Laserfiche WebLink
Hugo City Council Meeting Minutes for May 18, 2020 <br />Page 3 of 5 <br />Approve Agreement for Services with M Health Fairview <br />M Health Fairview will become the City's Ambulance provider on June 1, 2020. M Health <br />Fairview will provide the same medical directive and related service to the Fire Department as <br />North Memorial. Adoption of the Consent Agenda approved the agreement for M Health <br />Fairview Medical Directive Services. <br />Approve Change Order for 1301h Street Project <br />As part of the design of the 1301h Street Improvement Project, staff evaluated a number of ways <br />access to the Beaver Ponds neighborhood could be maintained from both 130th Street and 125th <br />Street. Access to 130th Street was viewed to be important, as the intersection of 125th Street and <br />TH 61 did not have a traffic signal. Access to 130th Street during construction would allow <br />access to a signalized intersection at TH 61 and 130th Street and Egg Lake Road at various stages <br />of construction. City Engineer Mark Erichson reviewed several options that were evaluated by <br />staff, and he recommended the option to utilize 1291h Street, which is a private road, based on <br />lower costs and better traffic flow. While evaluating costs for this option, staff identified the <br />potential need for a mill and overlay on 1291h Street should any damage occur due to the <br />increased use of this private road. Even with this potential cost, Erichson said this option was <br />deemed to be the least expensive and provided the best access. He explained that an agreement <br />had been reached with the home owners association to utilize 129th Street for access. Prior to <br />construction starting, staff had taken photos and video of the condition of 129th Street to <br />document the pre -construction condition of the roadway. This spring, staff reviewed the <br />conditions of 129th Street and noticed some additional cracking in the roadway that warrants <br />completing a mill and overlay improvement project on 129th Street. <br />Petryk made motion, Miron seconded, to approve Change Order No. 1 in the amount of <br />$28,474.20 for the mill and overlay of 129th Street. <br />Roll call vote —all ayes. Motion carried. <br />Presentation of the 2020-2024 Capital Improvement Program <br />City Administrator talked to Council about the draft 2020-2040 Capital Improvement Plan <br />prepared by Finance Director Ron Otkin with the assistance of other staff members. An updated <br />CIP was required if the City Council wished to issue Capital Improvement Bonds. The document <br />included streets, a new Public Works facility, and the Lions Park Improvement Project. The <br />Planning Commission would need to determine if the CIP was consistent with the 2040 <br />Comprehensive Plan. In preparing the CIP, the flat tax rate had been assumed. The CIP could <br />change if the rate was lowered or projects were eliminated or downsized. Also, the County's <br />assessment report was out, and the finance director had estimated the 2021 tax capacity increased <br />by nearly 5%. This would result in a $49 increase in taxes for the median valued house in Hugo. <br />Bear reviewed the street projects included in the draft CIP document. He explained the <br />downtown street project was moved ahead to 2021 to coincide with the Lions Park project. The <br />street project was now estimated at $2,820,000, which had been reduced by a change in the <br />scope of the project. 145th Street and Finale Avenue were removed, and a short section of 147th <br />street was added. Those streets and the cost of on -street parking improvements could be <br />