My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Apple Academy 16 <br /> <br />b. A lot combination for Parcel A and Parcel B must be filed at Washington County. <br /> <br />c. The proper drainage and utility easements must be dedicated over the lot after the <br />easement vacation is approved. This must include a drainage and utility easement <br />over the entire stormwater pond that connects to the existing storm water easement on <br />the property directly north of the Parcel B. The proposed easement to access the <br />stormwater system within the TGK site will be provided to the City. <br /> <br />d. A street easement for the additional 39 feet of Highway 61 right-of-way must be <br />dedicated over the lot and deeded to the City. <br /> <br />e. No access will be allowed onto U.S. Highway 61 from the site or from Parcel C to the <br />south. The applicant is responsible for ensuring that these sites are provided with access <br />through cross access agreements. The following documents must be assembled and <br />provided to the City of Hugo. <br />i. Deed from the landowner to the City of Hugo for the Highway 61 street <br />easement. <br />ii. Cross access agreements between the affected property owners for access over <br />the property to the north (Apple Academy and TGK Automotive). <br />iii. Cross access agreements between the affected property owners for access over <br />the project site (Apple Academy and Parcel C). <br /> <br />f. Cross Access easements must be reviewed and approved by the City Attorney. Upon <br />City approval, the applicant shall file these documents at Washington County. <br /> <br />g. All easements must be provided in recordable form. <br /> <br />h. Architectural elevations must comply with Commercial and Industrial Design <br />Guidelines. <br /> <br />i. All four façades of the structure must be treated equally and must contain doors, <br />windows and the mix of materials shown by the applicant. <br />ii. All façades must include a minimum of two materials: an engineered wood <br />siding and a cultured stone veneer. The engineered wood siding must be <br />applied to the façade in a variety of colors and style types (shake, traditional <br />lap and board and batten). <br />iii. The applicant will work with staff to finalize the design and color palette. <br /> <br />i. The applicant must comply with the conditions from Minnesota Department of <br />Transportation letter dated May 8, 2019.
The URL can be used to link to this page
Your browser does not support the video tag.