Laserfiche WebLink
05.01.2019SITE PLANNING& ENGINEERINGSUITE 1106776 LAKE DRIVELINO LAKES, MN 55014PHONE: (651) 361-8210FAX: (651) 361-8701STORM WATER POLLUTION <br />PREVENTION PLANENGINEERING, INC.PLOWEC6.1HUGO, MINNESOTA <br />LIC. NO.DATE: <br />I hereby certify that this plan was prepared by me <br />or under my direct supervision and that I am a <br />duly Licensed Professional Engineer under the <br />laws of the State of Minnesota.ORIGINAL DATE:PROJ. NO.DESIGN BY:CHCKD BY:DRAWN BY:A.AC.W.P.19-1828A.Q.AFEBRUARY 09, 2019PREPARED FOR:PRE <br />L <br />I <br />M <br />I <br />N <br />A <br />R <br />YCLASSICCONSTRUCTIONCHARLES W. PLOWE <br />18227STORM WATER POLLUTION PREVENTION PLANAPPLE ACADEMY DAY CAREREVISION DESCRIPTIONDATE <br />S:\plowe\cad\19proj\19-1828 APPLE ACADEMY DAY CARE\19-1828 CAD\19-1828 BASE 8 (AA).dwg 5/1/2019 4.1 TERMINATION OF COVERAGE. [MINN. R. 7090]4.2 PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ALL TERMINATION CONDITIONS LISTED IN SECTION 13 ARECOMPLETE. [MINN. R. 7090]4.3 PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER SELLING OR OTHERWISE LEGALLY TRANSFERRING THE ENTIRESITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS (E.G., STREET SWEEPING) AND STORMWATER INFRASTRUCTURE FINALCLEAN OUT, OR TRANSFERRING PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEES' COVERAGE UNDER THIS PERMITTERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT. [MINN. R. 7090]4.4 PERMITTEES MAY TERMINATE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL CONSTRUCTION ACTIVITY IF THEY MEETALL OF THE FOLLOWING CONDITIONS:A. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS; ANDB. AT LEAST 90 PERCENT (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS BEEN COMPLETED ANDPERMANENT COVER HAS BEEN ESTABLISHED ON THOSE AREAS; ANDC. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; ANDD. THE SITE COMPLIES WITH ITEM 13.3 THROUGH 13.7.AFTER PERMIT COVERAGE IS TERMINATED UNDER THIS ITEM, ANY SUBSEQUENT DEVELOPMENT ON THE REMAINING PORTIONSOF THE SITE WILL REQUIRE PERMIT COVERAGE IF THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAININGCOMMON PLAN OF DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN SIZE.[MINN. R. 7090]4.5 PERMITTEES MAY TERMINATE COVERAGE UPON MPCA APPROVAL AFTER SUBMITTING INFORMATION DOCUMENTING THEOWNER CANCELED THE PROJECT. [MINN. R. 7090]6.1 SWPPP AMENDMENTS. [MINN. R. 7090]6.2 ONE OF THE INDIVIDUALS DESCRIBED IN ITEM 21.2.A OR ITEM 21.2.B OR ANOTHER QUALIFIED INDIVIDUAL MUST COMPLETEALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBINGHOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. [MINN. R. 7090]6.3 PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECTPROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION,MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TOSURFACE WATERS OR GROUNDWATER. [MINN. R. 7090]6.4 PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECTPROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OROPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLYMINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSINGWATER QUALITY STANDARD EXCEEDANCES (E.G., NUISANCE CONDITIONS AS DEFINED IN MINN. R. 7050.0210, SUBP. 2) OR THESWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL. [MINN. R. 7050.0210]7.1 BMP SELECTION AND INSTALLATION. [MINN. R. 7090]7.2 PERMITTEES MUST SELECT, INSTALL, AND MAINTAIN THE BMPS IDENTIFIED IN THE SWPPP AND IN THIS PERMIT IN ANAPPROPRIATE AND FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT MANUFACTURER SPECIFICATIONS ANDACCEPTED ENGINEERING PRACTICES. [MINN. R. 7090]8.1 EROSION PREVENTION PRACTICES. [MINN. R. 7090]8.2 BEFORE WORK BEGINS, PERMITTEES MUST DELINEATE THE LOCATION OF AREAS NOT TO BE DISTURBED. [MINN. R. 7090]8.3 PERMITTEES MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT WITH STEEP SLOPES. WHENSTEEP SLOPES MUST BE DISTURBED, PERMITTEES MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICESDESIGNED FOR STEEP SLOPES (E.G., SLOPE DRAINING AND TERRACING). [MINN. R. 7090]8.4 PERMITTEES MUST STABILIZE ALL EXPOSED SOIL AREAS, INCLUDING STOCKPILES. STABILIZATION MUST BE INITIATEDIMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ON ANYPORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 7 CALENDAR DAYS. STABILIZATION MUST BECOMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY HAS CEASED. STABILIZATION IS NOTREQUIRED ON CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES. STABILIZATION IS NOTREQUIRED ON TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., CLEANAGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) BUT PERMITTEES MUST PROVIDESEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE. [MINN. R. 7090]8.5 FOR PUBLIC WATERS THAT THE MINNESOTA DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS" DURING SPECIFIEDFISH SPAWNING TIME FRAMES, PERMITTEES MUST COMPLETE STABILIZATION OF ALL EXPOSED SOIL AREAS WITHIN 200 FEETOF THE WATER'S EDGE, AND THAT DRAIN TO THESE WATERS, WITHIN 24 HOURS DURING THE RESTRICTION PERIOD. [MINN. R.7090]8.6 PERMITTEES MUST STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAR FEET OF TEMPORARY ORPERMANENT DRAINAGE DITCHES OR SWALES THAT DRAIN WATER FROM THE SITE WITHIN 24 HOURS AFTER CONNECTING TO ASURFACE WATER OR PROPERTY EDGE. PERMITTEES MUST COMPLETE STABILIZATION OF REMAINING PORTIONS OFTEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER ORPROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH TEMPORARILY OR PERMANENTLY CEASES. [MINN. R.7090]8.7 TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DURINGCONSTRUCTION (WITH PROPERLY DESIGNED ROCK-DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BESTABILIZED. PERMITTEES MUST STABILIZE THESE AREAS WITHIN 24 HOURS AFTER THEIR USE AS A SEDIMENT CONTAINMENTSYSTEM CEASES. [MINN. R. 7090]8.8 PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTIONPRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY OR PERMANENT DRAINAGE DITCHOR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2 PERCENT. [MINN. R. 7090]8.9 PERMITTEES MUST PROVIDE TEMPORARY OR PERMANENT ENERGY DISSIPATION AT ALL PIPE OUTLETS WITHIN 24 HOURSAFTER CONNECTION TO A SURFACE WATER OR PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]8.10 PERMITTEES MUST NOT DISTURB MORE LAND (I.E., PHASING) THAN CAN BE EFFECTIVELY INSPECTED AND MAINTAINED INACCORDANCE WITH SECTION 11. [MINN. R. 7090]9.1 SEDIMENT CONTROL PRACTICES. [MINN. R. 7090]9.2 PERMITTEES MUST ESTABLISH SEDIMENT CONTROL BMPS ON ALL DOWNGRADIENT PERIMETERS OF THE SITE ANDDOWNGRADIENT AREAS OF THE SITE THAT DRAIN TO ANY SURFACE WATER, INCLUDING CURB AND GUTTER SYSTEMS.PERMITTEES MUST LOCATE SEDIMENT CONTROL PRACTICES UPGRADIENT OF ANY BUFFER ZONES. PERMITTEES MUST INSTALLSEDIMENT CONTROL PRACTICES BEFORE ANY UPGRADIENT LAND-DISTURBING ACTIVITIES BEGIN AND MUST KEEP THESEDIMENT CONTROL PRACTICES IN PLACE UNTIL THEY ESTABLISH PERMANENT COVER. [MINN. R. 7090]9.3 IF DOWNGRADIENT SEDIMENT CONTROLS ARE OVERLOADED, BASED ON FREQUENT FAILURE OR EXCESSIVE MAINTENANCEREQUIREMENTS, PERMITTEES MUST INSTALL ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPSTO ELIMINATE THE OVERLOADING AND AMEND THE SWPPP TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN ITEM6.3. [MINN. R. 7090]9.4 TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS DESIGNED AS PART OF A SEDIMENTCONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK-CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICES ONLY ASAPPROPRIATE FOR SITE CONDITIONS. [MINN. R. 7090]9.5 A FLOATING SILT CURTAIN PLACED IN THE WATER IS NOT A SEDIMENT CONTROL BMP TO SATISFY ITEM 9.2 EXCEPT WHENWORKING ON A SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE SHORT TERM CONSTRUCTION ACTIVITY(E.G., INSTALLATION OF RIP RAP ALONG THE SHORELINE) IN THAT AREA IS COMPLETE, PERMITTEES MUST INSTALL AN UPLANDPERIMETER CONTROL PRACTICE IF EXPOSED SOILS STILL DRAIN TO A SURFACE WATER. [MINN. R. 7090]9.6 PERMITTEES MUST RE-INSTALL ALL SEDIMENT CONTROL PRACTICES ADJUSTED OR REMOVED TO ACCOMMODATESHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES, IMMEDIATELY AFTER THESHORT-TERM ACTIVITY IS COMPLETED. PERMITTEES MUST RE-INSTALL SEDIMENT CONTROL PRACTICES BEFORE THE NEXTPRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT COMPLETE. [MINN. R. 7090]9.7 PERMITTEES MUST PROTECT ALL STORM DRAIN INLETS USING APPROPRIATE BMPS DURING CONSTRUCTION UNTIL THEYESTABLISH PERMANENT COVER ON ALL AREAS WITH POTENTIAL FOR DISCHARGING TO THE INLET. [MINN. R. 7090]9.8 PERMITTEES MAY REMOVE INLET PROTECTION FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (E.G. STREETFLOODING/FREEZING) IS IDENTIFIED BY THE PERMITTEES OR THE JURISDICTIONAL AUTHORITY (E.G.,CITY/COUNTY/TOWNSHIP/MINNESOTA DEPARTMENT OF TRANSPORTATION ENGINEER). PERMITTEES MUST DOCUMENT THENEED FOR REMOVAL IN THE SWPPP. [MINN. R. 7090]9.9 PERMITTEES MUST PROVIDE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AT THE BASE OF STOCKPILES ON THEDOWNGRADIENT PERIMETER. [MINN. R. 7090]9.10 PERMITTEES MUST LOCATE STOCKPILES OUTSIDE OF NATURAL BUFFERS OR SURFACE WATERS, INCLUDINGSTORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS UNLESS THERE IS A BYPASS IN PLACE FOR THESTORMWATER. [MINN. R. 7090]9.11 PERMITTEES MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF SEDIMENT FROM THECONSTRUCTION SITE OR ONTO PAVED ROADS WITHIN THE SITE. [MINN. R. 7090]9.12 PERMITTEES MUST USE STREET SWEEPING IF VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENTTRACKING ONTO THE STREET. [MINN. R. 7090]9.13 PERMITTEES MUST INSTALL TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 14. [MINN. R. 7090]9.14 IN ANY AREAS OF THE SITE WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PERMITTEES MUST RESTRICT VEHICLEAND EQUIPMENT USE TO MINIMIZE SOIL COMPACTION. [MINN. R. 7090]9.15 PERMITTEES MUST PRESERVE TOPSOIL ON THE SITE, UNLESS INFEASIBLE. [MINN. R. 7090]9.16 PERMITTEES MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS UNLESS INFEASIBLE. [MINN. R. 7090]9.17 PERMITTEES MUST PRESERVE A 50 FOOT NATURAL BUFFER OR, IF A BUFFER IS INFEASIBLE ON THE SITE, PROVIDEREDUNDANT (DOUBLE) PERIMETER SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THEPROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. PERMITTEES MUST INSTALLPERIMETER SEDIMENT CONTROLS AT LEAST 5 FEET APART UNLESS LIMITED BY LACK OF AVAILABLE SPACE. NATURAL BUFFERSARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES, STORMWATER CONVEYANCECHANNELS, STORM DRAIN INLETS, AND SEDIMENT BASINS. IF PRESERVING THE BUFFER IS INFEASIBLE, PERMITTEES MUSTDOCUMENT THE REASONS IN THE SWPPP. SHEET PILING IS A REDUNDANT PERIMETER CONTROL IF INSTALLED IN A MANNERTHAT RETAINS ALL STORMWATER. [MINN. R. 7090]9.18 PERMITTEES MUST USE POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS