My WebLink
|
Help
|
About
|
Sign Out
Home
2019.05.06 CC Packets
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.05.06 CC Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:56:43 PM
Creation date
5/7/2019 11:02:44 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/6/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T.1 <br />2 <br />0 <br />U <br />0 <br />Z <br />w <br />m <br />LO <br />00 <br />N <br />Z <br />J <br />D <br />a <br />0- <br />r <br />Z <br />CO <br />W <br />w <br />U) <br />w <br />wsb <br />April 30, 2019 <br />Honorable Mayor and City Council <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: 130th Street Improvement Project <br />City of Hugo <br />S.A.P.224-110-002 <br />WSB Project No. R-010892-000 <br />Dear Mayor and Council Members: <br />Bids were received for the above -referenced project on Tuesday, April 30, 2019, and were <br />opened and read aloud. Four bids were received. The bids were checked for mathematical <br />accuracy. Please find enclosed the bid summary indicating the low bid as submitted by Dresel <br />Contracting, Inc., Chisago City, Minnesota the amount of $2,650,716.57. The Engineer's <br />Estimate was $2,814,416.00. <br />Dresel Contracting did not submit the Bidders Acknowledgement of Notice to Bidders, a <br />document indicating items traditionally included in the project manual are now available over the <br />internet. Dresel contracting immediately provided the signed document when notified it was <br />missing from their bid submittal. City Attorney Snyder indicated he did not believe that this <br />omission would materially affect the outcome of the bid or furnish any advantage to the bidder in <br />not having supplied it in a signed form until after the bids were opened. He did not believe it <br />should be construed as disqualifying. <br />We recommend that the City Council consider these bids and award a contract in the amount of <br />$2,650,716.57 to Dresel Contracting, Inc. based on the results of the bids received. <br />Sincerely, <br />WSB <br />` . FIe� <br />Mark Erichson, PE <br />Sr. Project Manager <br />Attachments <br />cc: Katie Koscielak, WSB <br />kkp <br />K:1010892-0001AdminlConstruction Admin1010892-000 LOR 043019.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.