My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 09.12.19
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2019 PC Packets
>
PC Packet 09.12.19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:25:48 AM
Creation date
12/19/2019 11:23:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
9/12/2019
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. <br />0 <br />U <br />c� <br />Z <br />W <br />CO <br />U) <br />0 <br />00 <br />00 <br />N <br />ID <br />0 <br />0 <br />N <br />W <br />U) <br />W <br />W <br />W <br />00 <br />wsb <br />August 14, 2019 <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Hugo Mini Storage Revised Final Plat/Civil Plan Review <br />WSB Project No. 03288-110 <br />Dear Ms. Juba: <br />We have reviewed the revised civil plan submittal for the Hugo Mini Storage Phase II Site located <br />on the east side of Highway 61 north of 152nd Street. We have reviewed the following information <br />related to this application: <br />Hugo Mini Storage Phase II Civil Plans, prepared by Advanced Engineering Concepts, <br />dated July 12, 2019 <br />Hugo Climate Control Storage - Preliminary Site Plan, prepared by CNH Architects, dated <br />June 27, 2019 <br />Based on the review of the documents, we offer the following comments related to this <br />application: <br />Civil Plans <br />We are working directly with the applicant's engineer to finalize the grading, site, and utility <br />plans, specifications, and details. We will issue the drainage permit and construction plan <br />approvals once the remaining issues identified in the redline comments have been <br />addressed. We do not expect that any remaining plan changes will have a significant impact <br />on the plans. <br />Water service will be connected to the existing watermain on the west side of the proposed <br />building and the sanitary sewer service will be extended from the existing sanitary sewer on <br />the east side of the proposed building. <br />Stormwater Management <br />3. The applicant has submitted their Stormwater Management Plan for the site, meeting the <br />appropriate storage, rate control, treatment, and volume reduction for the overall <br />development. A stormwater pond was previously constructed to meet stormwater <br />management requirements than can accommodate the proposed changes to the site plan. <br />4. The applicant will need to provide an as -built of the constructed stormwater pond. <br />5. Submit LOMR/CLOMR application and FEMA approval for the new building. <br />From an engineering standpoint, the proposed site plan meets our requirements. <br />S:\Users\R_Juba\Rachel\DEVELOPMENT PROJECTS\Peloquin Ind. Park\Ministorage\Phase 2\Engineers Memo Gopher State Storage 081419.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.