IN ACCORDANCEWITH ACCEPTED ENGINEERING PRACTICES, DOSING SPECIFICATIONS AND SEDIMENT REMOVAL DESIGN SPECIFICATIONSPROVIDED BY THE MANUFACTURER OR SUPPLIER. THE PERMITTEES MUST USE CONVENTIONAL EROSION AND SEDIMENTCONTROLS PRIOR TO CHEMICAL ADDITION AND MUST DIRECT TREATED STORMWATER TO A SEDIMENT CONTROL SYSTEM FORFILTRATION OR SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. [MINN. R. 7090]11.7 PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY BECOMENONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE DEVICE. [MINN. R. 7090]11.8 PERMITTEES MUST DRAIN TEMPORARY AND PERMANENT SEDIMENTATION BASINS AND REMOVE THE SEDIMENT WHEN THEDEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME. [MINN. R. 7090]11.9 PERMITTEES MUST ENSURE THAT AT LEAST ONE INDIVIDUAL PRESENT ON THE SITE (OR AVAILABLE TO THE PROJECT SITEIN THREE (3) CALENDAR DAYS) IS TRAINED IN THE JOB DUTIES DESCRIBED IN ITEM 21.2.B. [MINN. R. 7090]11.10 PERMITTEES MAY ADJUST THE INSPECTION SCHEDULE DESCRIBED IN ITEM 11.2 AS FOLLOWS:A. INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF CONSTRUCTIONACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE; ORB. WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS OCCURRINGANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND, AFTER 12 MONTHS, MAY BESUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE MPCA MAY REQUIRE INSPECTIONS TO RESUMEIF CONDITIONS WARRANT; ORC. WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, INSPECTIONS MAY BESUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING, OR UPON RESUMINGCONSTRUCTION, WHICHEVER COMES FIRST. [MINN. R. 7090]11.11 PERMITTEES MUST RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES WITHIN 24 HOURS OF BEING CONDUCTEDAND THESE RECORDS MUST BE RETAINED WITH THE SWPPP. THESE RECORDS MUST INCLUDE:A. DATE AND TIME OF INSPECTIONS; ANDB. NAME OF PERSONS CONDUCTING INSPECTIONS; ANDC. ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE NEEDED;ANDD. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES); ANDE. DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCHES IN 24 HOURS, AND THE AMOUNT OF RAINFALL FOR EACH EVENT.PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE, AWEATHER STATION THAT IS WITHIN ONE (1) MILE OF YOUR LOCATION, OR A WEATHER REPORTING SYSTEM THAT PROVIDESSITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES; ANDF. IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD PHOTOGRAPH ANDDESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR SUSPENDED SOLIDS, OIL SHEEN, ANDOTHER OBVIOUS INDICATORS OF POLLUTANTS); ANDG. ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE DOCUMENTED AS REQUIRED INSECTION 6 WITHIN SEVEN (7) CALENDAR DAYS. [MINN. R. 7090]12.1 POLLUTION PREVENTION MANAGEMENT MEASURES. [MINN. R. 7090]12.2 PERMITTEES MUST PLACE BUILDING PRODUCTS AND LANDSCAPE MATERIALS UNDER COVER (E.G., PLASTIC SHEETING ORTEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITHSTORMWATER. PERMITTEES ARE NOT REQUIRED TO COVER OR PROTECT PRODUCTS WHICH ARE EITHER NOT A SOURCE OFCONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER. [MINN. R. 7090]12.3 PERMITTEES MUST PLACE PESTICIDES, FERTILIZERS AND TREATMENT CHEMICALS UNDER COVER (E.G., PLASTIC SHEETINGOR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITHSTORMWATER. [MINN. R. 7090]12.4 PERMITTEES MUST STORE HAZARDOUS MATERIALS AND TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE,HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURINGCOMPOUNDS, AND ACIDS) IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE ANDDISPOSAL OF HAZARDOUS WASTE MATERIALS MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARYCONTAINMENT AS APPLICABLE. [MINN. R. 7090]12.5 PERMITTEES MUST PROPERLY STORE, COLLECT AND DISPOSE SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035.[MINN. R. 7035]12.6 PERMITTEES MUST POSITION PORTABLE TOILETS SO THEY ARE SECURE AND WILL NOT TIP OR BE KNOCKED OVER.PERMITTEES MUST PROPERLY DISPOSE SANITARY WASTE IN ACCORDANCE WITH MINN. R. CH. 7041. [MINN. R. 7041]12.7 PERMITTEES MUST TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED CHEMICALS,INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED INCLUDING THE USE OF DRIPPANS OR ABSORBENTS UNLESS INFEASIBLE. PERMITTEES MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMESTO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVEREDSPILLED MATERIALS. PERMITTEES MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. 115.061,USING DRY CLEAN UP MEASURES WHERE POSSIBLE. [MINN. STAT. 115.061]12.8 PERMITTEES MUST LIMIT VEHICLE EXTERIOR WASHING AND EQUIPMENT TO A DEFINED AREA OF THE SITE. PERMITTEESMUST CONTAIN RUNOFF FROM THE WASHING AREA IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS ANDMUST DISPOSE WASTE FROM THE WASHING ACTIVITY PROPERLY. PERMITTEES MUST PROPERLY USE AND STORE SOAPS,DETERGENTS, OR SOLVENTS. [MINN. R. 7090]12.9 PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUTOPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTIONMATERIALS) RELATED TO THE CONSTRUCTION ACTIVITY. PERMITTEES MUST PREVENT LIQUID AND SOLID WASHOUT WASTESFROM CONTACTING THE GROUND AND MUST DESIGN THE CONTAINMENT SO IT DOES NOT RESULT IN RUNOFF FROM THEWASHOUT OPERATIONS OR AREAS. PERMITTEES MUST PROPERLY DISPOSE LIQUID AND SOLID WASTES IN COMPLIANCE WITHMPCA RULES. PERMITTEES MUST INSTALL A SIGN INDICATING