Laserfiche WebLink
Page 2 <br />Adelaide Landing Park <br />June 3, 2019 <br />The concept plan for the active area of the park includes large picnic shelter and playground <br />scaled to accommodate the size of the neighborhood, two pickle-ball courts, a half-court for <br />basketball, and off-street parking for 35 vehicles in the north portion of the park. There is a <br />wooded ditch and powerline corridor separating the park into “north” and “south” areas. The <br />south portion will include an open ball field. The two park areas are connected on both sides by <br />trails. <br /> <br />With the fourth, fifth and sixth phases, it is anticipated that Excelsior Group will construct 147 <br />units and dedicate an additional $165,816 in park dedication fees. This will be reduced in <br />exchange for construction of the parking lot, internal sidewalks, and sport courts which are <br />currently estimated at $120,000 to $160,000. The Parks Commission anticipates construction of <br />the remaining park features to not exceed $350,000, which was included in their CIP. <br /> <br />4. NEXT STEPS: <br /> <br />Construction plans will be drafted and work will start to build the future park. The neighborhood <br />will be invited to select the playground equipment. The park will need to be named. <br /> <br />5. RECOMMENDATION: <br /> <br />The Parks, Recreation, and Open Space Commission recommends approval of the plan and <br />construction of the unnamed park in Adelaide Landing. <br /> <br /> <br />ATTACHMENTS <br />1) Adelaide Landing Park Plans <br />2) Parks CIP 2019-2023 <br /> <br />