Laserfiche WebLink
Precast wall panel, flat <br />exposed aggregate <br />Prefinished metal parapet cap <br />Architectural metal panels, <br />deep groove profile <br />Precast wall panel, smooth <br />trowel finish, stained <br />Precast wall panel, corduroy <br />with exposed aggregate <br />Second Floor <br />112' -6" <br />Third Floor Plan <br />125' -0" <br />Precast wall panel, flat exposed aggregate <br />Corduroy with exposed aggregate <br />Prefinished metal cornice <br />Rootop unit, behind parapet <br />TO Parapet <br />148' -8" <br />TO Wall <br />144' -0" <br />Precast wall panel, smooth trowel finish, stained <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />J <br />K <br />L <br />M <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />J <br />K <br />L <br />M <br />© COPYRIGHT BY CNH ARCHITECTS, INC.7300 WEST 147TH STREET SUITE 504 APPLE VALLEY, MN 55124-7580 (952) 431-4433CNH NO.: <br />2 3 4 5 6 7 8 9 10 11 12 13 14 151 <br />REVISIONS: <br />DATE:C:\Users\TJordan\Documents\18063 - State Storage Hugo_tjordan.rvt9/9/2019 12:00:37 PMCity Submittal -09/05/19 CS06Hugo Climate ControlledStorageHighway 61 & 152nd Street N18063 <br />08/02/19 <br />Exterior <br />Elevations - <br />Phase 2 <br />1/8" = 1'-0"CS06 <br />A1 North Elevation - Phase 2 <br />1/8" = 1'-0"CS06 <br />H1 East Elevation - Phase 2 <br />CS06 <br />A9 Perspective from Northwest Corner - Phase 2