My WebLink
|
Help
|
About
|
Sign Out
Home
2019.04.15 CC Minutes
Hugo
>
City Council
>
City Council Minutes
>
2019 CC Minutes
>
2019.04.15 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 11:54:41 AM
Creation date
5/7/2019 11:40:16 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/6/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo City Council Meeting Minutes for April 15, 2019 <br />Page 4 of 10 <br /> <br /> <br />Approve Wetland Replacement Plan for Rosemary Apartments <br /> <br />To accommodate the construction of a 45-unit apartment complex along Rosemary Way, MWF <br />Properties submitted an application requesting approval to impact wetlands found on site. The <br />applicant was proposing to impact 0.05 acres of wetland. Impacts are to two separate wetlands on <br />the property and will impact a portion on the east side of the project and a portion on the west side <br />of the project. MWF Properties was proposing to replace the wetlands that are impacted through <br />the purchase of wetland credits from an existing approved wetland bank in Rosemary Way <br />Mitigation Area. Based on staff’s review of the application and supporting documentation, the <br />requirements under the MN Wetland Conservation Act (WCA) had been met. Adoption of the <br />Consent Agenda approved the MWF Properties application for sequencing and wetland <br />replacement. <br /> <br />Approve Wetland Replacement Plan for 165th Street Solar Farm <br /> <br />To accommodate the development of a solar facility along 165th Street, Sunrise Energy Ventures <br />(FastSun4, LLC) had submitted a revised application based on a previous joint application that <br />was approved in November 2018. The revision included an increase in avoidable wetland impact <br />that requires replacement from 0.165 acres to 0.197 acres. The applicant was proposing to replace <br />the additional wetlands that are impacted through the purchase of wetland credits. Based on <br />staff’s review of the application and supporting documentation, the requirements under the MN <br />Wetland Conservation Act (WCA) had been met. Adoption of the Consent Agenda approved the <br />Sunrise Energy Ventures application for sequencing and wetland replacement. <br /> <br />Approve Resolutions Approving Oneka Place 3rd Addition Final Plat and Development <br />Agreement <br /> <br />CPDC – Pratt – Oakwood, LLP, had requested approval of a final plat and development <br />agreement to plat 54 residential lots and 3 outlots from the Oneka Place preliminary plat. This <br />will develop a 13.7 acre piece of property legally described as Outlots J and K, Oneka Place. The <br />site was currently vacant. The lots met the minimum lot standards and requirements for the Oneka <br />Place PUD. Adoption of the Consent Agenda approved RESOLUTION 2019-17 APPROVING <br />FINAL PLAT AND DEVELOPMENT AGREEMENT FOR CPDC – PRATT – OAKWOOD, <br />LLP, ON PROPERTY LOCATED NORTH OF ONEKA PARKWAY AND NORTH OF 159TH <br />STREET FOR ONEKA PLACE 2nd ADDITION. <br /> <br />Update on Waters Edge Water Reuse Project Phase II <br /> <br />At the April 1, 2019, City Council meeting, the City Council approved the Rice Creek Watershed <br />District Cost-Share Agreement for the Water’s Edge Phase 2 Water Reuse Improvement Project. <br />City Engineer Mark Erichson provided a summary of the Phase I project that retrofitted the <br />existing irrigation system to irrigate 30 acres using stormwater instead of City potable water. This <br />project was done in partnership with the Rice Creek Watershed District, Metropolitan Council, <br />and the Waters Edge Homeowner Association. The HOA now wanted to expand the project to <br />irrigate another 40 acres, and the RCWD has agreed to provide a grant of $185,760. Like Phase <br />One, the system would be maintained by the HOA, and they would pay the annual water bill to <br />the City to recover costs. Both projects will save an estimated 20-30 million gallons of water, <br />which reduces the construction of future water infrastructure, cleans up stormwater, and makes it <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.