Laserfiche WebLink
/ <br />/ <br />/ <br />/ <br />/ <br />a <br />/ <br />S 903{2 <br />E1899j �.1 <br />923.08 <br />H IN 0 <br />D\D, <br />i <br />I R.E.=919.3 <br />I.E.=913.3 <br />24 <br />RCP 44 - <br /><p4 <br />i`-903M <br />CB 11 INV{.T 24„RCP/ pp R.E.=918.5 <br />pp I.E.=914.0(N) <br />I.E.=913.8(S,SW) <br />pp � <br />pp <br />�p <br />I � <br />L <br />(2) 6" - 45° / <br />BENDS <br />CLEANOUT <br />RE=920.20 <br />I E=911.50 W <br />I E=911.50 S / <br />6" WATER SERVICE / <br />12"x12" TEE i <br />E=914.44 S / <br />I E=914.44 W / <br />I E=914.44 N / <br />6" - 90° BEND <br />6" GATE VALVE <br />41 LF - 6" CONNECT TO EXISTING <br />@ 2.00% / R.E,, WATER STUB <br />1.f , 09 7 i <br />"9Q <br />33 LF - 6" <br />@ 2.00% / <br />PVC <br />� <br />CLEANOUT <br />CONNECT TO EXISTING <br />RE=920.19 <br />SANITARY STUB <br />IE=910.67 N <br />EX. RE=920.12± <br />IE=910.67 E <br />// IE=910.00 W <br />1 EX. I E=909.5± S <br />\�/ 2.70 SEE DATA SHEETS <br />BENCHMARK <br />TNH EL=922.99 <br />\� /RLS <br />\� <br />42604 <br />i <br />Dp <br />PROPOSED <br />EXISTING <br />CURB & GUTTER <br />\ DD <br />STORM SEWER <br />CBMH <br />\ Dp ____ <br />/ 4 �OE <br />PV l <br />M <br />OE <br />FO 922. \`4` \D �I 26 Sq/V \ \ l o l <br />\S` 12» DlP SEWER l <br />\ of �`CL.52 / <br />OE� /�� TER Al D I / <br />S MH BURIED OUND MARKII MH <br />/ o / <br />, <br />0C\ ° \ 0 4 12604 \ <br />c� <br />\OC <br />o c� <br />, <br />\0k OE ° RLS <br />\ of 4 / 42604 <br />OC o <br />/ <br />M C <br />qN o o <br />Ro,4D ° <br />OR, <br />, <br />� � o <br />, <br />, <br />THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL . THIS QUALITY LEVEL WAS DETERMINED j <br />ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING 7I \ <br />SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING <br />UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE / <br />CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY / \ <br />HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). / <br />IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, / \ <br />INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. / <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED <br />IMPROVEMENTS SHOWN ON THE PLANS. <br />/ <br />/ <br />Sep 27, 2019 - 2:51pm - User:afeldberg L:\PROJECTS\21797\CAD\Civil\Sheets\21797-C5-UTIL.dwg <br />- LEGEND <br />NUMBER <br />PROPOSED <br />EXISTING <br />CURB & GUTTER <br />CBMH <br />STORM SEWER <br />CBMH <br />DD <br />INSULATED <br />CBMH <br />NEENAH R -3067-V <br />STORM SEWER <br />CBMH <br />NEENAH R -3067-V <br />SANITARY SEWER <br />► <br />D <br />FORCEMAIN (SAN.) <br />LS / FM / <br />Q- D FM D <br />WATERMAIN <br />104 1 <br />>i I <br />EASEMENT <br />- - - - - - - <br />-- - - - -- <br />DRAINTILE <br />000 000 <br />DDD DDD <br />GAS LINE <br />GL <br />GI_ <br />ELECTRIC <br />UE <br />UE <br />TELEPHONE <br />UT <br />11 - <br />STORM <br />STORM SEWER STRUCTURE SCHEDULE <br />NUMBER <br />TYPE <br />CASTING* <br />EX 100 <br />CBMH <br />101 <br />CBMH <br />NEENAH R -3067-V <br />102 <br />CBMH <br />NEENAH R -3067-V <br />103 <br />CBMH <br />NEENAH R -3067-V <br />104 <br />CBMH <br />NEENAH R -3067-V <br />*INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL <br />NOTE: CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER <br />REQUIRED FOR EACH STORM SEWER STRUCTURE. <br />-UTILITY CONSTRUCTION NOTES <br />1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE <br />"STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF <br />MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE <br />SPECIFICATIONS. <br />1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS. <br />1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO <br />OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE <br />CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF <br />SERVICE TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR. <br />1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10 -FEET <br />BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN <br />(BUILDING, STORM AND SANITARY) CROSSINGS. <br />2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. <br />2.1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. <br />2.2. ALL SANITARY SEWER TO BE PVC SDR -35, UNLESS NOTED OTHERWISE. <br />2.2.1. ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO <br />ASTM D2665. <br />2.3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE. <br />2.3.1. ALL WATERMAIN TO HAVE 7.5 -FEET OF COVER OVER TOP OF WATERMAIN. <br />2.3.2. PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN <br />JOINTS PER CITY STANDARDS. <br />2.4. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT <br />GASKETS, UNLESS NOTED OTHERWISE. <br />2.4.1. ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40 <br />CONFORMING TO ASTM D2665. <br />2.5. RIP RAP SHALL BE Mn/DOT CLASS 3. <br />3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH <br />MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. <br />4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE <br />TO BE INSULATED FROM BUILDING TO POINT WHERE 5 -FEET OF COVER IS ACHIEVED. <br />5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT <br />PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD <br />SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE <br />CONSTRUCTION PHASES OF THIS PROJECT. <br />6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION <br />PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE <br />JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. <br />THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. <br />THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF <br />CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF <br />CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. <br />7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION <br />SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED <br />BENEATH THE SOD. <br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES <br />SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE <br />MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO <br />APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. <br />9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE <br />PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE <br />SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF <br />THE SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS <br />TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. <br />A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: <br />COMPANY: <br />ADDRESS: <br />PHONE: <br />DATED: <br />CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. <br />10. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN <br />STRUCTURES TO CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING <br />REVIEW. <br />11. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR <br />EACH STORM SEWER STRUCTURE. <br />- KEY NOTES <br />A. LOWER WATERMAIN AS NECESSARY TO PROVIDE MINIMUM 18" OF SEPARATION FROM SEWER. <br />NORTH <br />0 20 40 <br />SCALE IN FEET <br />Wsambatek <br />www.sambatek.com <br />12800 Whitewater Drive, Suite 300 <br />Minnetonka, MN 55343 <br />763.476.6010 telephone <br />763.476.8532 facsimile <br />Engineering I Surveying I Planning I Environmental <br />Client <br />LA MACCHIA <br />GROUP <br />157 NORTH MILWAUKEE STREET, <br />MILWAUKEE, WI 53202 <br />Project <br />HEARTLAND <br />CREDIT UNION <br />Location <br />HUGO, MN <br />Certification <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />BRADY D. BUSSELMAN <br />Registration No. 44579 Date: 09/27/2019 <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />Summary <br />Designed: Drawn: SRW <br />Approved: Book / Page: <br />Phase: PRELIMINARY Initial Issued: 09/27/2019 <br />Revision History <br />No. Date By Submittal / Revision <br />Sheet Title <br />UTILITY PLAN <br />Sheet No. Revision <br />C5.01 <br />Project No. 21797 <br />