Laserfiche WebLink
214COMPREHENSIVE WATER SUPPLY <br />AND DISTRIBUITION PLAN <br />2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 <br />for review only <br />Preventative Maintenance <br />Longterm preventative programs and measures for the City’s existing <br />water system will help reduce the risk of emergency situations� The <br />City of Hugo staff has a number of programs to help reduce these <br />risks� <br />The well pumps are critical to the system’s supply and do wear out <br />with time due to their extensive use� Public Works Operations staff <br />checks pump oil, bearings, and packing each weekday� Staff changes <br />the pump oil in the spring and fall of each year� Well pumps are <br />annually inspected by a well contractor to ensure proper operation� <br />Annual well functions inspected include voltage, flow rate, vibration, <br />water level, and other maintenance issues� In addition, pumps are <br />pulled and serviced, rebuilt, or replaced as necessary every seven <br />years� <br />The water distribution system components are inspected and replaced <br />when appropriate as part of the City’s annual street reconstruction <br />projects. Fire hydrants are flushed twice a year and gate valves are <br />periodically exercised to confirm they are in proper working order and <br />to identify issues within the distribution system� Storage facilities are <br />cleaned and inspected every five years and repainted as necessary.