My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2019-__ <br />Page 2 <br /> <br /> <br />b. A revised lighting plan to show compliance with the ordinance requirement that candle <br />foot measure not exceed ½ candle foot at the property line. The applicant must also <br />provide lighting fixture cut sheets and pole details to ensure cut-off fixture and pole height <br />requirements are met. <br /> <br />c. An irrigation plan must be provided. <br /> <br />9. The applicant must apply for a sign permit with details ensuring compliance with ordinance <br />requirements. <br /> <br />10. Prior to issuance of building permits: <br /> <br />a. The developer shall enter into a development agreement, shall agree to complete all <br />improvements, and pay all fees as required by the agreement. <br /> <br />b. A lot combination for Parcel A and Parcel B must be filed at Washington County. <br /> <br />c. The proper drainage and utility easements must be dedicated over the lot after the <br />easement vacation is approved. This must include a drainage and utility easement over <br />the entire stormwater pond that connects to the existing storm water easement on the <br />property directly north of the Parcel B. The proposed easement to access the <br />stormwater system within the TGK site will be provided to the City. <br /> <br />d. A street easement for the additional 39 feet of Highway 61 right-of-way must be dedicated <br />over the lot and deeded to the City. <br /> <br />e. No access will be allowed onto U.S. Highway 61 from the site or from Parcel C to the <br />south. The applicant is responsible for ensuring that these sites are provided with access <br />through cross access agreements. The following documents must be assembled and <br />provided to the City of Hugo. <br />i. Deed from the landowner to the City of Hugo for the Highway 61 street easement. <br />ii. Cross access agreements between the affected property owners for access over <br />the property to the north (Apple Academy and TGK Automotive). <br />iii. Cross access agreements between the affected property owners for access over <br />the project site (Apple Academy and Parcel C). <br /> <br />f. Cross Access easements must be reviewed and approved by the City Attorney. Upon <br />City approval, the applicant shall file these documents at Washington County. <br /> <br />g. All easements must be provided in recordable form. <br /> <br />h. Architectural elevations must comply with Commercial and Industrial Design Guidelines. <br /> <br />i. All four façades of the structure must be treated equally and must contain doors, <br />windows and the mix of materials shown by the applicant. <br />ii. All façades must include a minimum of two materials: an engineered wood siding <br />and a cultured stone veneer. The engineered wood siding must be applied to the <br />façade in a variety of colors and style types (shake, traditional lap and board and <br />batten). <br />iii. The applicant will work with staff to finalize the design and color palette.
The URL can be used to link to this page
Your browser does not support the video tag.