Laserfiche WebLink
Pay Voucher <br />Page 7 of 8 <br />CITY OF HUGO <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Project No. R-010892-000 <br />Pav Voucher No. 1 <br />R-010892-000 <br />Project Material Status <br />Quantity <br />Line <br />Item <br />Description <br />7UnitsUnit <br />Price <br />Contract <br />This <br />Amount This <br />Quantity <br />Amount <br />Quantity <br />Pay <br />Pay Voucher <br />To Date <br />To Date <br />Voucher <br />88 <br />2582.518 <br />CROSSWALK <br />MULTI COMP <br />S F <br />$6.63 <br />130 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />Totals For Section SCHEDULE A. - SURFACE IMPROVEMENTS: <br />$104,261.78 <br />$104,261.78 <br />SCHEDULE B. - STORM SEWER IMPROVEMENTS <br />89 <br />2104.502 <br />SALVAGE CATCH <br />BASIN _ <br />SALVAGE <br />STRUCTURE <br />EACH <br />$1,035.00 <br />1 <br />1 <br />$1,035.00 <br />1 <br />$1,035.00 <br />90 <br />2104.502 <br />EACH <br />$1,035.00 <br />$9.41 <br />1 <br />220 <br />1 <br />$1,035.00 <br />1 <br />$1,035.00 <br />91 <br />2104.503 <br />REMOVE SEWER <br />L F <br />62 <br />$583.42 <br />62 <br />$583.42 <br />PIPE (STORM) <br />92 <br />2104.503 <br />SALVAGE PIPE SEWER <br />L F <br />$18.82 <br />110 <br />48 <br />$903.36 <br />48 <br />$903.36 <br />93 <br />2105.504 <br />GEOTEXTILE <br />FABRIC TYPE 4 <br />S Y <br />$21.56 <br />48 <br />8.7 <br />$187.67 <br />8.7 <br />$187.67 <br />94 <br />2501.502 <br />12" RC PIPE <br />APRON <br />EACH <br />$1,154.03 <br />2 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />95 <br />2501.502 <br />15" RC PIPE <br />APRON <br />EACH <br />$1,330.71 <br />7 <br />3 <br />$3,992.13 <br />3 <br />$3,992.13 <br />96 <br />2501.502 <br />18" RC PIPE <br />APRON <br />EACH <br />$1,047.42 <br />6 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />97 <br />2502.503 <br />4" PVC PIPE <br />DRAIN <br />6" PERF PVC <br />PIPE DRAIN <br />L F <br />$15.94 <br />70 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />98 <br />2502.503 <br />L F <br />$19.26 <br />2000 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />4" PVC PIPE <br />99 <br />2502.602 <br />DRAIN <br />EACH <br />$126.50 <br />20 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />CLEANOUT <br />100 <br />2503.503 <br />16" PVC PIPE <br />SEWER <br />L F <br />$45.57 <br />80 <br />80 <br />$3,645.60 <br />80 <br />$3,645.60 <br />12" RC PIPE <br />101 <br />2503.503 <br />SEWER DES 3006 <br />L F <br />$47.97 <br />34 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />CL V <br />IV'RC PIPE <br />102 <br />2503.603 <br />�CLV <br />SEWER DES 3006 <br />L F <br />$46.76 <br />3203 <br />1545 <br />$72,244.20 <br />1545 <br />$72,244.20 <br />18" RC PIPE <br />103 <br />2503,603 <br />SEWER DES 3006 <br />L F <br />$53.74 <br />824 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />CL V <br />104 <br />2503.603 <br />INSTALL PIPE <br />SEWER <br />L F <br />$28.23 <br />110 <br />48 <br />$1,355.04 <br />48 <br />$11,3515.014 <br />105 <br />2503.602 <br />CONSTRUCT EACH <br />BULKHEAD <br />$517.50 <br />2 <br />1 <br />$517.50 <br />1 <br />$517.50 <br />CONNECT TO <br />106 <br />2503.602 <br />EXISTING STORM EACH <br />$828.00 <br />1 <br />1 <br />$828.00 <br />1 <br />$828.00 <br />T <br />SEWER <br />CONNECT TO <br />107 <br />2503.602 <br />EXISTING <br />EACH <br />$943.00 <br />1 <br />1 <br />$943.00 <br />1 <br />$943.00 <br />MANHOLES <br />CONST <br />