My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 10.10.19
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2019 PC Packets
>
PC Packet 10.10.19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:32:04 AM
Creation date
12/19/2019 11:25:59 AM
Metadata
Fields
Template:
Commissions
Meeting Date
10/10/2019
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 10 <br />wsb <br />October 2, 2019 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan/PUD Review <br />Heartland Credit Union <br />WSB Project No. 14686-000 <br />Dear Ms. Juba: <br />We have reviewed the Site Plan/PUD submittal for the above -referenced project. We have <br />reviewed the following plans related to this particular request: <br />• PUD/ Site Plans, prepared by Sambatek, dated 8/22/19 <br />• Preliminary Stormwater Management Plan, prepared by Sambatek, dated 8/22/19 <br />• Stormwater Design Worksheet, prepared by Sambatek, dated 8/22/19 <br />• Pond Exhibit, prepared by Sambatek, dated 9/12/19 <br />Based on the review of the Site Plan/PUD documents, we offer the following comments related to <br />this application: <br />Civil Plans <br />1. We are working directly with the applicant's engineer to finalize the grading, site, and utility <br />plans, specifications, and details. We will issue the drainage permit and construction plan <br />approvals once the remaining issues identified in the redline comments have been <br />addressed. We do not expect that any remaining plan changes will have a significant impact <br />on the plans. <br />2. Water service will be connected to the existing watermain stub on either the east side or <br />north side of the proposed building and the sanitary sewer service will be extended from the <br />existing sanitary sewer service stub or sanitary structure on the east side of the proposed <br />building. <br />Stormwater Management <br />3. The applicant has submitted their Stormwater Management Plan for the site, meeting the <br />appropriate storage, rate control, treatment, and volume reduction for the overall <br />development. <br />The project proposes to utilize an existing regional stormwater pond to meet volume, water <br />quality, and rate control requirements. Pond 10, located in the southeast corner of Elmcrest <br />Avenue North and Rosemary Way, was designed to include the proposed Heartland Credit <br />Union site. Survey of the pond was recently completed to ensure the capacity of the pond is <br />still adequate. The site fits within the original approved design for the overall Victor Gardens <br />development and meets the City's stormwater requirements. <br />S:\Users\R_Juba\Rachel\DEVELOPMENT PROJECTS\Victor Gardens North Village\VGNV 4th\Heartland Credit Union - Site Plan\Engineer Comments\LTR - Heartland Credit <br />Union - 10 02 19.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.