THE LOCATION OF THE WASHOUT FACILITY. [MINN. R. 7035, MINN.R. 7090]13.1 PERMIT TERMINATION CONDITIONS. [MINN. R. 7090]13.2 PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER OVER ALL AREASPRIOR TO SUBMITTING THE NOT. VEGETATIVE COVER MUST CONSIST OF A UNIFORM PERENNIAL VEGETATION WITH A DENSITYOF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREADICTATES NO VEGETATION, SUCH AS IMPERVIOUS SURFACES OR THE BASE OF A SAND FILTER. [MINN. R. 7090]13.3 PERMITTEES MUST CLEAN THE PERMANENT STORMWATER TREATMENT SYSTEM OF ANY ACCUMULATED SEDIMENT ANDMUST ENSURE THE SYSTEM MEETS ALL APPLICABLE REQUIREMENTS IN SECTION 15 THROUGH 19 AND IS OPERATING ASDESIGNED. [MINN. R. 7090]13.4 PERMITTEES MUST REMOVE ALL SEDIMENT FROM CONVEYANCE SYSTEMS PRIOR TO SUBMITTING THE NOT. [MINN. R. 7090]13.5 PERMITTEES MUST REMOVE ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS PRIORTO SUBMITTING THE NOT. PERMITTEES MAY LEAVE BMPS DESIGNED TO DECOMPOSE ON-SITE IN PLACE. [MINN. R. 7090]13.6 FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE STRUCTURES AREFINISHED AND TEMPORARY EROSION PREVENTION AND DOWNGRADIENT PERIMETER CONTROL IS COMPLETE, THE RESIDENCESELLS TO THE HOMEOWNER, AND THE PERMITTEE DISTRIBUTES THE MPCA'S "HOMEOWNER FACT SHEET" TO THEHOMEOWNER. [MINN. R. 7090]13.7 FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROPLAND), PERMITTEES MUSTRETURN THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE PRIOR TO SUBMITTING THE NOT. [MINN. R. 7090]15.5 PERMITTEES MUST FIRST CONSIDER VOLUME REDUCTION PRACTICES ON-SITE (E.G., INFILTRATION OR OTHER) WHENDESIGNING THE PERMANENT STORMWATER TREATMENT SYSTEM. IF THIS PERMIT PROHIBITS INFILTRATION AS DESCRIBED INITEM 16.14 THROUGH ITEM 16.21, PERMITTEES MAY CONSIDER A WET SEDIMENTATION BASIN, FILTRATION BASIN OR REGIONALPOND. THIS PERMIT DOES NOT CONSIDER WET SEDIMENTATION BASINS AND FILTRATION SYSTEMS TO BE VOLUME REDUCTIONPRACTICES. [MINN. R. 7090]15.6 FOR PROJECTS WHERE THE FULL VOLUME REDUCTION REQUIREMENT CANNOT BE MET ON-SITE, (E.G., THE SITE HASINFILTRATION PROHIBITIONS), PERMITTEES MUST DOCUMENT THE REASONS IN THE SWPPP. [MINN. R. 7090]15.7 PERMITTEES MUST DISCHARGE THE WATER QUALITY VOLUME TO A PERMANENT STORMWATER TREATMENT SYSTEMPRIOR TO DISCHARGE TO A SURFACE WATER. FOR PURPOSES OF THIS ITEM, SURFACE WATERS DO NOT INCLUDE MAN-MADEDRAINAGE SYSTEMS THAT CONVEY STORMWATER TO A PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]15.8 WHERE THE PROXIMITY TO BEDROCK PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATERTREATMENT PRACTICES REQUIRED BY SECTIONS 15 THROUGH 19, PERMITTEES MUST INSTALL OTHER TREATMENT SUCH ASGRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS, PRIOR TO THE DISCHARGE OF STORMWATER TO SURFACE WATERS.[MINN. R. 7090]15.9 FOR LINEAR PROJECTS WHERE PERMITTEES CANNOT TREAT THE ENTIRE WATER QUALITY VOLUME WITHIN THE EXISTINGRIGHTOF-WAY, PERMITTEES MUST MAKE A REASONABLE ATTEMPT TO OBTAIN ADDITIONAL RIGHT-OF-WAY, EASEMENT OROTHER PERMISSION FOR STORMWATER TREATMENT DURING THE PROJECT PLANNING PROCESS. DOCUMENTATION OF THESEATTEMPTS MUST BE IN THE SWPPP. PERMITTEES MUST STILL CONSIDER VOLUME REDUCTION PRACTICES FIRST AS DESCRIBEDIN ITEM 15.5. IF PERMITTEES CANNOT OBTAIN ADDITIONAL RIGHT-OF-WAY, EASEMENT OR OTHER PERMISSION, THEY MUSTMAXIMIZE THE TREATMENT OF THE WATER QUALITY VOLUME PRIOR TO DISCHARGE TO SURFACE WATERS. [MINN. R. 7090]16.1 INFILTRATION SYSTEMS. [MINN. R. 7090]16.2 INFILTRATION OPTIONS INCLUDE, BUT ARE NOT LIMITED TO: INFILTRATION BASINS, INFILTRATION TRENCHES, RAINWATERGARDENS, BIORETENTION AREAS WITHOUT UNDERDRAINS, SWALES WITH IMPERMEABLE CHECK DAMS, AND NATURALDEPRESSIONS. IF PERMITTEES UTILIZE AN INFILTRATION SYSTEM TO MEET THE REQUIREMENTS OF THIS PERMIT, THEY MUSTINCORPORATE THE DESIGN PARAMETERS IN ITEM 16.3 THROUGH ITEM 16.21. PERMITTEES MUST FOLLOW THE INFILTRATIONPROHIBITION IN ITEM 16.14 ANYTIME AN INFILTRATION SYSTEM IS DESIGNED, INCLUDING THOSE NOT REQUIRED BY THISPERMIT. [MINN. R. 7090]16.3 PERMITTEES MUST DESIGN INFILTRATION SYSTEMS SUCH THAT PRE-EXISTING HYDROLOGIC CONDITIONS OF WETLANDS INTHE VICINITY ARE NOT IMPACTED (E.G., INUNDATION OR BREACHING A PERCHED WATER TABLE SUPPORTING A WETLAND).[MINN. R. 7090]16.4 PERMITTEES MUST NOT EXCAVATE INFILTRATION SYSTEMS TO FINAL GRADE, OR WITHIN THREE (3) FEET OF FINAL GRADE,UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS THEY PROVIDERIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT AND RUNOFFCOMPLETELY AWAY FROM THE INFILTRATION AREA. [MINN. R. 7090]16.5 WHEN EXCAVATING AN INFILTRATION SYSTEM TO WITHIN THREE (3) FEET OF FINAL GRADE, PERMITTEES MUST STAKE OFFAND MARK THE AREA SO HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT DO NOT COMPACT THE SOIL IN THE INFILTRATIONAREA. [MINN. R. 7090]16.6 PERMITTEES MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, FOREBAY, OR WATER QUALITYINLET (E.G., GRIT CHAMBER) TO REMOVE SOLIDS, FLOATING MATERIALS, AND OIL AND GREASE FROM THE RUNOFF, TO THEMAXIMUM EXTENT PRACTICABLE, BEFORE THE SYSTEM ROUTES STORMWATER TO THE INFILTRATION SYSTEM. [MINN. R. 7090]16.7 PERMITTEES MUST DESIGN INFILTRATION SYSTEMS TO PROVIDE A WATER QUALITY VOLUME (CALCULATED AS ANINSTANTANEOUS VOLUME) OF ONE (1) INCH OF RUNOFF, OR ONE (1) INCH MINUS THE VOLUME OF STORMWATER TREATED BYANOTHER SYSTEM ON THE SITE, FROM THE NET INCREASE OF IMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN. R.7090]16.8 