Laserfiche WebLink
wu <br />`White Bear Lake <br />e • Area Schools <br />Transportation and Maintenance Facility Overview <br />The functions that would be located on this site include: <br />Independent School District #624 <br />White Bear Lake Area Schools <br />2019 Referendum Projects <br />Revised November 14, 2019 <br />• Bus and van/shuttle parking (approx. 75 vehicles total of varying sizes, outdoors) <br />• Building space for offices for transportation and maintenance staff (approx. 5,000 SF) <br />• Building space to support maintenance of buses and other vehicles (approx. 10,000 SF), including <br />vehicle lifts, parts/tools/work areas and storage <br />• Fueling for vehicles (diesel and unleaded) <br />• Parking for staff and drivers (approx. 100 stalls) <br />Given that these uses require parking, maintenance/vehicle service, and fueling, the District proposes that <br />these uses would be best characterized as an Essential Public Service, which is a permitted use. The District <br />proposes that the vehicleparking be located outside, which exceeds the total area of proposed buildings and <br />requires a Conditional Use Permit. <br />The vehicles proposed to be stored at and operated out of this site are used for specific transportation needs, <br />including special education transportation vehicles and buses that serve to meet the needs of field trips / <br />activities. Buses that are used for standard bus routes are provided through a contract with First Student and <br />are stored on a separate site (not proposed to be relocated to this site as a part of this request). As a result, <br />on average, about 10 buses would begin routes at the start of the day (6:30 AM), with other vehicles having <br />staggered start times to their routes. Some vehicles serve as backup / spare vehicles, and as such would not <br />always leave the site unless another vehicle was not in service. Approximately 60% of the vehicles proposed to <br />be stored at this site are diesel and the other 40% use unleaded fuel. <br />Sketch Plan Narrative <br />The attached sketch plan represents a conceptual layout for the site, locating all intended elements as well as <br />preliminary engineering information, including areas for stormwater management, connection to city utilities <br />(per documents provided by the City of Hugo), and conceptual grading/topography. Below is a table of <br />allowable areas and proposed areas. <br />Total Site Area <br />300,639 SF <br />Allowable Impervious Area <br />240,51 1 SF (80%) <br />Impervious Area shown on Sketch Plan <br />196,000 SF <br />Proposed Building Area <br />15,000 SF <br />Proposed Exterior Storage <br />45,957 SF <br />Allowable Exterior Storage <br />15,000 SF <br />Additional Exterior Storage (CUP) <br />31,347 SF <br />Page 3 <br />