My WebLink
|
Help
|
About
|
Sign Out
Home
2019 ANNUAL BUS TOUR
Hugo
>
Misc
>
Bus Tour Packets
>
2019 ANNUAL BUS TOUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:46:04 PM
Creation date
10/7/2019 11:32:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K:\013980-000\Cad\Exhibits\013980-000 Sunset Lake Park Master PlanScale in Feet <br />60’0’30’15’ <br />Hugo, Minnesota September 9, 2019 | WSB Project number: 013980-000 <br />Sunset Lake Park - Concept 2 <br />SUNSET LAKE <br />125 <br />T <br />H <br /> <br />S <br />T <br /> <br />NHOMESTEAD DR <br />FISHING PIER <br />DROP OFF AREAWINTER ACCESS <br />CANOE STORAGE RACK <br />EXISTING VEGETATIVE BUFFER <br />PORTABLE RESTROOM <br />TURN LANE <br />FUTURE TRAIL <br />PARKING (10 STALLS) <br />STORMWATER TREATMENT <br />APPROX. LOCATION OF EXISTING WATER OUTFLOW <br />PHASED PICNIC AREA <br />FISHING BOULDER OUTCROPPING (TYP.) <br />MOWED TRAIL <br />FUTURE TRAIL <br />CANOE / KAYAK STORAGE RACK FISHING BOULDER OUTCROPPING <br />TURFFUTURE SHELTER <br />NATIVE GRASS <br />CONCEPT 2:• Drop off and unloading area• Vehicular access point off of Homestead <br />Dr and 125th St• A looped internal trail could connect to a <br />future trail along 125th St N
The URL can be used to link to this page
Your browser does not support the video tag.