOTICE OF TERMINATION MUST BE SUBMITTED WITHIN 30 DAYS OF <br />FINAL STABILIZATION. <br />• FINAL STABILIZATION CAN BE ACHIEVED IN ONE OF THE FOLLOWING WAYS: <br />1.) ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND MORE <br />THAN 70% OF THE SURFACE STABILIZED WITH UNIFORM PERENNIAL <br />VEGETATIVE COVER AND; <br />A. ALL DITCHES ARE STABILIZED; <br />B. ALL EROSION BMP'S (SUCH AS SILT FENCE) MUST BE <br />REMOVED; <br />C. ALL SEDIMENT HAS BEEN CLEANED OUT FROM CONVEYANCES <br />AND SEDIMENTATION BASINS THAT ARE TO BE USED AS <br />PERMANENT BASINS. THE CLEANOUT OF PERMANENT BASINS <br />MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN <br />CAPACITY. <br />2.) FOR RESIDENTIAL CONSTRUCTION, TEMPORARY EROSION PROTECTION <br />AND DOWNGRADE PERIMETER CONTROL FOR INDIVIDUAL LOTS MUST <br />BE COMPLETED AND THE RESIDENCE HAS BEEN TRANSFERRED TO <br />THE HOMEOWNER. ADDITIONALLY, THE PERMITTEE MUST DISTRIBUTE <br />THE MPCA "HOMEOWNER FACTSHEET" TO THE HOMEOWNER. <br />TRANSFER OF RESPONSIBILITY FOR SWPPP <br />• FROM SITE GRADING CONTRACTOR TO STREET AND UTILITY CONTRACTOR: <br />FOLLOWING SITE GRADING COMPLETION, WHEN ALL EROSION CONTROL <br />MEASURES HAVE BEEN INSTALLED BY THE SITE GRADING CONTRACTOR AS <br />REQUIRED AND ARE IN WORKING ORDER WITHOUT NEED OF MAINTENANCE, AND <br />ALL MEASURES HAVE BEEN REVIEWED AND ACCEPTED BY THE STREET AND <br />UTILITY CONTRACTOR, EXCEPT FOR TURF RESTORATION WHICH MUST <br />DEMONSTRATE THAT IT IS VIABLY GROWING, THEN THE STREET AND UTILITY <br />CONTRACTOR WILL EXECUTE AN MPCA "APPLICATION FOR PERMIT <br />TRANSFER/MODIFICATION FORM" (AVAILABLE ON-LINE AT <br />WWW. PCA. STATE. MN. US) FOR THE TRANSFERENCE OF RESPONSIBILITY UNDER <br />THE ORIGINAL NPDES PERMIT ISSUED FOR THE PROJECT. <br />GENERAL REQUIREMENTS <br />• FOR DISCHARGES TO SPECIAL WATERS OR WETLANDS, REQUIREMENTS OF THE <br />GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED <br />WITH CONSTRUCTION ACTIVITY UNDER THE N.P.D.E.S./STATE DISPOSAL <br />SYSTEM PERMIT PROGRAM APPENDIX A MUST BE FOLLOWED. <br />• OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SOIL SLOPES <br />ON FINAL PASS, LEAVING TRACK GROOVES PERPENDICULAR TO THE SLOPE. <br />DO NOT BACK -BLADE. LEAVE A SURFACE ROUGH TO MINIMIZE EROSION. <br />• ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT <br />OPERATE EQUIPMENT WITHIN THE DRIPLINE, ROOT ZONES OR WITHIN TREE <br />PROTECTION FENCE AREAS. <br />• WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER <br />VEGETATIVE COVER TO HELP FILTER RUNOFF. <br />• ESTABLISH A PERMANENT VEGETATIVE COVER OVER ALL EXPOSED SOILS <br />WHERE LAND IS COMING OUT OF AGRICULTURAL PRODUCTION. PLANT AS <br />SOON AS POSSIBLE TO ESTABLISH DENSE GRASS