Laserfiche WebLink
STATEMENT OF ESTIMATED QUANTITIES <br />Item <br />No. <br />MN/DOT <br />Specification <br />No. <br />Description <br />Unit <br />Estimated Total <br />Quantity <br />Estimated Unit <br />Price <br />Estimated Total <br />Cost <br />OPTION 2: STREET IMPROVEMENTS <br />- WIDEN ROADWAY (26-FOOT) <br />1 <br />2021.501 <br />MOBILIZATION <br />L S <br />1 <br />$53,300.00 <br />$53,300.00 <br />2 <br />2101.524 <br />CLEARING <br />TREE <br />10 <br />$450.00 <br />$4,500.00 <br />3 <br />2101.524 <br />GRUBBING <br />TREE <br />10 <br />$450.00 <br />$4,500.00 <br />4 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />L F <br />400 <br />$3.00 <br />$1,200.00 <br />5 <br />2104.503 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />L F <br />30 <br />$6.00 <br />$180.00 <br />6 <br />2104.523 <br />SALVAGE AND REINSTALL MAILBOX <br />EACH <br />42 <br />$50.00 <br />$2,100.00 <br />7 <br />2104.503 <br />REMOVE SEWER PIPE (STORM) <br />L F <br />490 <br />$10.00 <br />$4,900.00 <br />8 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />S Y <br />200 <br />$2.50 <br />$500.00 <br />9 <br />2104.504 <br />REMOVE CONCRETE PAVEMENT <br />S Y <br />30 <br />$6.00 <br />$180.00 <br />10 <br />2106.507 <br />EXCAVATION - COMMON (P) <br />C Y <br />1530 <br />$12.00 <br />$18,360.00 <br />11 <br />2106.507 <br />EXCAVATION - SUBGRADE (P) <br />C Y <br />4500 <br />$12.00 <br />$54,000.00 <br />12 <br />2106.507 <br />SELECT GRANULAR EMBANKMENT (CV) (P) <br />C Y <br />4500 <br />$18.00 <br />$81,000.00 <br />13 <br />2105.603 <br />DITCH CLEANING <br />L F <br />200 <br />$100.00 <br />$20,000.00 <br />14 <br />2112.519 <br />SUBGRADE PREPARATION <br />ROAD STA <br />94 <br />$150.00 <br />$14,100.00 <br />15 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />20 <br />$150.00 <br />$3,000.00 <br />16 <br />2130.523 <br />WATER <br />MGAL <br />10 <br />$65.00 <br />$650.00 <br />17 <br />2211.507 <br />SHOULDERING <br />C Y <br />240 <br />$30.00 <br />$7,200.00 <br />18 <br />2211.507 <br />AGGREGATE BASE (CV) CLASS 5 <br />C Y <br />1000 <br />$28.00 <br />$28,000.00 <br />18 <br />2215.504 <br />FULL DEPTH RECLAMATION <br />S Y <br />25000 <br />$2.50 <br />$62,500.00 <br />19 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />1400 <br />$3.50 <br />$4,900.00 <br />20 <br />2331.601 <br />BITUMINOUS DRIVEWAY PAVEMENT <br />S Y <br />450 <br />$40.00 <br />$18,000.00 <br />21 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIX (2,C) <br />TON <br />2700 <br />$75.00 <br />$202,500.00 <br />22 <br />2360.509 <br />TYPE SP 12.5 WEARING COURSE MIX (2,C) <br />TON <br />4400 <br />$75.00 <br />$330,000.00 <br />23 <br />2501.502 <br />12" RC PIPE APRON <br />EACH <br />2 <br />$1,250.00 <br />$2,500.00 <br />24 <br />2501.502 <br />15" RC PIPE APRON <br />EACH <br />6 <br />$1,500.00 <br />$9,000.00 <br />25 <br />2501.502 <br />24" RC PIPE APRON <br />EACH <br />6 <br />$2,000.00 <br />$12,000.00 <br />26 <br />2501.502 <br />36" RC PIPE APRON <br />EACH <br />2 <br />$2,500.00 <br />$5,000.00 <br />27 <br />2501.602 <br />TRASH GUARD FOR 12" PIPE APRON <br />EACH <br />2 <br />$550.00 <br />$1,100.00 <br />28 <br />2501.602 <br />TRASH GUARD FOR 15" PIPE APRON <br />EACH <br />6 <br />$550.00 <br />$3,300.00 <br />29 <br />2501.602 <br />TRASH GUARD FOR 24" PIPE APRON <br />EACH <br />6 <br />$800.00 <br />$4,800.00 <br />30 <br />2501.602 <br />TRASH GUARD FOR 36" PIPE APRON <br />EACH <br />2 <br />$1,200.00 <br />$2,400.00 <br />31 <br />2503.503 <br />12" RC PIPE SEWER DES 3006 CL V <br />L F <br />45 <br />$48.00 <br />$2,160.00 <br />32 <br />2503.503 <br />15" RC PIPE SEWER DES 3006 CL V <br />L F <br />162 <br />$55.00 <br />$8,910.00 <br />33 <br />1 2503.503 <br />24" RC PIPE SEWER DES 3006 CL III <br />L F <br />222 <br />$65.00 <br />$14,430.00 <br />34 <br />2503.503 <br />36" RC PIPE SEWER DES 3006 CL III <br />L F <br />59 <br />$100.00 <br />$5,900.00 <br />35 <br />2511.507 <br />RANDOM RIPRAP CLASS III <br />C Y <br />50 <br />$200.00 <br />$10,000.00 <br />36 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />S Y <br />100 <br />$65.00 <br />$6,500.00 <br />37 <br />2540.602 <br />MAILBOX SUPPORT <br />EACH <br />2 <br />$100.00 <br />$200.00 <br />38 <br />2540.602 <br />MAILBOX (TEMPORARY) <br />EACH <br />42 <br />$50.00 <br />$2,100.00 <br />39 <br />2563.601 <br />TRAFFIC CONTROL <br />L S <br />1 <br />$10,000.00 <br />$10,000.00 <br />40 <br />2564.602 <br />SIGN PANELS TYPE SPECIAL <br />S F <br />9 <br />$75.00 <br />$675.00 <br />41 <br />2564.602 <br />DRIVER FEEDBACK SIGN <br />EACH <br />4 <br />$12,500.00 <br />$50,000.00 <br />42 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />LIN FT <br />500 <br />$3.50 <br />$1,750.00 <br />43 <br />2573.501 <br />STABLIZED CONSTRUCTION EXIT <br />L S <br />1 <br />$2,500.00 <br />$2,500.00 <br />44 <br />2575.508 <br />SEED MIX TYPE 25-131 <br />LBS <br />500 <br />$3.50 <br />$1,750.00 <br />45 <br />2575.508 <br />HYDRAULIC MULCH MATRIX <br />POUND <br />5300 <br />$2.00 <br />$10,600.00 <br />46 <br />2575.605 <br />SEEDING (INCL. TOPSOIL & FERT) <br />ACRE <br />2.1 <br />$5,000.00 <br />$10,500.00 <br />47 <br />2582.503 <br />4" SOLID LINE MULTI COMP <br />L F <br />1390 <br />$1.25 <br />$1,737.50 <br />48 <br />2582.503 <br />4" DBLE SOLID LINE MULTI COMP <br />L F <br />7260 <br />$1.75 <br />$12,705.00 <br />49 <br />125TH STREET UPGRADES <br />L S <br />1 <br />$10,000.00 <br />$10,000.00 <br />TOTAL OPTION 2: SURFACE IMPROVEMENTS - WIDEN ROADWAY (26-FOOT) $1,118,087.50 <br />+ 10% CONTINGENCY $111,808.75 <br />SUBTOTAL OPTION 2: SURFACE IMPROVEMENTS - WIDEN ROADWAY (26-FOOT) $1,229,896.25 <br />+ 25% INDIRECT COSTS $307,474.06 <br />TOTAL OPTION 2: SURFACE IMPROVEMENTS - WIDEN ROADWAY (26-FOOT) $1,537,370.31 <br />K:\014873-000\Quantity\Preliminary\014560-000 OPC Feas Final 010220 2 of 2 <br />