My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 11.21.19
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2019 PC Packets
>
PC Packet 11.21.19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:09:40 AM
Creation date
12/19/2019 11:08:28 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/21/2019
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sketch Plan Review and Exterior Storage CUP <br />Page 2 <br />B. Natural Characteristics of Site <br />The property is currently vacant and consists of a mixture of open and wooded land. The site has <br />a general slope downward from east to west. <br />C. BACKGROUND <br />The proposed use of the property will be a transportation facility for the White Bear Lake Area <br />School District and is a permitted use as an essential public service. As the District is preparing <br />for an increase of over 2,000 students in the next ten year, they are planning to maximize the use <br />of the District's existing buildings while expanding other facilities. The District is proposing to <br />relocate the District's maintenance and transportation operations to a new site in Hugo with <br />appropriate services and support operations as the current site has operational challenges and <br />limitations. <br />The proposed facility in Hugo will include: <br />• Bus and van/shuttle parking of approximately 75 varying vehicles; <br />• Building space for offices for transportation and maintenance staff (approximately 5,000 <br />square feet); <br />• Building space to perform vehicle maintenance operations (approximately 10,000 square <br />feet); <br />• Fueling for vehicles; and <br />• Parking for staff. <br />The district is proposing that the vehicle parking be located outside as exterior storage, which <br />exceeds the total square footage of the proposed building and therefore requires approval of a <br />conditional use permit. The vehicles proposed to be stored on site are for specific transportation <br />needs such as special education transportation vehicles and buses for field trips. The buses that <br />are used for standard bus routes will be stored at a different location. As a result, on average, ten <br />buses would begin routes at around 6:30 AM, with other vehicles having staggered start times to <br />their routes. Some vehicles stored at the proposed site will be spare vehicles for backup <br />purposes. <br />3. SKETCH PLAN: <br />Lot Size <br />The minimum lot size in the General Industrial (I-3) zoning district is 15,000 square feet. The <br />proposed parcel is 300,639 square feet or 7.06 acres. <br />Setbacks <br />The applicant will be required to meet all setback requirements for the General Industrial zoning <br />district. The setbacks are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.