My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 09.12.19
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2019 PC Packets
>
PC Packet 09.12.19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:25:48 AM
Creation date
12/19/2019 11:23:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
9/12/2019
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. UNDERGROUND UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS ONLY AND ARE NOT SHOWN IN <br />THEIR ENTIRETY. CONTRACTOR SHALL NOTIFY UTILITIES A MINIMUM OF 3 DAYS PRIOR TO ANY <br />EXCAVATION FOR FIELD VERIFICATION OF LOCATIONS. THE CLIENT, CITY, AND THE ENGINEER ARE <br />NOT RESPONSIBLE OR LIABLE FOR ANY DAMAGE CAUSED TO EXISTING UTILITIES. <br />2. CLEARING AND GRUBBING SHALL ONLY BE IN THOSE LOCATIONS DIRECTED BY THE ENGINEER <br />AND/OR OWNER. CONTRACTOR SHALL PROTECT ALL TREES, SHRUBS, AND CORRESPONDING <br />ROOT SYSTEMS FROM DAMAGE. ALL WORK WITH POTENTIAL IMPACT ON UN—CLEARED TREES <br />AND/OR SHRUBS SHALL BE COORDINATED WITH THE PROJECT MANAGER AND/OR OWNER. <br />3. CONTRACTOR SHALL NOT DISTURB ANY R/W IRONS. ANY REMOVAL SHALL BE APPROVED BY <br />THE ENGINEER, OTHERWISE THE CONTRACTOR SHALL BE BILLED FOR REPLACEMENT. <br />4. NO TREES OR STUMPS ARE TO BE BURIED ON SITE. CONTRACTOR IS RESPONSIBLE FOR ANY <br />PERMITS FOR DISPOSAL. <br />5. CONTRACTOR TO REPAIR AND RESTORE ANY DAMAGED OR DISTURBED AREAS OF PAVEMENT, <br />C0l <br />C0l <br />6. CO <br />CONTROL — 16263 <br />POINT # <br />TYPE <br />NORTHING <br />EASTING <br />ELEVATION <br />1 <br />NAIL <br />255057.079' <br />459782.258' <br />— — — — — — <br />4 <br />NAIL <br />255657.666' <br />459996.377' <br />5 <br />NAIL <br />255377.169' <br />459706.975' <br />BENCHMARK <br />TOP NUT ON <br />HYDRANT <br />845.77' <br />---- ------ EXISTING MAJOR CONTOUR <br />----- ----- EXISTING MINOR CONTOUR <br />EXISTING PAVEMENT <br />REMOVE EXISTING PAVEMENT <br />OEXISTING WETLANDS <br />K SAWCUT <br />�nnnnnnn� RFMOVF f.IIRR A, r[ITTFR <br />0 15 30 60 <br />22.08 <br />A <br />1=930.64 <br />PROJ. N0. <br />18037 <br />ADVANCED ENGINEERING CONCEPTS <br /># <br />^ AEC 1360 INTERNATIONAL DRIVE, SUITE 1 <br />EAU CLAIRE, NA 54701 <br />PH: 715-552-0330 <br />info* ls—aec.com <br />COPYRIGHT 2017 AEC LLC. <br />EXISTING CONDITION AND DEMOLITION PLAN <br />HUGO MINI STORAGE <br />REVISED PHASE II <br />HUGO, MN <br />DWG NAME <br />18037 T <br />EXIST <br />DATE <br />04/2019 <br />— — — — — — <br />
The URL can be used to link to this page
Your browser does not support the video tag.