PERMITTEES MUST DESIGN THE INFILTRATION SYSTEM TO DISCHARGE ALL STORMWATER (INCLUDING STORMWATER INEXCESS OF THE WATER QUALITY VOLUME) ROUTED TO THE SYSTEM THROUGH THE UPPERMOST SOIL SURFACE ORENGINEERED MEDIA SURFACE WITHIN 48 HOURS. PERMITTEES MUST ROUTE ADDITIONAL FLOWS THAT CANNOT INFILTRATEWITHIN 48 HOURS TO BYPASS THE SYSTEM THROUGH A STABILIZED DISCHARGE POINT. [MINN. R. 7090]16.9 PERMITTEES MUST PROVIDE A MEANS TO VISUALLY VERIFY THE INFILTRATION SYSTEM IS DISCHARGING THROUGH THESOIL SURFACE OR FILTER MEDIA SURFACE WITHIN 48 HOURS OR LESS. [MINN. R. 7090]16.10 PERMITTEES MUST PROVIDE AT LEAST ONE SOIL BORING, TEST PIT OR INFILTROMETER TEST IN THE LOCATION OF THEINFILTRATION PRACTICE FOR DETERMINING INFILTRATION RATES. [MINN. R. 7090]16.11 FOR DESIGN PURPOSES, PERMITTEES MUST DIVIDE FIELD MEASURED INFILTRATION RATES BY 2 AS A SAFETY FACTOR ORPERMITTEES CAN USE SOIL-BORING RESULTS WITH THE INFILTRATION RATE CHART IN THE MINNESOTA STORMWATER MANUALTO DETERMINE DESIGN INFILTRATION RATES. WHEN SOIL BORINGS INDICATE TYPE A SOILS, PERMITTEES SHOULD PERFORMFIELD MEASUREMENTS TO VERIFY THE RATE IS NOT ABOVE 8.3 INCHES PER HOUR. THIS PERMIT PROHIBITS INFILTRATION IFTHE FIELD MEASURED INFILTRATION RATE IS ABOVE 8.3 INCHES PER HOUR. [MINN. R. 7090]16.12 PERMITTEES MUST EMPLOY APPROPRIATE ON-SITE TESTING ENSURE A MINIMUM OF THREE (3) FEET OF SEPARATIONFROM THE SEASONALLY SATURATED SOILS (OR FROM BEDROCK) AND THE BOTTOM OF THE PROPOSED INFILTRATION SYSTEM.[MINN. R. 7090]16.13 PERMITTEES MUST DESIGN A MAINTENANCE ACCESS, TYPICALLY EIGHT (8) FEET WIDE, FOR THE INFILTRATION SYSTEM.[MINN. R. 7090]16.14 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS THAT RECEIVE RUNOFF FROMVEHICLE FUELING AND MAINTENANCE AREAS INCLUDING CONSTRUCTION OF INFILTRATION SYSTEMS NOT REQUIRED BY THISPERMIT. [MINN. R. 7090]16.15 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS WHERE INFILTRATING STORMWATERMAY MOBILIZE HIGH LEVELS OF CONTAMINANTS IN SOIL OR GROUNDWATER. PERMITTEES MUST EITHER COMPLETE THEMPCA'S CONTAMINATION SCREENING CHECKLIST OR CONDUCT THEIR OWN ASSESSMENT TO DETERMINE THE SUITABILITY FORINFILTRATION. PERMITTEES MUST RETAIN THE CHECKLIST OR ASSESSMENT WITH THE SWPPP. FOR MORE INFORMATION ANDTO ACCESS THE MPCA'S "CONTAMINATION SCREENING CHECKLIST" SEE THE MINNESOTA STORMWATER MANUAL. [MINN. R.7090]16.16 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WHERE SOIL INFILTRATIONRATES ARE FIELD MEASURED AT MORE THAN 8.3 INCHES PER HOUR UNLESS THEY AMEND SOILS TO SLOW THE INFILTRATIONRATE BELOW 8.3 INCHES PER HOUR. [MINN. R. 7090]16.17 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WITH LESS THAN THREE(3) FEET OF SEPARATION DISTANCE FROM THE BOTTOM OF THE INFILTRATION SYSTEM TO THE ELEVATION OF THESEASONALLY SATURATED SOILS OR THE TOP OF BEDROCK. [MINN. R. 7090]16.18 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS OF PREDOMINATELYHYDROLOGIC SOIL GROUP TYPE D SOILS (CLAY). [MINN. R. 7090]16.19 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS WITHIN A DRINKING WATER SUPPLYMANAGEMENT AREA (DWSMA) AS DEFINED IN MINN. R. 4720.5100, SUBP. 13, IF THE SYSTEM WILL BE LOCATED:A. IN AN EMERGENCY RESPONSE AREA (ERA) WITHIN A DWSMA CLASSIFIED AS HAVING HIGH OR VERY HIGH VULNERABILITYAS DEFINED BY THE MINNESOTA DEPARTMENT OF HEALTH; ORB. IN AN ERA WITHIN A DWSMA CLASSIFIED AS MODERATE VULNERABILITY UNLESS A REGULATED MS4 PERMITTEEPERFORMED OR APPROVED A HIGHER LEVEL OF ENGINEERING REVIEW SUFFICIENT TO PROVIDE A FUNCTIONINGTREATMENT SYSTEM AND TO PREVENT ADVERSE IMPACTS TO GROUNDWATER; ORC. OUTSIDE OF AN ERA WITHIN A DWSMA CLASSIFIED AS HAVING HIGH OR VERY HIGH VULNERABILITY, UNLESS A REGULATEDMS4 PERMITTEE PERFORMED OR APPROVED A HIGHER LEVEL OF ENGINEERING REVIEW SUFFICIENT TO PROVIDE AFUNCTIONING TREATMENT SYSTEM AND TO PREVENT ADVERSE IMPACTS TO GROUNDWATER.SEE "HIGHER LEVEL OF ENGINEERING REVIEW" IN THE MINNESOTA STORMWATER MANUAL FOR MORE INFORMATION. [MINN. R.7090]16.20 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WITHIN 1,000 FEETUPGRADIENT OR 100 FEET DOWNGRADIENT OF ACTIVE KARST FEATURES. [MINN. R. 7090]16.21 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS THAT RECEIVE RUNOFFFROM THE FOLLOWING INDUSTRIAL FACILITIES NOT AUTHORIZED TO INFILTRATE STORMWATER UNDER THE NPDESSTORMWATER PERMIT FOR INDUSTRIAL ACTIVITIES: AUTOMOBILE SALVAGE YARDS; SCRAP RECYCLING AND WASTE RECYCLINGFACILITIES; HAZARDOUS WASTE TREATMENT, STORAGE, OR DISPOSAL FACILITIES; OR AIR TRANSPORTATION FACILITIES THATCONDUCT DEICING ACTIVITIES. [MINN. R. 7090]10.1 DEWATERING AND BASIN DRAINING. [MINN. R. 7090]10.2 PERMITTEES MUST DISCHARGE TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING(E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENT BASIN ON THEPROJECT SITE UNLESS INFEASIBLE. PERMITTEES MAY DEWATER TO SURFACE WATERS IF THEY VISUALLY CHECK TO ENSUREADEQUATE TREATMENT HAS BEEN OBTAINED AND NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULTFROM THE DISCHARGE. IF PERMITTEES CANNOT DISCHARGE THE WATER TO A SEDIMENTATION BASIN PRIOR TO ENTERING ASURFACE WATER, PERMITTEES MUST TREAT IT WITH APPROPRIATE BMPS SUCH THAT THE DISCHARGE DOES NOT ADVERSELYAFFECT THE SURFACE WATER OR DOWNSTREAM PROPERTIES. [MINN. R. 7050.0210]10.3 IF PERMITTEES MUST DISCHARGE WATER CONTAINING OIL OR GREASE, THEY MUST USE AN OIL-WATER SEPARATOR ORSUITABLE FILTRATION DEVICE (E.G., CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO DISCHARGE. [MINN. R. 7090]10.4 PERMITTEES MUST DISCHARGE ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES IN A MANNER THAT DOESNOT CAUSE EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR INUNDATION OF WETLANDS IN THEIMMEDIATE VICINITY OF DISCHARGE POINTS THAT CAUSES SIGNIFICANT ADVERSE IMPACT TO THE WETLAND. [MINN. R. 7090]10.5 IF PERMITTEES USE FILTERS WITH BACKWASH WATER, THEY MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL,RETURN THE BACKWASH WATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATERINTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION. [MINN. R. 7090]14.1 TEMPORARY SEDIMENT BASINS. [MINN. R. 7090]14.2 WHERE FIVE (5) OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATION, PERMITTEES MUST PROVIDE ATEMPORARY SEDIMENT BASIN TO PROVIDE TREATMENT OF THE RUNOFF BEFORE IT LEAVES THE CONSTRUCTION SITE ORENTERS SURFACE WATERS. PERMITTEES MAY CONVERT A TEMPORARY SEDIMENT BASIN TO A PERMANENT BASIN AFTERCONSTRUCTION IS COMPLETE. THE TEMPORARY BASIN IS NO LONGER REQUIRED WHEN PERMANENT COVER HAS REDUCEDTHE ACREAGE OF DISTURBED SOIL TO LESS THAN FIVE (5) ACRES DRAINING TO A COMMON LOCATION. [ PROVISIONS TO MINN.R. 7090]14.3 THE TEMPORARY BASIN MUST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO (2)-YEAR,24-HOUR STORM FROM EACH ACRE DRAINED TO THE BASIN OR 1,800 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED,WHICHEVER IS GREATER. [MINN. R. 7090]14.4 WHERE PERMITTEES HAVE NOT CALCULATED THE TWO (2)-YEAR, 24-HOUR STORM RUNOFF AMOUNT, THE TEMPORARYBASIN MUST PROVIDE 3,600 CUBIC FEET OF LIVE STORAGE PER ACRE OF THE BASINS' DRAINAGE AREA. [MINN. R. 7090]14.5 PERMITTEES MUST DESIGN BASIN OUTLETS TO PREVENT SHORT-CIRCUITING AND THE DISCHARGE OF FLOATING DEBRIS.[MINN. R. 7090]14.6 PERMITTEES MUST DESIGN THE OUTLET STRUCTURE TO WITHDRAW WATER FROM THE SURFACE TO MINIMIZE THEDISCHARGE OF POLLUTANTS. PERMITTEES MAY TEMPORARILY SUSPEND THE USE OF A SURFACE WITHDRAWAL MECHANISMDURING FROZEN CONDITIONS. THE BASIN MUST INCLUDE A STABILIZED EMERGENCY OVERFLOW TO PREVENT FAILURE OFPOND INTEGRITY. [MINN. R. 7090]14.7 PERMITTEES MUST PROVIDE ENERGY DISSIPATION FOR THE BASIN OUTLET WITHIN 24 HOURS AFTER CONNECTION TO ASURFACE WATER. [MINN. R. 7090]14.8 PERMITTEES MUST LOCATE TEMPORARY BASINS OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REQUIRED INITEM 23.11. [MINN. R. 7090]14.9 PERMITTEES MUST CONSTRUCT THE TEMPORARY BASINS PRIOR TO DISTURBING 10 OR MORE ACRES OF SOIL DRAININGTO A COMMON LOCATION. [MINN. R. 7090]14.10 WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REQUIREMENTS OF ITEM 14.3 THROUGH 14.9 IS INFEASIBLE,PERMITTEES MUST INSTALL EFFECTIVE SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS AND/OR SEDIMENT TRAPS,SILT FENCES, VEGETATIVE BUFFER STRIPS OR ANY APPROPRIATE COMBINATION OF MEASURES AS DICTATED BY INDIVIDUALSITE CONDITIONS. IN DETERMINING WHETHER INSTALLING A SEDIMENT BASIN IS INFEASIBLE, PERMITTEES MUST CONSIDERPUBLIC SAFETY AND MAY CONSIDER FACTORS SUCH AS SITE SOILS, SLOPE, AND AVAILABLE AREA ON-SITE. PERMITTEES MUSTDOCUMENT THIS DETERMINATION OF INFEASIBILITY IN THE SWPPP. [MINN. R. 7090]5.1 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) CONTENT [MINN. R. 7090]5.3 THE SWPPP MUST INCORPORATE SPECIFIC BEST MANAGEMENT PRACTICES (BMP) USED TO COMPLY WITH THEREQUIREMENTS OF THIS PERMIT. [MINN. R. 7090]5.4 THE SWPPP MUST INCLUDE A NARRATIVE DESCRIBING THE TIMING FOR INSTALLATION OF ALL EROSION PREVENTION ANDSEDIMENT CONTROL BMPs AND A DESCRIPTION OF THE PERMANENT STORMWATER TREATMENT SYSTEMS. [MINN. R. 7090]5.5 THE SWPPP MUST INCLUDE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION ANDSEDIMENT CONTROL BMPS ALONG WITH PROCEDURES USED TO ESTABLISH ADDITIONAL TEMPORARY BMPS AS NECESSARYFOR THE SITE CONDITIONS DURING CONSTRUCTION. STANDARD DETAILS AND/OR SPECIFICATIONS FOR BMPS MUST BEINCLUDED IN THE FINAL PLANS AND SPECIFICATIONS FOR THE PROJECT. [MINN. R. 7090]5.6 THE SWPPP MUST INCLUDE THE CALCULATIONS AND OTHER INFORMATION USED FOR THE DESIGN OF TEMPORARYSEDIMENT BASINS AND ANY OF THE PERMANENT STORMWATER TREATMENT SYSTEMS REQUIRED IN SECTION 15. [MINN. R.7090]5.7 THE SWPPP MUST INCLUDE ESTIMATED QUANTITIES ANTICIPATED AT THE START OF THE PROJECT FOR THE LIFE OF THEPROJECT FOR ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS (E.G., LINEAR FEET OF SILT FENCE OR SQUARE FEETOF EROSION CONTROL BLANKET). [MINN. R. 7090]5.8 THE SWPPP MUST INCLUDE THE NUMBER OF ACRES OF IMPERVIOUS SURFACE FOR BOTH PRE- AND POST-CONSTRUCTION.[MINN. R. 7090]5.9 THE SWPPP MUST INCLUDE A SITE MAP WITH EXISTING AND FINAL GRADES, INCLUDING DRAINAGE AREA BOUNDARIES,DIRECTIONS OF FLOW AND ALL DISCHARGE POINTS WHERE STORMWATER IS LEAVING THE SITE OR ENTERING A SURFACEWATER.THE SITE MAP MUST INDICATE THE AREAS OF STEEP SLOPES. THE SITE MAP MUST ALSO INCLUDE IMPERVIOUS SURFACES,SOIL TYPES AND LOCATIONS OF POTENTIAL POLLUTANT-GENERATING ACTIVITIES AS IDENTIFIED IN SECTION 12. [MINN. R. 7090]5.10 THE SWPPP MUST INCLUDE A MAP OF ALL SURFACE WATERS, EXISTING WETLANDS, AND STORMWATER PONDS OR BASINSTHAT CAN BE IDENTIFIED ON MAPS SUCH AS UNITED STATES GEOLOGICAL SURVEY 7.5 MINUTE QUADRANGLE MAPS, THENATIONAL WETLAND INVENTORY MAP OR EQUIVALENT MAPS AND ARE WITHIN ONE MILE (AERIAL RADIUS MEASUREMENT)FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER FROM THE