HomeMy WebLinkAbout6.17.20 Park Minutes Minutes
Parks, Recreation, and Open Space Commission
Meeting of June 17, 2020
Hugo City Hall, 7:00 pm
Meeting held remotely pursuant to Minn. Stat. Sec. 13D.021
Present: Roger Clarke, Shawn Haag,Cathy Moore—Arcand, Nicole Schmid, Dave Strub, Ranell Tennyson
Absent: Mat Rauschendorfer
Staff Present: Scott Anderson, Public Works Director
Shayla Denaway, Parks Planner
Strub called the meeting to order at 7:03 pm.
1. Approval of Minutes from the May 20, 2020 Meeting
Moore—Arcand made a motion, Haag seconded to approve the minutes of the May 20, 2020 Parks
Commission Meeting with a correction made to the date listed under the Lions Park Feasibility Study for the
Parks Commission Meeting be changed from June 18, 2020 to June 17, 2020.
Ayes:Shawn Haag, Cathy Moore—Arcand, Nicole Schmid, Dave Strub, Ranell Tennyson
Motion carried.
Clarke joined remote meeting.
2. Lions Park Feasibility Study
Development Guidelines for Lions Park were approved by the City Council on November 15, 2011 and a
Preliminary Master Plan for Lions Park was approved on March 2, 2014. On May 13, 2019 the City Council
and Parks Commission held a workshop to discuss funding of community parks.At the meeting of June 19,
2019 the Parks Commission identified their priorities for community park development and these priorities
were presented to the City Council at their budget workshop on September 5, 2019.The City Council included
"prepare for and begin construction of new Lions Park"on their goals for 2020.The Parks Commission
discussed a work plan for Lions Park at their February 19, 2020 meeting. The first step was a feasibility study
which included master plan updates, a phasing plan, and updated cost estimates. The Hugo City Council
approved the feasibility study at their April 20, 2020 meeting with their discussion on the Road Capital
Improvement Plan.
As the first step in the feasibility study Candace Amberg,with WSB and Associates, presented three concepts
plans to the Parks Commission that included minor revisions to the Preliminary Master Plan. Amberg shared
Page 1 of 4
Parks Commission Minutes
June 17,2020
that the goal is to look at various options and find a preferred approach to get one plan together. After that
will come the next steps in the design process and starting to work with an architect to figure out what
options the main park multiple use building should include.
All options included modifying the parking lot on the west side to accommodate the Hugo Gardens
Apartment development. Additional parking was added along the streets. A possible storage building was
shown. The main pavilion was in the same location with an optional fire pit area. An alignment of 147th
Street that includes a trail on the north side was shown. Each of the three options showed different
configurations of the City Hall parking lot, pavilion and play features.
Option 1 closely followed the original master plan and included both playground and splash pad options and
allowed for the possibility of moving the ballfield away from the playground. Option 2 removed the splash
pad and allowed for a larger playground. Changes to the parking lot at City Hall were shown that would make
it a through road. Also shown were changes to the memorial space and a smaller fire pit area next to the
pavilion. Option 3 added an interactive water feature and changed the location of the fire pit area.Also, a
traffic circle was placed in the City Hall parking lot to help slow traffic.
Parks Planner Shayla Denaway provided an update on 147th Street. Staff is working closely with the Hugo
Gardens Apartment development on the construction of Finale Avenue.The City is looking at 147th Street as a
future road improvement project but there are issues with the amount of right-of-way on 147th Street which
complicates the placement of the trail. The City Council would prefer that the trail be located on the north
side of 147th Street and Staff will be talking with property owners about easements to require the necessary
right-of-way. Denaway will provide updates to the Commission when available.
Amberg provided updated costs to the Commission. Currently,the costs are just budgetary figures and will
change as things progress. The main park multiple use building has a wide price range depending on what
options the Commission chooses. An inclusive playground would also add a large expense.
Commissioners Strub and Moore—Arcand preferred the City Hall parking lot arrangement in Option 1 and
felt that Fitzgerald Avenue should not be a through street. Moore—Arcand was concerned about the limited
amount of close parking spaces to the City Hall building.
Commissioner Tennyson favored keeping the ballfield close to the playground so that parents would be able
to watch children who wanted to do different activities. Moore—Arcand agreed that was a good idea.
Commissioner Strub believed that there would be various outside organizations, like Veteran groups,that
would help fund the memorial. Strub also commented the he liked the idea of the fire pit area and
questioned if infrastructure was figured in to the plan for Good Neighbor Days.
The Commissioners discussed the differences between a splash pad and an interactive water feature.They
also discussed the differences between a flow through system and a recirculating system. It was the overall
consensus of the Parks Commission that they would like to include a water feature in the master plan. The
Commissioners felt that it was important to have a feature like this to draw in the community and to help
revitalize the downtown area.