FILTER PRIOR TO <br />CONSTRUCTION AND TO MINIMIZE WEED GROWTH. <br />ESTIMATED QUANTITIES: <br />I. <br />Rock Construction Entrance <br />- <br />2. <br />Catch Basin Protection <br />17 ea. <br />3. <br />Silt Fence <br />3500 <br />LF <br />4. <br />Straw Fiber Blanket <br />9300 <br />SF <br />5. <br />Rip Rap <br />- <br />W <br />6. <br />Seeding W/Hydraulic <br />RSED E <br />157E 0 <br />Z <br />�2 <br />Soil Stabilizer <br />3.0 <br />Ac. <br />7. <br />Temporary Seeding <br />C <br />LAKE <br />H- <br />W/Hydraulic Soil Stabilizer <br />3.0 <br />Ac. <br />8. <br />Bio Rolls <br />400 <br />LF <br />GENERAL REQUIREMENTS (CONT'D) <br />BMP'S REFER TO EROSION AND SEDIMENT CONTROL PRACTICES DEFINED IN <br />THE MPCA PROTECTING WATER QUALITY IN URBAN AREAS AND THE <br />MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING <br />HANDBOOK. <br />• ALL EROSION AND SEDIMENT CONTROL FACILITIES (BMP'S) SHALL BE <br />INSTALLED AND IN OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES. <br />SOME EROSION CONTROLS SUCH AS CHECK DAMS AND TEMPORARY <br />SILT PONDS MAY BE INSTALLED AS GRADING OCCURS IN THE <br />SPECIFIC AREA. THEY SHALL BE MAINTAINED UNTIL CONSTRUCTION <br />IS COMPLETED AND THE POTENTIAL FOR EROSION HAS PASSED. <br />• THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE <br />ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND <br />UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHALL <br />ANTICIPATE THAT MORE BMP'S WILL BE NECESSARY TO ENSURE EROSION AND <br />SEDIMENT CONTROL ON THE SITE. DURING THE COURSE OF CONSTRUCTION, <br />IT IS THE RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW <br />CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND/OR <br />CLIMATIC EVENTS AND TO PROVIDE ADDITIONAL BMP'S OVER AND ABOVE THE <br />MINIMUM REQUIREMENTS SHOWN ON THE PLANS THAT MAY BE NEEDED TO <br />PROVIDE EFFECTIVE PROTECTION OF WATER AND SOIL RESOURCES. <br />• SLOPES AT 3:1 OR STEEPER, AND/OR WHERE INDICATED ON THE PLANS <br />SHALL BE SEEDED AND HAVE AN EROSION CONTROL BLANKET MNDOT 3885 <br />CAT 3 TYPE 2S INSTALLED AND BE HYDROSEEDED WITH TACKIFER MULCH. <br />• ALL CONSTRUCTION ENTRANCES SHALL BE SURFACED WITH WASHED ROCK <br />ACROSS FULL WIDTH FROM ENTRANCE POINT TO 50 FEET INTO THE <br />CONSTRUCTION ZONE. CLEANING AND/OR REPLACEMENT MAY BE REQUIRED. <br />SEE DETAIL SHEET 5 OF 8. <br />• IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE EROSION <br />CONTROL FENCING BETWEEN THE NWL & HWL. <br />. STRAW BALE OR SILT FENCE PROTECTION OR OTHER MECHANICAL DEVICE <br />(WIMCO) SHALL BE INSTALLED AROUND ALL CATCH BASINS UNTIL THE SITE IS <br />RESTORED. <br />• INSTALL PERIMETER SILT FENCE AROUND THE DEVELOPMENT ON ALL DOWN <br />GRADIENTS AND AROUND ALL WETLANDS PRIOR TO ANY CONSTRUCTION. <br />• TEMPORARY SEED SHALL BE MNDOT MIX 190 @ 60 LBS. PER ACRE OR <br />APPROVED EQUAL. WITH HYDRAULIC SOIL STABILIZER TYPE 5 MNDOT 3884. <br />• PERMANENT TURF RESTORATION IS SEEDING IN ACCORDANCE WITH MNDOT <br />3876, SEED IS MIXTURE(S) ARE 240 & 310 W/HYDRAULIC SOIL STABILIZER <br />TYPE 5. <br />• IMMEDIATELY FOLLOWING SITE GRADING OPERATIONS AND PRIOR TO THE <br />INSTALLATION OF UTILITIES, THE ENTIRE SITE (EXCEPT ROADWAYS) SHALL <br />HAVE BEEN SEEDED AND MULCHED AND SILT FENCE SHALL HAVE BEEN <br />INSTALLED AROUND ALL PONDS. <br />• ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE <br />PROPERLY DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE <br />STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY MEASURES ARE NO <br />LONGER NEEDED. <br />• ALL BMP ITEMS AND QUANTITIES ARE CONTAINED WITHIN THE BID PROPOSAL <br />CONTAINED IN THE PROJECT MANUAL (SPECIFICATIONS) FOR THIS PROJECT <br />AND ARE INCORPORATED HERE -IN BY REFERENCE. <br />RECEIVING WATERS: <br />EXISTING STORM WATER PONDS, <br />EXISTING WETLAND -UNNAMED & <br />CITY STORM SEWER SYSTEM <br />SOIL TYPES PER NRCS: <br />SOILS HAVE BEEN MIXED WITH PREVIOUS <br />GRADING OPERATIONS. SOILS PER NRCS <br />PRIOR TO PREVIOUS GRADING INCLUDED <br />THE FOLLOWING: <br />75 -Bluffton loam <br />113 -Webster loam <br />123 -Dundas fine sandy loam <br />225 -Nessel fine sandy loam <br />Fred Stelter <br />14505 43rd Avenue N. <br />Plymouth MN 55446 <br />612.325.7414 <br />CIVIL ENGINEER /SURVEYOR <br />Landform Professional Services, LLC <br />Suite 15 <br />580 Dodge Avenue NW <br />Elk River, MN 55330 <br />763.441.2072 <br />LEGAL DESCRIPTION: <br />Lots 3-17, Block I, WATERS EDGE FOURTH <br />ADDITION, Washington County, MN. <br />UNIVERSITY OF MINNESOTA <br />Rc el <br />.il. <br />0-1 <br />Design of Constructio PP (May 31 2019) <br />Call 48 Hours before digging <br />GOPHER STATE ONE CALL <br />Twin Cities Area 651-454-0002 <br />MN. Toll Free 1-800-252-1166 <br />EROSION CONTROL, SCHEDULE <br />1. IMMEDIATELY FOLLOWING GRADING OF SLOPES 3:1 OR GREATER, <br />SLOPES MUST BE STABILIZED WITH WOOD FIBER BLANKET (OR <br />OTHER METHOD APPROVED BY THE ENGINEER) OVER APPROVED <br />SEED MIXTURE AND A MINIMUM OF 4" TOPSOIL <br />2. ALL EROSION CONTROL INSTALLATIONS SIIALL REMAIN IN PLACE <br />AND BE MAINTAINED IN GOOD CONDITION BY THE CONTRACTOR <br />UNTIL THE SITE HAS BEEN RE -VEGETATED, AT WHICH TIME IT <br />SHALL BE REMOVED. FOR PROPOSED PAVED SURFACE AREAS, THE <br />CONTRACTOR MAY REMOVE NECESSARY SILT FENCING TO <br />CONSTRUCT ROADWAYS WHILE MAINTAINING ADEQUATE EROSION <br />CONTROL IN ADJACENT AREAS. <br />3. SUFFICIENT TOPSOIL SHALL BE STOCKPILED TO ALLOW FOR THE <br />REPLACEMENT OF A MINIMUM OF 4" OF TOPSOIL FOR DISTURBED <br />AREAS TO BE RE -VEGETATED. <br />4. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY <br />INSTALLATION AND ROADWAY CONSTRUCTION SO THAT THE <br />GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON AFTER <br />DISTURBANCE. ALL DISTURBED AREAS SHALL BE SEEDED AND <br />MULCHED WITHIN _7 DAYS AFTER COMPLETION OF FINAL GRADING <br />OR AFTER :7 DAYS OF GRADING INACTIVITY. <br />EROSION CONTROL MAINTENANCE PROGRAM <br />1. INSPECT SILT FENCES IMMEDITATELY AFTER EACH RAINFALL AND <br />AT LEAST DAILY DURING A PROLONGED RAINFALL. IMMEDIATELY <br />REPAIR FAILED OR FAILING S1LT FENCE. <br />2. SEDIMENT REMOVAL - SEDIMENT DEPOSITS SHOULD BE REMOVED <br />AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN <br />DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE <br />BARRIER. <br />3. REPLACEMENT - FABRIC SHALL BE REPLACED PROMPTLY WHEN IT <br />DECOMPOSES OR BECOMES INEFFECTIVE BEFORE THE BARRIER IS <br />NO LONGER NECESSARY. <br />ANY SEDIMENT REMAINING IN PLACE AFTER THE SILT FENCE OR <br />FILTER FABRIC IS NO LONGER REQUIRED SHALL BE DRESSED TO <br />CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED <br />WITH THE APPROPRIATE SEED MIX, AS DIRECTED BY THE <br />ENGINEER. <br />4. IN THOSE AREAS WHERE WOODFIBER BLANKET OR OTHER SLOPE <br />STABILIZATION METHOD HAS FAILED, THE SLOPE SHALL BE RE-ESTABLISHED, <br />SEED AND TOPSOIL REPLACED, AND ADDITIONAL SLOPE TREATMENT <br />INSTALLED. <br />DE VEL OPMEN T SUMMA R Y <br />TOTAL PARCEL AREA: 571,805 Sq. Ft. <br />LOTS & STREET AREA: 196,267 Sq. Ft. <br />TOTAL DISTURBED AREA = 2.9 ACRES <br />TOTAL AREA FOR TURF RESTORATION = 1.8 ACRES <br />EXISTING IMPERVIOUS AREA = 1.62 ACRES <br />NEW IMPERVIOUS AREA = 3.39 ACRES <br />LOCATION: LAT. 45.1797 ; LONG. - 93.0207 <br />SPECIAL WATERS SEARCH <br />- CLEARWATER CREEK ASSASSMENT UNIT <br />07010206-519, 06/08/2018 <br />PERMIT I.D. NUMBER: PENDING <br />ISSUED <br />IMPLEMEN TA TION SEQUENCE: <br />I. INSTALL STABILIZED CONSTRUCTION ENTRANCE <br />13.13 Ac. <br />4.5 Ac. <br />2. INSTALL PERIMETER SEDIMENT CONTROL DEVICES (SILT <br />FENCE) <br />3. CONSTRUCT STORMWATER INFILTRATION AREAS <br />4. STOCKPILE TOPSOIL FOR RE -USE <br />5. COMPLETE SITE GRADING <br />6. STABILIZE DENUDED AREAS AND STOCKPILES WITHIN <br />TIMEFRAME LISTED IN EROSION PREVENTION PRACTICES <br />7. INSTALL UTILITIES, STORM SEWER, STORM DRAIN INLET <br />PROTECTION, CURB & GUTTER, & PAVING <br />8. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND <br />THE SITE STABILIZED, REMOVE ACCUMULATED SEDIMENT <br />FROM INFILTRATION AREAS, REMOVE SEDIMENT CONTROL <br />BMP'S, AND RESEED ANY AREAS DISTURBED BY THEIR <br />REMOVAL. <br />0 <br />O J <br />I <br />o <br />N <br />� <br />0 <br />< Q=� <br />0 <br />J <br />co <br />N <br />r" ST N <br />W <br />RSED E <br />157E 0 <br />Z <br />�2 <br />I- I <br />ONEKA <br />:2 <br />S <br />D <br />C <br />LAKE <br />H- <br />S� Cn <br />1 <br />U 2 <br />x <br />O <br />LL_•`�� <br />v <br />o0 <br />' 157TH P <br />(n <br />F7- <br />(Z <br />Q <br />Z_JZ5; <br />Q <br />1 WAY CLiT <br />W <br />J <br />Q <br />6 <br />co <br />°o <br />Q:f <br />(� <br />W <br />r <br />W>_ <br />_(71 <br />a Z <br />J <br />07 <br />w5F[n� <br />152ND ST N <br />� <br />Z <br />W <br />0' <br />152NCI <br />JIN <br />O <br />z <br />O <br />W <br />152ND <br />w <br />w l Y l <br />O <br />a w WAY N <br />w <br />w <br />W <br />J <br />C� <br />U <br />> <br />150TH S <br />t <br />Lj_ <br />- a 150TH <br />T _ <br />X <br />PROJECT w> Z <br />¢Q D <br />, �F <br />LOCATION w �¢ <br />48T, <br />ww ONEKA <br />�P <br />X <br />a <br />N cF2 <br />HUGO <br />X <br />8 CITY HA L� a <br />O <br />47 <br />LO R <br />51 <br />9L�2FL � <br />9 <br />x <br />(Z <br />I <br />147T ST <br />Q U � <br />UP ER 146T S N <br />--�IRENCl1MAN RD 6TH S NE <br />I <br />146T ST <br />X <br />Z <br />� L_ O <br />14TH ST N <br />Z - <br />EGG <br />14FZ ST <br />�Z a <br />45TH -ST N <br />w Z <br />�LAK <br />x v <br />Ln Ln <br />w <br />Q > <br />142ND}T ¢ a <br />¢ <br />Y <br />o <br />aZ J 42N <br />Z m <br />3 a <br />w <br />w> U, <br />o <br />o <br />z <br />J <br />wQ <br />7 <br />SECTION 18, TOWNSHIP 31, RANGE 21 <br />No scA1E <br />- VICINITY MAP <br />x X <br />X <br />x <br />U <br />T O�O <br />RECEIVING WATERS: <br />EXISTING STORM WATER PONDS, <br />EXISTING WETLAND -UNNAMED & <br />CITY STORM SEWER SYSTEM <br />SOIL TYPES PER NRCS: <br />SOILS HAVE BEEN MIXED WITH PREVIOUS <br />GRADING OPERATIONS. SOILS PER NRCS <br />PRIOR TO PREVIOUS GRADING INCLUDED <br />THE FOLLOWING: <br />75 -Bluffton loam <br />113 -Webster loam <br />123 -Dundas fine sandy loam <br />225 -Nessel fine sandy loam <br />Fred Stelter <br />14505 43rd Avenue N. <br />Plymouth MN 55446 <br />612.325.7414 <br />CIVIL ENGINEER /SURVEYOR <br />Landform Professional Services, LLC <br />Suite 15 <br />580 Dodge Avenue NW <br />Elk River, MN 55330 <br />763.441.2072 <br />LEGAL DESCRIPTION: <br />Lots 3-17, Block I, WATERS EDGE FOURTH <br />ADDITION, Washington County, MN. <br />UNIVERSITY OF MINNESOTA <br />Rc el <br />.il. <br />0-1 <br />Design of Constructio PP (May 31 2019) <br />Call 48 Hours before digging <br />GOPHER STATE ONE CALL <br />Twin Cities Area 651-454-0002 <br />MN. Toll Free 1-800-252-1166 <br />EROSION CONTROL, SCHEDULE <br />1. IMMEDIATELY