CONSTRUCTION SITE, DURING OR AFTERCONSTRUCTION. THE SWPPP MUST IDENTIFY IF THE SURFACE WATERS ARE SPECIAL OR IMPAIRED WATERS. [MINN. R. 7090]5.11 THE SWPPP MUST INCLUDE A SITE MAP SHOWING CONSTRUCTION ACTIVITY AREAS THAT ARE ADJACENT TO AND DRAIN TOPUBLIC WATERS FOR WHICH THE DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS" DURING SPECIFIED FISHSPAWNING TIME FRAMES. [MINN. R. 7090]5.12 PERMITTEES MUST IDENTIFY LOCATIONS OF 50' BUFFER ZONES AS REQUIRED IN ITEM 9.17 AND 100' PERMANENT BUFFERZONES AS REQUIRED IN ITEM 23.11, ON PLAN SHEETS IN THE SWPPP. [MINN. R. 7090]5.13 IF PERMITTEES DETERMINE COMPLIANCE WITH THE FOLLOWING REQUIREMENTS IS INFEASIBLE, THEY MUST DOCUMENTTHE DETERMINATION IN THE SWPPP:a. TEMPORARY SEDIMENT BASIN AS DESCRIBED IN SECTION 14; ANDb. FOR LINEAR PROJECTS, IF THE PERMANENT STORMWATER TREATMENT SYSTEM CANNOT BE CONSTRUCTED WITHIN THERIGHT-OF-WAY, A REASONABLE ATTEMPT MUST BE MADE TO OBTAIN ADDITIONAL RIGHT-OF-WAY (ITEM 15.9); ANDc. BUFFER ZONES AS DESCRIBED IN ITEM 9.17 AND ITEM 23.11. [MINN. R. 7090]5.14 IF PERMITTEES DETERMINE THAT A TEMPORARY SEDIMENT BASIN IS INFEASIBLE AS DESCRIBED IN ITEM 14.10, THESWPPP MUST DESCRIBE THE ALTERNATIVE BMPS USED. [MINN. R. 7090]5.15 WHERE SYSTEMS CANNOT MEET THE FULL VOLUME REDUCTION REQUIREMENT ON SITE, (E.G., THE SITE HAS INFILTRATIONPROHIBITIONS, SEE ITEM 16.14 THROUGH ITEM 16.21) THE PERMITTEE MUST DOCUMENT THE REASONS IN THE SWPPP.[MINN. R. 7090]5.16 THE SWPPP MUST INCLUDE ANY STORMWATER MITIGATION MEASURES PROPOSED TO BE PART OF THE FINAL PROJECT INANY ENVIRONMENTAL REVIEW DOCUMENT, ENDANGERED SPECIES REVIEW, ARCHEOLOGICAL OR OTHER REQUIRED LOCAL,STATE OR FEDERAL REVIEW CONDUCTED FOR THE PROJECT. FOR PURPOSES OF THIS PERMIT, MITIGATION MEASURES MEANSACTIONS NECESSARY TO AVOID, MINIMIZE, OR MITIGATE FOR IMPACTS RELATED TO EROSION PREVENTION, SEDIMENTCONTROL, THE PERMANENT STORMWATER TREATMENT SYSTEM, POLLUTION PREVENTION MANAGEMENT MEASURES ANDDISCHARGES ASSOCIATED WITH THE PROJECT'S CONSTRUCTION ACTIVITY. [MINN. R. 7090]5.17 THE SWPPP MUST DESCRIBE THE METHODS USED FOR PERMANENT COVER OF ALL EXPOSED SOIL AREAS. [MINN. R. 7090]5.18 PERMITTEES MUST IDENTIFY THE LOCATIONS OF AREAS WHERE CONSTRUCTION WILL BE PHASED TO MINIMIZE THEDURATION OF EXPOSED SOIL AREAS IN THE SWPPP. [MINN. R. 7090]5.19 FOR PROJECTS WITH A DISCHARGE POINT ON THE PROJECT WITHIN ONE (1) MILE (AERIAL RADIUS MEASUREMENT) OF ANDWHICH FLOWS TO AN IMPAIRED WATER, PERMITTEES MUST IDENTIFY THE IMPAIRED WATER(S), AND ANY UNITED STATESENVIRONMENTAL PROTECTION AGENCY (USEPA)-APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL) FOR THEPOLLUTANT(S) OR STRESSOR(S) DESCRIBED IN ITEM 23.7. PERMITTEES' IDENTIFICATION MUST INCLUDE THOSE TMDLSAPPROVED AT ANY TIME PRIOR TO PERMIT APPLICATION SUBMITTAL AND ARE STILL IN EFFECT. [MINN. R. 7090]5.20 PERMITTEES MUST DOCUMENT IN THE SWPPP, ALL TRAINED INDIVIDUALS IDENTIFIED IN ITEM 21.2. DOCUMENTATIONMUST INCLUDE:a.NAMES OF PERSONNEL REQUIRED TO BE TRAINED; ANDb.DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY PROVIDING TRAINING; ANDc.CONTENT OF TRAINING COURSE.IF PERMITTEES DO NOT KNOW THE NAMES OF THE INDIVIDUALS AT THE TIME OF APPLICATION, THE PERMITTEES MUSTENSURE THEY DOCUMENT TRAINING BEFORE CONSTRUCTION ACTIVITY COMMENCES. [MINN. R. 7090]5.21 THE SWPPP MUST IDENTIFY A PERSON KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSIONPREVENTION AND SEDIMENT CONTROL BMPS WHO WILL COORDINATE WITH ALL CONTRACTORS, SUBCONTRACTORS, ANDOPERATORS ON-SITE TO OVERSEE THE IMPLEMENTATION OF THE SWPPP. [MINN. R. 7090]5.22 THE SWPPP MUST DESCRIBE ANY SPECIFIC CHEMICALS AND CHEMICAL TREATMENT SYSTEMS USED FOR ENHANCING THESEDIMENTATION PROCESS AND HOW IT ACHIEVES COMPLIANCE WITH ITEM 9.18. [MINN. R. 7090]5.23 THE SWPPP MUST IDENTIFY THE PERSON(S), ORGANIZATIONS, OR ENTITIES RESPONSIBLE FOR LONG-TERM OPERATIONAND MAINTENANCE OF PERMANENT STORMWATER TREATMENT SYSTEMS. [MINN. R. 7090]5.24 THE SWPPP MUST DESCRIBE METHODS TO MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL. MINIMIZING SOILCOMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA DICTATES COMPACTION. [MINN. R. 7090]5.25 THE SWPPP MUST INCLUDE ANY SITE ASSESSMENTS FOR GROUNDWATER OR SOIL CONTAMINATION REQUIRED IN ITEM16.15.[MINN. R. 7090]5.26 THE SWPPP MUST ACCOUNT FOR THE FOLLOWING FACTORS IN DESIGNING TEMPORARY EROSION PREVENTION ANDSEDIMENT CONTROL BMPS:a.THE EXPECTED AMOUNT, FREQUENCY, INTENSITY, AND DURATION OF PRECIPITATION; ANDb.THE NATURE OF STORMWATER RUNOFF AND RUN-ON AT THE SITE, INCLUDING FACTORS SUCH AS EXPECTED FLOW FROMIMPERVIOUS SURFACES, SLOPES, AND SITE DRAINAGE FEATURES; ANDc.THE STORMWATER VOLUME, VELOCITY, AND PEAK FLOWRATES TO MINIMIZE DISCHARGE OF POLLUTANTS INSTORMWATER AND TO MINIMIZE CHANNEL AND STREAMBANK EROSION AND SOUR IN THE IMMEDIATE VICINITY OF DISCHARGEPOINTS; ANDd.THE RANGE OF SOIL PARTICLES SIZES EXPECTED TO BE PRESENT. [ MINN. R. 7090]11.1 INSPECTIONS AND MAINTENANCE. [MINN. R. 7090]11.2 PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRE CONSTRUCTIONSITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENTGREATER THAN 1/2 INCH IN 24 HOURS. [MINN. R. 7090]11.3 PERMITTEES MUST INSPECT AND MAINTAIN ALL PERMANENT STORMWATER TREATMENT BMPS. [MINN. R. 7090]11.4 PERMITTEES MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION PREVENTIONMANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS. PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENTALL NONFUNCTIONAL BMPS WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY UNLESSANOTHER TIME FRAME IS SPECIFIED IN ITEM 11.5 OR 11.6. PERMITTEES MAY TAKE ADDITIONAL TIME IF FIELD CONDITIONSPREVENT ACCESS TO THE AREA. [MINN. R. 7090]11.5 DURING EACH INSPECTION, PERMITTEES MUST INSPECT SURFACE WATERS, INCLUDING DRAINAGE DITCHES ANDCONVEYANCE SYSTEMS BUT NOT CURB AND GUTTER SYSTEMS, FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION.PERMITTEES MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS,CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS INEXPOSED SOIL. PERMITTEES MUST COMPLETE REMOVAL AND STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS OFDISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. PERMITTEES MUST USE ALLREASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7)DAYS OF OBTAINING ACCESS. PERMITTEES ARE RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERALAUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS. [MINN. R.7090]11.6 PERMITTEES MUST INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS AND CURB AND GUTTER SYSTEMSWITHIN AND ADJACENT TO THE PROJECT FOR SEDIMENTATION FROM EROSION OR TRACKED SEDIMENT FROM VEHICLES.PERMITTEES MUST REMOVE SEDIMENT FROM ALL PAVED SURFACES WITHIN ONE (1) CALENDAR DAY OF DISCOVERY OR, IFAPPLICABLE, WITHIN A SHORTER TIME TO AVOID A SAFETY HAZARD TO USERS OF PUBLIC STREETS. [MINN. R. 7090]15.1 PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]15.2 PERMITTEES MUST DESIGN THE PROJECT SO ALL STORMWATER DISCHARGED FROM THE PROJECT DURING AND AFTERCONSTRUCTION ACTIVITIES DOES NOT CAUSE A VIOLATION OF STATE WATER QUALITY STANDARDS, INCLUDING NUISANCECONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR A SIGNIFICANT ADVERSE IMPACT TOWETLANDS CAUSED BY INUNDATION OR DECREASE OF FLOW. [MINN. R. 7090]15.3 PERMITTEES MUST DESIGN AND CONSTRUCT A PERMANENT STORMWATER TREATMENT SYSTEM TO TREAT THE WATERQUALITY VOLUME IF THE PROJECT'S ULTIMATE DEVELOPMENT REPLACES VEGETATION AND/OR OTHER PERVIOUS SURFACESCREATING A NET INCREASE OF ONE (1) OR MORE ACRES OF CUMULATIVE IMPERVIOUS SURFACE. [MINN. R. 7090]15.4 PERMITTEES MUST CALCULATE THE WATER QUALITY VOLUME AS ONE (1) INCH TIMES THE NET INCREASE OF IMPERVIOUSSURFACES CREATED BY THE PROJECT. [MINN. R. 7090]15.5 PERMITTEES MUST FIRST CONSIDER VOLUME REDUCTION PRACTICES ON-SITE (E.G., INFILTRATION OR OTHER) WHENDESIGNING THE PERMANENT STORMWATER TREATMENT SYSTEM. IF THIS PERMIT PROHIBITS INFILTRATION AS DESCRIBED INITEM 16.14 THROUGH ITEM 16.21, PERMITTEES MAY CONSIDER A WET SEDIMENTATION BASIN, FILTRATION BASIN OR REGIONALPOND. THIS PERMIT DOES NOT CONSIDER WET SEDIMENTATION BASINS AND FILTRATION SYSTEMS TO BE VOLUME REDUCTIONPRACTICES. [MINN. R. 7090]17.1 FILTRATION SYSTEMS. [MINN. R. 7090]17.2 FILTRATION OPTIONS INCLUDE, BUT ARE NOT LIMITED TO: SAND FILTERS WITH UNDERDRAINS, BIOFILTRATION AREAS,SWALES USING UNDERDRAINS WITH IMPERMEABLE CHECK DAMS AND UNDERGROUND SAND FILTERS. IF PERMITTEES UTILIZE AFILTRATION SYSTEM TO MEET THE PERMANENT STORMWATER TREATMENT REQUIREMENTS OF THIS PERMIT, THEY MUSTCOMPLY WITH ITEMS 17.3 THROUGH 17.11. [MINN. R. 7090]17.3 PERMITTEES MUST NOT INSTALL FILTER MEDIA UNTIL THEY CONSTRUCT AND FULLY STABILIZE THE CONTRIBUTINGDRAINAGE AREA UNLESS THEY PROVIDE RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSIONBERMS) TO KEEP SEDIMENT AND RUNOFF COMPLETELY AWAY FROM THE FILTRATION AREA. [MINN. R. 7090]17.4 PERMITTEES MUST DESIGN FILTRATION SYSTEMS TO REMOVE AT LEAST 80 PERCENT OF TSS. [MINN. R. 7090]17.5 PERMITTEES MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL SEDIMENTATION BASIN,WATER QUALITY INLET, FOREBAY OR HYDRODYNAMIC SEPARATOR TO REMOVE SETTLEABLE SOLIDS, FLOATING MATERIALS,AND OILS AND GREASE FROM THE RUNOFF, TO THE MAXIMUM EXTENT PRACTICABLE, BEFORE RUNOFF ENTERS THEFILTRATION SYSTEM. [MINN. R. 7090]17.6 PERMITTEES MUST DESIGN FILTRATION SYSTEMS TO TREAT A WATER QUALITY VOLUME (CALCULATED AS ANINSTANTANEOUS VOLUME) OF ONE (1) INCH OF RUNOFF, OR ONE (1) INCH MINUS THE VOLUME OF STORMWATER TREATED BYANOTHER SYSTEM ON THE SITE, FROM THE NET INCREASE OF IMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN. R.7090]17.7 PERMITTEES MUST DESIGN THE FILTRATION SYSTEM TO DISCHARGE ALL STORMWATER (INCLUDING STORMWATER INEXCESS OF THE WATER QUALITY VOLUME) ROUTED TO THE SYSTEM THROUGH THE UPPERMOST SOIL SURFACE ORENGINEERED MEDIA SURFACE WITHIN 48 HOURS. ADDITIONAL FLOWS THAT THE SYSTEM CANNOT FILTER WITHIN 48 HOURSMUST BYPASS THE SYSTEM OR DISCHARGE THROUGH AN EMERGENCY OVERFLOW. [MINN. R. 7090]17.8 PERMITTEES MUST DESIGN THE FILTRATION SYSTEM TO PROVIDE A MEANS TO VISUALLY VERIFY THE SYSTEM ISDISCHARGING THROUGH THE SOIL SURFACE OR FILTER MEDIA WITHIN 48 HOURS. [MINN. R. 7090]17.9 PERMITTEES MUST EMPLOY APPROPRIATE ON-SITE TESTING TO ENSURE A MINIMUM OF THREE (3) FEET OF SEPARATIONBETWEEN THE SEASONALLY SATURATED SOILS (OR FROM BEDROCK) AND THE BOTTOM OF THE PROPOSED FILTRATIONSYSTEM. [MINN. R. 7090]17.10 PERMITTEES MUST ENSURE THAT FILTRATION SYSTEMS WITH LESS THAN THREE (3) FEET OF SEPARATION BETWEENSEASONALLY SATURATED SOILS OR FROM BEDROCK ARE CONSTRUCTED WITH AN IMPERMEABLE LINER. [MINN. R. 7090]17.11 THE PERMITTEES MUST DESIGN A MAINTENANCE ACCESS, TYPICALLY EIGHT (8) FEET WIDE, FOR THE FILTRATION SYSTEM.[MINN. R. 7090]APPLE ACADEMY DAY CARE