Denaway stated that a joint workshop with the City Council to discuss the Lions Park Feasibility Study and to
review the concepts and cost estimates is scheduled for Monday,June 29, 2020.
Page 2 of 4
Parks Commission Minutes
June 17,2020
3. Proposed Public. Works Facility
Public Works Director Scott Anderson gave an update on the proposed Public Works Facility that could
possibly be constructed on 10 to 15 acres of the 125 acre Irish Avenue Park. Staff and Consultants have been
working hard on the design of the proposed facility and now with most of the major components in place,
they are looking more closely at the small details. Letters have been mailed to residents surrounding Irish
Avenue Park and notices have been posted in the park notifying neighbors and park users of a Neighborhood
Meeting scheduled for Thursday,June 18, 2020 with the City Council. Anderson encouraged the
Commissioners to attend the meeting. Anderson shared new renderings of the proposed facility that showed
various outside adjustments, including the placement of trees,the size of the asphalt drive and the location
of the salt storage shed. He noted that they are leaving room for feature expansion on the site.
Commissioner Clarke and Anderson met on location to walk the current trails and to discuss the placement of
new trails. Anderson shared a map of the park that showed existing trails and options for new trails. Clarke
said he believes that changing the placement of some of the trails, along with the addition of new trails
would add enticements like varied routes, curves and shade, and some diversity for viewing trees and
flowers.
Commissioner Strub asked about access to the park and if it would only be from Irish Avenue or if the public
would be able to use the Public Works Facility parking lot. Anderson said that the parking lot by the facility
would be open to the public and have a trail that leaves the parking lot and connects to the rest of the trails
in the park.
The Commissioners all agreed that they would like to see a trail around the facility and stated that they liked
the added trail options.
4. Clearwater Creek Preserve/JD 3 Update
Parks Planner Shayla Denaway provided an update regarding the Judicial Ditch No. 3 repair project being
undertaken by the Rice Creek Watershed District (RCWD) in Clearwater Creek Preserve that was initially
discussed at the February 19, 2020 Parks Commission Meeting. RCWD is moving ahead with the ditch
maintenance project and will be creating a maintenance path to access the ditch for cleaning. As agreed
upon in initial discussions, RCWD will construct the maintenance path in a location that will help improve the
use of the park by residents. RCWD will be installing two culverts with a maintenance path on top that will
also double as a trail so that pedestrians can access the park and heavy equipment will be able to access the
ditch for future maintenance. This will enhance the use of the park and create opportunities for the City to
construct additional walking paths. RCWD has asked for an agreement to use the main entrance of the park
for access and will start the project in a couple of weeks.
Commissioner Clarke mentioned that RCWD is providing a huge benefit for the City by installing the
maintenance path in a manner that can double as a pedestrian path because these trails would be very
expensive to construct as part of the Master Plan.
5. Recreation Program Update
Parks Planer Shayla Denaway shared with the Commission that the COVID-19 pandemic has caused several
recreation opportunities in Hugo to be cancelled, but with Governor Walz relaxing the Stay At Home Order
some programs have been able to resume.
Page 3 of 4
Parks Commission Minutes
June 17,2020
On June 10, 2020 the fields at Hanifl opened and the Associations provided return to play plans with phased
approaches. White Bear Lake Area School District has also implemented many policies for their programing,
along with field use policies which are consistent with the City's policies. There is an interested party
proposing an adult flag football league at Lions Park and Staff is working with them on a permit.
Youth enrichment camps are now being held, however they have moved to Otter Lake Elementary School.
Hugo residents can still participate;the programs were moved from City community rooms to Otter Lake so
that the camp leaders would be better able to control the environment.
Washington County Library has suspended all programs throughout the summer, but they are providing
virtual programing and are currently opening up a limited amount of spaces for in-house library use. In the
fall,Staff believes that they will hold Story Hour at Hugo Elementary School
The Forest Lake YMCA has been doing a lot of great work during the pandemic. They are providing meals and
outreach to seniors in the community and in Hugo they have opened up Park Play Days as scheduled and are
playing outside at Hanifl Fields Monday thru Thursday with about a dozen kids participating. Commissioner
Tennyson shared that the YMCA is looking for volunteers, both to help deliver the meals to seniors and to
also provide financial assistance for the program.
6. Adjournment
Moore—Arcand made a motion,Schmid seconded to adjourn the meeting at 8:36 pm.
Ayes: Roger Clarke, Shawn Haag,Cathy Moore—Arcand, Nicole Schmid, Dave Strub, Ranell Tennyson
Motion carried.
Page 4of4
Parks Commission Minutes
June 17,2020