My WebLink
|
Help
|
About
|
Sign Out
Home
2015 ANNUAL BUS TOUR
Hugo
>
Misc
>
Bus Tour Packets
>
2015 ANNUAL BUS TOUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 10:58:04 AM
Creation date
9/3/2019 2:47:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FABLE HILL FOURTH ADDITION <br />PARK PLAN ESTIMATE <br />26' Hexagonal Shelter $38,604.25 <br />(includes engineered drawings, installation, <br />freight and tax) <br />Four (4) Picnic Tables <br />Trees: <br />Blackhill Spruce, Autumn Blaze Maple, <br />Spring Snow Flowering Crab and <br />Mulch for base of trees <br />Irrigation <br />Seeding <br />TOTAL PARK ESTIMATE <br />Park Dedication ($2,400/lot x 26 lots) <br />DIFFERENCE <br />$ 3,700.00 <br />$12,630.00 <br />$13,804.00 <br />8,910.00 <br />$77,648.25 <br />62 400.00 <br />$15,248.50 <br />IW <br />i <br />Z' 7i� <br />�NL 4 t <br />e. _..._� 7�1 n <br />Afik\ Ott,. ►1Z v_- <br />wkw4w FAq, <br />1%t4 kr 9W OF Pm* <br />i <br />W-r-W -PEETAt- <br />
The URL can be used to link to this page
Your browser does not support the video tag.