My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\Rachel\DEVELOPMENT PROJECTS\Waters Edge\Waters Edge 6th - Fred Stelter\Final Plat\Engineers Memo Waters Edge 6th Final Plat - 05 30 19 (002).docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM <br /> <br />May 30, 2019 <br /> <br /> <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Final Plat Review <br /> Waters Edge 6th Addition <br /> WSB Project No. 3288-090 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the revised preliminary plat submittal for the above-referenced project. In <br />particular, we have reviewed the following plans related to this particular request: <br /> <br />• Revised Preliminary Plans dated 4/22/19 by Landform <br />• Waters Edge Sixth Addition Final plat <br /> <br />Based on the review of the revised preliminary plan documents, we offer the following comments <br />related to this application: <br /> <br />Preliminary Plat <br /> <br />1. The Plat accurately indicates drainage and utility easements over the entirety of lot 38, <br />which includes all areas outside of each of the 37 individual lots. A trail easement along the <br />westerly boundary of the plat is required to be provided, however no trail is proposed to be <br />constructed at this time. <br /> <br />Development Agreement <br /> <br />2. There are a number of development fees outlined within the City’s Fee Schedule that will <br />become due as part of the final plat. <br /> <br />Grading, Street, and Utility Plans <br /> <br />3. Plans and Development Agreement will need to clearly identify maintenance responsibilities <br />for street, sanitary sewer, watermain, storm sewer, and retaining walls etc. The main line <br />sanitary sewer and watermain with be public infrastructure while the remaining will be private. <br /> <br />Wetland/Drainage <br /> <br />4. No wetland impacts are proposed as part of the proposed improvements. <br />5. Analysis was performed to ensure previous stormwater management facilities are <br />appropriately sized. Overall there is less impervious coverage that the previously approved <br />project. <br /> <br />Revised Water Reuse Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.