Laserfiche WebLink
b) Recording. The developer shall record the DA with Washington <br />County simultaneous with the recording of the plat, and shall forward confirmation of the DA to the <br />City prior to the issuance of building permits. All applicable conditions of plat approval must be <br />met before any deeds are stamped for recording and prior to the recording of the final plat at the <br />Washington County Recorder's Office. Final plat approval shall be contingent upon compliance <br />with the grading, storm water drainage and utility plan approved and upon compliance with this <br />Development Agreement. <br />c) Model Homes. In the event that site grading is approved by the City <br />prior to final plat approval and/or execution of this Agreement, posting of security and filing of <br />final plat, the Developer shall be entitled to one building permit per housing unit type on lots that <br />abut existing streets or roadways, subject to final approval by the City. No model homes may be <br />constructed or utilized until at least one lift of bituminous has been installed from said model home <br />providing access to a public street or roadway outside of the Plat. No certificate of occupancy shall <br />be issued for any model or other home until all necessary public improvements and utilities have <br />been installed and the utilities have been successfully tested. Prior to this, and at the time that a <br />model home passes final inspection, a model home may only be used by Developer's staff or <br />realtors for purposes of showing the models to potential buyers. No model home may be used until <br />landscaping conforming to City Ordinance and Section 14 of this agreement has been installed. <br />d) Sales Trailers. The developer may be entitled to a maximum of one <br />temporary sales office (sales trailer) for this and all subsequent phases of the development for a <br />period of time not to exceed nine (9) months. Upon receipt of an acceptable site plan, a sales trailer <br />may be approved by the Community Development Director prior to the first model home being <br />available for showing. The trailer is subject to the issuance of a building permit, shall meet all <br />applicable building codes, shall be fully skirted, shall be suitably landscaped, shall contain <br />sufficient parking for the size of the office, and shall have safe and suitable access to a paved, <br />public roadway. The trailer shall be removed, and the site shall be restored within seven (7) days <br />following the date that a model home passes final inspection. <br />e) Deviations. No material deviations from the approved final plat <br />shall be allowed unless approved in writing by the City. Approval herein is also given subject to <br />full compliance with the conditions of approval and findings adopted by the Planning Commission <br />and City Council in connection with the approval of the development. <br />f) Certificates of Survey. A certificate of survey shall be provided to <br />the Building Inspector for each lot at the time a building permit is requested for the lot. Attached to <br />the certificate of survey shall be an erosion control plan for the lot showing location and type of all <br />erosion control measures to be used on the lot, and a grading plan, tree preservation and <br />landscaping plan shall be submitted for each home site. <br />Fable Hill 6th Addition Development Agreement <br />