My WebLink
|
Help
|
About
|
Sign Out
Home
2019.11.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.11.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:26:36 PM
Creation date
11/15/2019 9:32:53 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/18/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14669 Fitzgerald Avenue North • Hugo, MN 55038 <br />PRESENT: Haas, Klein, Miron, Petryk, Weidt <br />ABSENT: None <br />Minutes <br />HUGO CITY COUNCIL MEETING <br />PUBLIC WORKS FACILITY STUDY MEETING <br />TUESDAY, NOVEMBER 12, 2019 <br />5:00 P.M. <br />STAFF PRESENT: City Administrator Bryan Bear, Public Works Director Scot Anderson, <br />Public Works Lead Worker Mike Loeffler, Finance Director Ron Otkin, Finance Coordinator <br />Anna Wobse <br />The Hugo City Council scheduled this meeting to discuss the space needs study for the Public <br />Works Department. The study was done by Oertel Architects, Ltd., and Architect Jeff Oertel <br />was present who reported on the findings of the space need study and presented options for an <br />expansion of the current building. There was discussion on the possible lease of the current <br />building and construction of a new Public Works facility on the City owned property known as <br />Irish Avenue Park. There was a consensus to have Oertel Architects prepare a scope of services <br />proposal as Part 2 of the planning for the Public Works facility. <br />Respectfully Submitted, <br />Anna Wobse <br />Finance Coordinator <br />
The URL can be used to link to this page
Your browser does not support the video tag.