FOLLOWING GRADING OF SLOPES 3:1 OR GREATER, <br />SLOPES MUST BE STABILIZED WITH WOOD FIBER BLANKET (OR <br />OTHER METHOD APPROVED BY THE ENGINEER) OVER APPROVED <br />SEED MIXTURE AND A MINIMUM OF 4" TOPSOIL <br />2. ALL EROSION CONTROL INSTALLATIONS SIIALL REMAIN IN PLACE <br />AND BE MAINTAINED IN GOOD CONDITION BY THE CONTRACTOR <br />UNTIL THE SITE HAS BEEN RE -VEGETATED, AT WHICH TIME IT <br />SHALL BE REMOVED. FOR PROPOSED PAVED SURFACE AREAS, THE <br />CONTRACTOR MAY REMOVE NECESSARY SILT FENCING TO <br />CONSTRUCT ROADWAYS WHILE MAINTAINING ADEQUATE EROSION <br />CONTROL IN ADJACENT AREAS. <br />3. SUFFICIENT TOPSOIL SHALL BE STOCKPILED TO ALLOW FOR THE <br />REPLACEMENT OF A MINIMUM OF 4" OF TOPSOIL FOR DISTURBED <br />AREAS TO BE RE -VEGETATED. <br />4. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY <br />INSTALLATION AND ROADWAY CONSTRUCTION SO THAT THE <br />GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON AFTER <br />DISTURBANCE. ALL DISTURBED AREAS SHALL BE SEEDED AND <br />MULCHED WITHIN _7 DAYS AFTER COMPLETION OF FINAL GRADING <br />OR AFTER :7 DAYS OF GRADING INACTIVITY. <br />EROSION CONTROL MAINTENANCE PROGRAM <br />1. INSPECT SILT FENCES IMMEDITATELY AFTER EACH RAINFALL AND <br />AT LEAST DAILY DURING A PROLONGED RAINFALL. IMMEDIATELY <br />REPAIR FAILED OR FAILING S1LT FENCE. <br />2. SEDIMENT REMOVAL - SEDIMENT DEPOSITS SHOULD BE REMOVED <br />AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN <br />DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE <br />BARRIER. <br />3. REPLACEMENT - FABRIC SHALL BE REPLACED PROMPTLY WHEN IT <br />DECOMPOSES OR BECOMES INEFFECTIVE BEFORE THE BARRIER IS <br />NO LONGER NECESSARY. <br />ANY SEDIMENT REMAINING IN PLACE AFTER THE SILT FENCE OR <br />FILTER FABRIC IS NO LONGER REQUIRED SHALL BE DRESSED TO <br />CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED <br />WITH THE APPROPRIATE SEED MIX, AS DIRECTED BY THE <br />ENGINEER. <br />4. IN THOSE AREAS WHERE WOODFIBER BLANKET OR OTHER SLOPE <br />STABILIZATION METHOD HAS FAILED, THE SLOPE SHALL BE RE-ESTABLISHED, <br />SEED AND TOPSOIL REPLACED, AND ADDITIONAL SLOPE TREATMENT <br />INSTALLED. <br />DE VEL OPMEN T SUMMA R Y <br />TOTAL PARCEL AREA: 571,805 Sq. Ft. <br />LOTS & STREET AREA: 196,267 Sq. Ft. <br />TOTAL DISTURBED AREA = 2.9 ACRES <br />TOTAL AREA FOR TURF RESTORATION = 1.8 ACRES <br />EXISTING IMPERVIOUS AREA = 1.62 ACRES <br />NEW IMPERVIOUS AREA = 3.39 ACRES <br />LOCATION: LAT. 45.1797 ; LONG. - 93.0207 <br />SPECIAL WATERS SEARCH <br />- CLEARWATER CREEK ASSASSMENT UNIT <br />07010206-519, 06/08/2018 <br />PERMIT I.D. NUMBER: PENDING <br />ISSUED <br />IMPLEMEN TA TION SEQUENCE: <br />I. INSTALL STABILIZED CONSTRUCTION ENTRANCE <br />13.13 Ac. <br />4.5 Ac. <br />2. INSTALL PERIMETER SEDIMENT CONTROL DEVICES (SILT <br />FENCE) <br />3. CONSTRUCT STORMWATER INFILTRATION AREAS <br />4. STOCKPILE TOPSOIL FOR RE -USE <br />5. COMPLETE SITE GRADING <br />6. STABILIZE DENUDED AREAS AND STOCKPILES WITHIN <br />TIMEFRAME LISTED IN EROSION PREVENTION PRACTICES <br />7. INSTALL UTILITIES, STORM SEWER, STORM DRAIN INLET <br />PROTECTION, CURB & GUTTER, & PAVING <br />8. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND <br />THE SITE STABILIZED, REMOVE ACCUMULATED SEDIMENT <br />FROM INFILTRATION AREAS, REMOVE SEDIMENT CONTROL <br />BMP'S, AND RESEED ANY AREAS DISTURBED BY THEIR <br />REMOVAL. <br />00OOMM0') <br />W <br />�O O 00 CO N <br />Q O ) N N <br />D GD oc)N N <br />0 <br />O J <br />I <br />o <br />N <br />� <br />0 <br />�~O <br />0 <br />O_ <br />N <br />Q <br />W <br />H-r�a <br />X <br />:2 <br />Z <br />D <br />C <br />(� <br />H- <br />Lj <br />Lj <br />O <br />O <br />LL_•`�� <br />v <br />o0 <br />(n <br />F7- <br />(Z <br />Q <br />Z_JZ5; <br />Q <br />m <br />W <br />J <br />� <br />- <br />Q:f <br />(� <br />W <br />0 <br />W>_ <br />_(71 <br />� <br />07 <br />w5F[n� <br />(n <br />� <br />Q <br />W <br />0' <br />W <br />�OZ> <br />O <br />z <br />O <br />W <br />C� <br />~ <br />-_(n Q <br />Q W 0' <br />O <br />X <br />W <br />W <br />J <br />C� <br />U <br />M <br />N <br />Lj_ <br />I 0 <br />U E o <br />X <br />00OOMM0') <br />W <br />�O O 00 CO N <br />Q O ) N N <br />D GD oc)N N <br />0 <br />•u <br />Z <br />Z <br />0 <br />O J <br />I <br />o <br />N <br />� <br />0 <br />0 <br />O_ <br />N <br />Q <br />X <br />:2 <br />Vv <br />? <br />Q <br />J <br />O <br />DD <br />w <br />I <br />LL_•`�� <br />v <br />N <br />O <br />N <br />u7 <br />N <br />� <br />I <br />i <br />M <br />,I- <br />M <br />m m <br />00 <br />Q <br />Z Z <br />W <br />O <br />z <br />w O_ 3:U <br />C� <br />~ <br />-_(n Q <br />Q W 0' <br />W <br />_ <br />X <br />W <br />W <br />J <br />C� <br />U <br />C <br />Lj_ <br />I 0 <br />U E o <br />X <br />Q T� co <br />X <br />V) O 0 <br />X <br />'4-W <br />O� <br />x <br />(Z <br />Q U � <br />X <br />Z <br />� L_ O <br />� <br />X <br />to V) Ln <br />!E <br />x v <br />Ln Ln <br />X J <br />x <br />� U <br />X O <br />O� V <br />N <br />x <br />X <br />x X <br />X <br />x <br />U <br />T O�O <br />(n <br />N <br />ID <br />ID <br />c <br />X <br />hoc <br />Q) � 4- <br />c <br />- U O + W <br />O <br />(/7 <br />0 <br />•u <br />Z <br />Z <br />0 <br />0 <br />0 <br />Q <br />X <br />:2 <br />Vv <br />? <br />Q <br />J <br />O <br />O rte., <br />1 <br />w <br />LL_•`�� <br />v <br />a_ <br />LIJ <br />V) <br />w <br />Q <br />SHEET N0. / <br />4 OF <br />/ 9 <br />