Laserfiche WebLink
30" RADIUS MULCH RING <br />1.SXA <br />MIN. <br />UNDISTURBED <br />SUBGRADE 1 <br />1 <br />aim <br />DIG PLANTING PIT 4" TO 6" <br />DEEPER THAN ROOT BALL <br />NOTE: <br />CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB <br />POSITION THROUGHOUTTHE WARRANTY PERIOD. IF <br />STAKING IS REQUIRED BY SITE CONDITIONS, <br />CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1" <br />WEBBING AROUND TRUNK OF TREE (NO WIRE OR <br />CABLING TO BE USED) <br />WRAP TREE TRUNKS PER NOTES. <br />PROVIDE & INSTALL RODENT PROTECTION <br />1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR <br />GREATER X 24" HT.. STAKE IN PLACE <br />INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF <br />THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM <br />TOP OF ROOT BALLTO EXPOSE 1ST 1/2" OR LARGER MAIN <br />ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN <br />ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT <br />COVER TOP OF ROOT BALL WITH SOIL. <br />INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH. <br />PLACE NO MULCH IN CONTACT WITH TREE TRUNK <br />REMOVE BURLAP, TWINE, ROPE AND WIRE FROM <br />TOP HALF OF ROOT BALL <br />BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF <br />ROOT BALL <br />- EDGE CONDITION VARIES <br />PLACE ROOT BALL ON UNDISTURBED OR <br />COMPACTED SOIL <br />_ SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND <br />TO BIND WITH PREPARED SOIL <br />- PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85% <br />OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698 <br />TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT <br />PRESSURE SO THAT ROOT BALL DOES NOT SHIFT <br />TREE PLANTING DETAIL <br />1/4" = 1'-0" <br />ROCK MULCH <br />1" = 1'-0" <br />Sep 27, 2019 - 2:57pm - User:afeldberg L:\PROJECTS\21797\CAD\Civil\Sheets\21797-Ll-LSCP.dwg <br />ANUJI /irL KU( -K - JLL IVU I L_') <br />:OMMERCIAL WEED BARRIER <br />INISH GRADE - SLOPE TO DRAIN <br />EDGER <br />=D4RFr1 CI IRl-.RAr1F <br />2' <br />L1.02 <br />INSTALL 3" LAYER OF MULCH, DO NOT PLACE IN <br />CONTACT W/ SHRUB STEM <br />APPLY PRE -EMERGENT HERBICIDE <br />EDGE CONDITION VARIES <br />EDGER, REFER TO PLAN AND SPECIFICATION <br />LOOSEN ROOTS OF CONTAINER GROWN PLANTS <br />EXCAVATE PLANT BED MIN. 4" DEEPER THAN <br />ROOT BALL HT. <br />SCARIFY SIDES AND BOTTOM OF PLANTING BED <br />WITH SPADE <br />PLANTING SOIL. REFER TO SPECIFICATIONS <br />UNDISTURBED SUBGRADE <br />SHRUB PLANTING DETAIL <br />3/8" = V-0 <br />PREPARE SOIL FOR <br />- it rn nr - <br />NOTE: <br />REFER TO EXTERIOR PLANTING SPECIFICATION <br />INSTALL 3" LAYER OF MULCH. DO NOT <br />PLACE IN CONTACT WITH PLANT <br />EDGE CONDITION VARIES <br />EDGER, REFER TO PLAN AND SPECIFICATION <br />LOOSEN ROOTS OF CONTAINER GROWN PLANTS <br />PLANTING SOIL, REFER TO SPECIFICATIONS <br />SCARIFY SIDES AND BOTTOM OF PLANTING BED WITH SPADE <br />UNDISTURBED SUBGRADE <br />PERENNIAL PLANTING DETAIL <br />1/2" = 114 <br />NOTES <br />K A I i i r I i <br />STEEL EDGER <br />1 1/2" = V-0" <br />GENERAL NOTES: <br />1. THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING <br />CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK. <br />2. THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE <br />ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, <br />REGULATIONS, AND PERMITS GOVERNING THE WORK. <br />4. THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND <br />SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR <br />REPLACED AT NO ADDITIONAL COST TO THE OWNER. <br />5. LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR <br />PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY <br />THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION. <br />6. THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND <br />PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. <br />7. THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT <br />NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE <br />CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO <br />BEGINNING OF WORK. <br />8. THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST. <br />QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. <br />CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. <br />9. THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES. <br />10. EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL <br />CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY <br />FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING. <br />11. LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED. <br />12. CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION. <br />PLANTING NOTES: <br />1. NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN <br />COMPLETED IN THE IMMEDIATE AREA. <br />2. A GRANULAR PRE -EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE <br />MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION. <br />3. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," <br />ANSI -Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL <br />CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. <br />4. OVERSTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACES. <br />5. ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE <br />CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND. <br />6. PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS. <br />7. ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS <br />SPECIFIED. <br />8. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED <br />UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. <br />9. NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY <br />THE LANDSCAPE ARCHITECT. <br />10. ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT <br />SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE <br />LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR <br />TO INSTALLATION. <br />11. ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED. <br />12. MULCH: SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER <br />DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR TREES, UNLESS INDICATED AS <br />ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT PRIOR TO DELIVERY <br />ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF INSTALLATION. USE 3" FOR SHRUB BEDS, <br />TREE RINGS, AND 3" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED. <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO <br />COMPLETE THE WORK SHOWN ON THE PLAN. <br />14. USE ANTI -DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF <br />AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL <br />EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY <br />PERIOD. <br />15. WRAP ALL SMOOTH -BARKED DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO DECEMBER 1 AND <br />REMOVE WRAPPING AFTER MAY 1. TREE WRAPPING MATERIAL SHALL BE WHITE TWO -WALLED <br />PLASTIC SHEETING APPLIED FROM TRUNK FLARE TO THE FIRST BRANCH. <br />16. ALL DECIDUOUS, PINE, AND LARCH PLANTINGS SHALL RECEIVE RODENT PROTECTION PER MNDOT <br />2571.31.2 <br />17. PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM <br />CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING <br />VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B <br />SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES, <br />CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5 <br />AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS <br />INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND <br />ROTO -TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED <br />ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT <br />MAINTAINED IN THIS MANNER WILL BE REJECTED. <br />18. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT EACH EXCAVATED TREE AND SHRUB PIT <br />WILL PERCOLATE PRIOR TO INSTALLING PLANTING MEDIUM AND PLANTS. THE CONTRACTOR <br />SHALL FILL THE BOTTOM OF SELECTED HOLES WITH SIX INCHES OF WATER AND CONFIRM THAT <br />THIS WATER WILL PERCOLATE WITHIN A 24-HOUR PERIOD. IF THE SOIL AT A GIVEN AREA DOES <br />NOT DRAIN PROPERLY, A PVC DRAIN OR GRAVEL SUMP SHALL BE INSTALLED OR THE PLANTING <br />SHALL BE RELOCATED IF DIRECTED BY THE LANDSCAPE ARCHITECT. <br />19. ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 - <br />NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF <br />REPLACEMENT INCLUDING LABOR AND PLANTS. <br />20. CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED <br />EEL EDGER (BLACK) W/ STAKE <br />FINISHED GRADE AND EDGE <br />CONDITION VARIES - SEE PLAN <br />DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN <br />ADVANCE OF BEGINNING PLANT INSTALLATION. <br />21. SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECTTO PLANT IN <br />OFF-SEASONS ENTIRELY AT HIS/HER RISK. <br />21.1. POTTED PLANTS: 4/1 - 6/1; 9/21 - 11/1 <br />21.2. DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1 <br />21.3. EVERGREEN POTTED PLANTS: 4/1 - 6/1; 9/21-11/1 <br />21.4. EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1 <br />21.5. TURF/LAWN SEEDING: 4/1 - 6/1; 7/20 - 9/20 <br />21.6. NATIVE MIX SEEDING: 4/15 - 7/20; 9/20-10/20 <br />22. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. <br />PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE <br />PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE <br />OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING, <br />REMOVAL OF DEAD MATERIALS, RE -SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN <br />A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE <br />RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR <br />KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD. <br />23. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL <br />ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH <br />MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND <br />SPECIFICATIONS. <br />24. WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS <br />ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY <br />INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR <br />TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY <br />ARRANGEMENTS FOR WATER. <br />TURF NOTES: <br />TURF ESTABLISHMENT SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE PROVISIONS <br />OF THE MN/DOT 2105 AND 2575 EXCEPT AS MODIFIED BELOW: <br />1. ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE 4" OF TOPSOIL PRIOR TO <br />INSTALLING SOD. TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL, <br />AND TRASH, AND SHALL BE FREE OF STONES LARGER THAN 1 2" INCHES IN ANY DIMENSION. <br />2. WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW <br />SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. <br />3. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON <br />SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY. <br />4. TURF ON ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED BY SEEDING, <br />MULCHING AND FERTILIZING. SEED MIXTURE NO.25-151 WILL BE PLACED AT THE RATE OF 120 <br />POUNDS PER ACRE. <br />5. ALL DISTURBED AREAS TO BE TURF SEEDED, ARE TO RECEIVE 4" TOP SOIL, SEED, MULCH, AND <br />WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN <br />DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. <br />6. ALL DISTURBED AREAS TO RECEIVE NATIVE SEED, ARE TO RECEIVE PLANTING SOIL, SEED, MULCH, <br />AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR <br />IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. <br />GENERAL TREE SPECIFICATIONS: <br />1. ALL STREET AND PARKING LOT TREES SHALL BE LIMBED UP TO THE FOLLOWING HEIGHTS: <br />1.1. 2" CAL. TREES: LOWEST BRANCH 6' HT. <br />1.2. 3" CAL.+TREES: LOWEST BRANCH 7' HT. <br />2. TREE CANOPY WIDTH SHALL BE RELATIVE TO HEIGHT/CALIPER OF TREE AND TYPE OF TREE. <br />2.1. 1" CALIPER/6-8' HT: 3-4' WIDTH MIN. <br />2.2. 2" CALIPER/12-14' HT: 4-5' WIDTH MIN. <br />2.3. 3" CALIPER/14-16' HT: 6-7' WIDTH MIN. <br />3. CANOPY TREES SHALL NOT HAVE CO -DOMINATE LEADERS IN LOWER HALF OF TREE CROWN. <br />4. ALL TREES SHALL HAVE SYMMETRICAL OR BALANCED BRANCHING ON ALL SIDES OF THE TREE. <br />5. TREES SHALL NOT BE TIPPED PRUNED. <br />6. TREES SHALL BE FREE OF PHYSICAL DAMAGE FROM SHIPPING AND HANDLING. DAMAGED TREES <br />SHALL BE REJECTED. <br />7. SUMMER DUG TREES SHALL HAVE ROOTBALL SIZE INCREASED BY 20% <br />8. TREES WHICH EXCEED RECOMMENDED CALIPER TO HEIGHT RELATIONSHIP SHALL BE REJECTED. <br />IRRIGATION NOTES: <br />1. IRRIGATION SYSTEM TO BE DESIGN/BUILD. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR <br />APPROVAL OF SYSTEM LAYOUT PRIOR TO INSTALLATION. <br />2. ALL SOD TO RECEIVE SPRAY OR ROTOR IRRIGATION HEADS WITH MINIMUM DESIGN OF 1" <br />IRRIGATION PER WEEK. <br />3. ALL PLANT BEDS TO RECEIVE DRIP LINE IRRIGATION, WITH A MINIMUM DESIGN OF .25" <br />IRRIGATION PER WEEK. <br />4. CONTRACTOR TO INSTALL A TOTAL OF 4 QUICK COUPLERS AT THE CORNERS OF THE PROPERTY. <br />A 2.5" TYPE K SOURCE PIPE IS PROVIDED BY MECHANICAL. <br />Wsambatek <br />www.sambatek.com <br />12800 Whitewater Drive, Suite 300 <br />Minnetonka, MN 55343 <br />763.476.6010 telephone <br />763.476.8532 facsimile <br />Engineering I Surveying I Planning I Environmental <br />Client <br />LA MACCHIA <br />GROUP <br />157 NORTH MILWAUKEE STREET, <br />MILWAUKEE, WI 53202 <br />Project <br />HEARTLAND <br />CREDIT UNION <br />Location <br />HUGO, MN <br />Certification <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />BRADY D. BUSSELMAN <br />Registration No. 44579 Date: 09/27/2019 <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />Summary <br />Designed: Drawn: JRW <br />Approved: Book / Page: <br />Phase: PRELIMINARY Initial Issued: 09/27/2019 <br />Revision History <br />No. Date By Submittal / Revision <br />Sheet Title <br />LANDSCAPE <br />DETAILS AND <br />NOTES <br />Sheet No. Revision <br />L1.02 <br />Project No. 21797 <br />